Ready project Hotel with capacity for 30 rooms.

CODE - HT-054

Ready project Hotel with capacity for 30 rooms.

CODE - HT-054


Project ready with:

Enterprise with the following sections:
Reception
Rooms
Restaurant
Kitchen
Bathrooms
Laundry
Parking Lot
Administration
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Hotel

How to start Hotel with capacity for 30 rooms. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Hotel

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Hotel Projects With 30 Apartments | Floor Plan for Hotel Projects with 30 Apartments | Project for a 30-Apartment Hotel | Hotel Construction Project Model for 30 Apartments | Opening a Hotel Business | Plan for the construction of a hotel with 30 apartments | Cost of Setting Up a Hotel with 30 Apartments | Hotel Project 30 Apartments | Ready-made Hotel Projects | Design of a 30-Apartment Hotel | Hotel Plans for Up to 30 Apartments | Hotel Plan of 30 Apartments | Hotel Project Floor Plan 30 apartments | Budget for Construction of a Hotel with 30 Apartments | Hotel Project With 30 Apartments | Floor Plan Of A 30-Apartment Hotel | Hotel Projects with Up to 30 Apartments | Business Hotel Projects 30 Apartments | Hotel Model With 30 Apartments | Plan to Build a Hotel with 30 Apartments | Hotel Profitability | .hotelprojects | Hotel Project 30 Apartments | How to Set Up a Hotel with 30 Rooms | Hotel Plans With 30 Apartments | Hotel Ht 30 | Hotel Profitability Projects | Hotel Apartment Projects | 30-Apartment Hotel Floor Plan | Profitability of a Hotel with 30 Apartments | Model Construction Project Hotel 30 Apartments | Plan for 30-Apartment Hotel | Washing Powder Flowchart | Mini Supermarket Plants | I Want to Open an Equipment Rental Store | Open Car Dealership | I Want to Open a Dairy Distributorship | Footwear Store Flowchart | What You Need to Set Up a Party Supply Rental Store | What is the minimum area to set up a manipulation laboratory? | How to Start a Beverage Company | Nursery School Financing | Treat Quail | Beef Sausage Production | Sports Center Floor Plan | How to Set Up an Operating Room | Pop Nursing Ubs | Physical Layout Design of the Uti Area | What It Takes to Open a Steakhouse | Preparation of a Supermarket | Training Flowchart Template | How Much Does It Cost to Open a Nightclub | Concrete Ramp Projects for Car Wash | What is needed to set up a dance club? | Quantity And Price For Toothbrush Production | Manufacturing of Plasticine Mass | Ready-made work for a women's jeans store | Set Up a Bag Factory | Set up PVC window frame factory | Buy Sawhorses And Cones | Furniture Factory Flowchart | DWG Concrete Plant | How to Open a Fruit and Vegetable Business | Aluminum Cookware Manufacturers | How to Set Up an Exhaust Factory | Set up Veterinary Clinical Analysis Laboratory | Dairy Academic Projects Template | Aqua Minerau Assembly | Open a Parking Company | Standard Operating Procedure for Integrated Pest Control | Clinical Analysis Pop Template | Beauty Salon Projects | How to Set Up a Project in the Forestry Nursery Area | Vehicle Tracking How to Set Up a Business | Card Graphic on Tracing Paper | Refrigeration Workshop Plant | Record Label Business Model | I Want to Set Up a Pasta and Bread Factory | How to Set Up a Food Canning Factory | Mini Cashew Processing Plant - Where to Buy | Difference Between Schoyu and English Sauce | Bakery Plant |

 

Other projects ready:

How to start Factory to ProProduce Fruit Sweet in Syrup with capacity for 10.000 Kg/day.
Project Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 250.000 Units per day.
PDF Factory to Produce Pequi Paste and Canned Pequi with capacity for 1.000 Kg per day
Plant and layout Factory to Recycle Paper with capacity for 10.000 Kg/day.
Project Factory to Produce Fruit Polp Cocktails with Alcoholic Drinks (Caipirinha, Lime Liqueur, Lime Cream, Aromatic Mix with Lime, Strawberry, Cupuaçú, Melon, Açaí, Mango and Guaraná) and Teas, with capacity for 10.000 liters/day.
Project Factory to Produce Pierced Bricks with capacity for 5.000 units per day.
FeasibilityBonded Warehouse for Poultry Meat with capacity for 3.000 Kg/day.
Business plant Milk and Dairy Industry to Produce Organic Cheese and Yoghurt with an area of 120 m2 and capacity for 4.000 liters/day.
Project Factory to Produce Biomass of Banana with capacity for 5.000 Kg per day.
How to start Swine Farm (Conventional) with capacity to Produce 168 Matrix.

Project - how to start Hotel with capacity for 30 rooms.