Ready project Industrial Bakery to Produce Cakes with capacity for 300 Kg/day.

CODE - TRG-146

Ready project Industrial Bakery to Produce Cakes with capacity for 300 Kg/day.

CODE - TRG-146


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking de Raw Material
Storage for Additives and Ingredients
Storage for Packages
Production
Storage for Finished Products
Cooling Chamber
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industrial Bakery to Produce Cakes

How to start Industrial Bakery to Produce Cakes with capacity for 300 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industrial Bakery to Produce Cakes

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Bakery Financing Bnds | First Company Financing Padaria2727 | Manufacturing Process Flowchart For Detergent And Soap | Mine Market Plants | What Equipment to Set Up a Rental Store for Construction | Open a Used Vehicles Company | Cold Store Project | Shoe Store Consulting | Set Up a Party Utensil Rental Company | S Projects for Compounding Pharmacies | How to Import Beverages | Feasibility Study of a College | Capybara Slaughter Project | Create a Sausage Factory Organization Chart | Sports Center Models | How to Set Up a Small Surgical Equipment Factory | Pop In Basic Unit Of | Physical Plan Drawing of a Medical Unit | Setting Up a Steakhouse | Supermarket Floor Plan Drawing | Functional Chart of a Gym | How Much Does It Cost to Open a Nightclub? | Car Wash Projects | What It Takes to Set Up a Dance Club | What Is The Process For Making Toothbrush | Plastic Pasta Factory For Sale | What is the value of each piece of jeans in the factory? | Set Up Leather Bag Factory | PVC Frame Models | Water Easel.dwg | School Desk Flowchart | Open Concrete Company | How to Organize a Packing Warehouse | Manufacturing Aluminum Pans | How to Set Up an Exhaust Factory | Law on Animal Clinical Analysis Laboratory | Dairy Industry Layout | Bottling Flowchart | Rules for Setting Up a Vehicle Parking Lot | Standard Operating Procedure Maintenance | Pop Model (Standard Operating Procedure) Ready External Sample Transport | Hair Salon Cad Projects | How to Set Up a Seedling Nursery Project | I Want to Set Up a Tracking Company | Materials for Handmade Cards | WHAT DO I NEED TO SET UP A Refrigeration Maintenance Workshop? | Recording Company How to Set Up | How to Set Up a Popsicle Factory | .ice cream cone factory | How Do They Make Canned Corn? | Cashew Nut Opening Machines | How to Make Soy Sauce | I Want to Open a Bakery for Dogs |

 

Other projects ready:

How to start Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 1.000 Units per day.
Project Factory to Produce Liquid Chocolate with capacity for 1.000 liters por day.
PDF Factory to Process Canned Mushroom with capacity for 500 Kg per day.
Plant and layout Center of Plagues and Insects Control with an area of 100 m2.
Project Factory to Produce Granola with capacity for 1.000 Kg per day.
Project Egg Sorters with capacity for 1.000 Eggs/day.
FeasibilityCafé with capacity for 300 people.
Business plant Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Whey Cheese, Cheese with Blue Mould (Roquefort, Gorgonzola), Cheese with White Mould (Camembert, Brie), with capacity of 5000 liters/day.
Project Rice Mill to Produce Rice Starch with capacity for 1.000 Kg/day.
How to start Drink Deliverer with capacity for 30.000 liters/day.

Project - how to start Industrial Bakery to Produce Cakes with capacity for 300 Kg/day.