Ready project Industrial Bakery to Produce Cakes with capacity for 5.000 Kg/day.

CODE - TRG-150

Ready project Industrial Bakery to Produce Cakes with capacity for 5.000 Kg/day.

CODE - TRG-150


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking de Raw Material
Storage for Additives and Ingredients
Storage for Packages
Production
Storage for Finished Products
Cooling Chamber
Offices
Canteen
Dressing Rooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industrial Bakery to Produce Cakes

How to start Industrial Bakery to Produce Cakes with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industrial Bakery to Produce Cakes

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Plan to Build Bakery | Veterinary Model Cake | Cake Production Business Plan Template | Credit to Set Up a Bakery | How to Make a Bakery Makete | Loan to Set Up a Bakery | How to Make a Cake Mockup | Cake Production Company | Industrial Bakery Business Plan | Products for Making Hair Cream | Esoteric Stores | How to Open Rental Cars | Setting Up a Dealership | Natural Products Store Facade | Floor Plan Shoe Stores | How to Make a Sheep Project | What is Dml in Compounding Pharmacy | Riding School Project | Rabbit Slaughtering Refrigerator | Budget for Salami Factory | DWG Design Model Of A Football Stadium | Surgical Center Assembly | Physiotherapy Stores With Financing | Barbecue Restaurant Floor Plan In DWG | Supermarket Floor Plans and Facades | DWG Academy Project | Bowling Lane Construction | Quick Wash Cad | Amount Needed to Open a Dance Club | Set Up A Brush Factory | Educational Toys Project | Panties Production Flowchart | Layout for bag factory | Pvc Laminate Manufacturing Equipment | Necessary Documentation to Set Up a Plastic Wood Factory | Furniture Design and Manufacturing | Business Plan for Concrete Block Factory | Organizational Chart of a Concrete Company | How to Set Up a Box Factory | Aluminum Cookware Manufacturing Process | I want to open a wire mesh factory | Dental Prosthetics Laboratory Business Plan Ready | Floor Plan of a Dairy Factory | Ice Plant Flowcharts | How a Battery Factory Works | Hotel Cleaning Standard Operating Procedures | Ready-made Medication Disposal Pop-Up Templates | Flowchart In A Real Estate Company | Seedling Nursery Assembly | Internet Provider Business Plan | Set Up a Leafleting Company | Workshop That Cracks Refrigeration In Refrigerated Truck | Bndes Photographic Equipment | Project Model for Working with Pulp | Main Customers of a Cheese Bread Company | Wine Business Flowchart Template | Nutritional Table Information About Dehydrated Onions | Guaran Syrup Processing Machines25c325a1 | How to Make Tofu Cheese. | How to Open a Cemetery Company |

 

Other projects ready:

How to start Tannery with capacity to Produce 100 Cattle Leather per day, and built area of 1.000 m².
Project Clothing Industry to Produce Tactel Pants and Jackets with capacity for 300 garments/day.
PDF Factory to Produce Pastry Dough with capacity for 10.000 kg/day.
Plant and layout Factory to Produce Banana Chips with capacity for 300 kg/day.
Project Factory for automatic processing of Fruit compote with an area of 500 m² (598 sq.yd.) and capacity for 7.500 kg/day.
Project Factory to Produce Medical Oils with capacity for 50 liters/day.
FeasibilityFactory to Produce dand White Wine (Prosecco) of Honey with capacity for 1.000 liters/day.
Business plant Milk and Dairy Industry for Yogurt production, Milk Beverages, Packed Milk types B and C, with capacity of 6000 liters/day.
Project Factory to Produce Brooms with capacity for 15.000 units per day.
How to start Factory to Produce Ice Cream and Fruit Pulp (Ice Cream + Pulp) with capacity for 100 Kg/day.

Project - how to start Industrial Bakery to Produce Cakes with capacity for 5.000 Kg/day.