Ready project Industrial Laundry with capacity for 2.000 kg of Clothes per day.

CODE - LV-020

Ready project Industrial Laundry with capacity for 2.000 kg of Clothes per day.

CODE - LV-020


Project ready with:

Laundry with the following sections:

Reception
Packaging
Weighing
Classification
Washing
Sanitary Barrier
Drying
Ironing
Separation
Folding
Sewing
Distribution
Storage
Storage for Cleaning Material
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industrial Laundry

How to start Industrial Laundry with capacity for 2.000 kg of Clothes per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industrial Laundry

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Laundry Price List | Laundry Financing Project Template | Industrial Laundry Models | Industrial Laundry Price List | Laundry Price List | 11 | How to Raise Free Range Chickens | Flavoring Packaging Factory | What It Takes to Open an Electrical Supply Store | Oil Change Shops | Place to Set Up Exhaust Shop | Fruit and Vegetable Trading Is a Good Business | Ready-Made Toy Store Business Plan | Sale of Project Tables | Setting up a Paçoca Factory | Commercial Beverage Distributor Plant | Organizational Chart of a Recycling Company | Business Plan Viability for Gastronomy School | Fish Processing Vessel | How to Start a Refrigerator | Equipment in a Physiotherapy Room | Why Set Up a Digital X-Ray Clinic | 100 Bed Hospital Project | Motel Floor Plan | Swimming Projects | Restaurant Floor Plan Tips | Floor Plan2fsections And Facade Of A Gas Station | Restaurant Plant (fast food) | Aesthetic Room Baxia Plant | Download Disposable Diaper Business Plan Examples | Gel Making Equipment | Shirt Making Production Flowchart | How the Doll is Made | How to Set Up an Injection Molding Factory | Where to Buy Parts to Make Hair Clips | How to Assemble Clothes Pegs at Home | Mold for Assembling a Pool Table | How to Set Up a Standard Post Factory | Ready-Made Freight Elevator Projects for Construction Sites | Aluminum Casting Factory Projects | Set Up Chair Factory | Budget for Setting Up a Clinical Analysis Laboratory | How to Run a Cheese Business | QuickFacade | How to Make a Mechanical Workshop Floor Plan | Rastrabiliade Pop | Rodeo Arena Floor Plan | I Want to Set Up a Waste Disposal Company | Document Scanning Business Plan Ready | Advertising Office Project Template | Cell Phone Repair Equipment Tool | Executive Project Model of an Artesian Well | Ecological Bricks Business Plan | Material for setting up a snack factory | Layout Selection of a Biscuit Factory | Spice Industry Business Plan Organization Chart Template | P2f Yerba Mate Plastic Packaging | Dog House Constructions |

 

Other projects ready:

How to start Slaughterhouse Bovines and Swines with capacity to Slaughter 400 animals/day.
Project Factory to Produce Tomato Extract and Tomato Pulp with capacity for 40.000 Kg per day.
PDF Slaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 700 animals/day.
Plant and layout Pre-School with capacity for 500 children per day.
Project Factory to Produce Frozen Fruit Pulp with capacity for 500 Kg/day.
Project Industrial Kitchen without Restaurant with capacity for 1.000 meals per day.
FeasibilityBaiana Kitchen with capacity for 100 meals per day.
Business plant Factory to Produce Gauze Compress (without Sterilization) with an area of 250 m².
Project Factory to Produce Alcohol Gel with capacity for 10.000 liters/day.
How to start Clothing Industry to Produce Jeans Pants with Laundry Sector (Stone Wash) with capacity for 50 garments/day.

Project - how to start Industrial Laundry with capacity for 2.000 kg of Clothes per day.