Ready project Industry to Produce Body Soap with capacity for 10.000 kg/day.

CODE - CM-049

Ready project Industry to Produce Body Soap with capacity for 10.000 kg/day.

CODE - CM-049


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking of Raw Material
Stocking of Packages
Body Soap and Soap in Bars Production
Stocking of Finished Products
Stocking of Products in Observation
Offices
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Industry to Produce Body Soap

How to start Industry to Produce Body Soap with capacity for 10.000 kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Industry to Produce Body Soap

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tips on How to Set Up a Soap Project | How to Register a Soap Factory | Soap Factory Ready Made Job | Cell Phone Store Business Plan | How Much Does a Batch of Automotive Batteries Cost to Resell | Newsstand Design | Cost To Open Japanese Products Store | Investment for Party Supplies | Clothing Store Set Up Project | How to Set Up a Candy Company | Figure Organizational Chart of Compounding Pharmacy | How Much Does It Cost to Set Up a Waste Recycling Plant? | How to Set Up School Support | Drying of Pig Blood | skewer | 3D Projects Of Society Field With Grandstands | How to Set Up an Acupuncture Clinic | Ready-made Projects for Physiotherapy | Bodybuilding Gym Project | Bar Restaurant Design | Minas Gerais Plant Theme Park | Set Up a Bowling Alley | Car Wash Ramp Project | Toy Production Process | T-Shirt Production With Piece-By-Piece Layout | Plastic Bag Production Flowchart | Ice Cream Shaped Food Clips | Layout In Office Furniture Factory | Precast Factory Layout | I want to manufacture gates | Paper Bag Assembly Machine | How to Set Up a Magnet Parts Factory | Cold Room for Milk | Motor Home With Assemble One | 3 Bedroom House Plans With En-Suite | How to Make Pharmacy Pops | Financial Operating Procedures Template | Transportation Company Business Plan Template | Os Template For Computer Assistance | Jewelry Studio Floor Plan | 3d Stand Planning | Buying a Site with Ranario | Making Ice Cream | How to Open a Pie Factory | Pheasant Nutrition | Caramelizing Machine | Palm Oil Factory Effluent | Animal Crematory Investment |

 

Other projects ready:

How to start Factory Extration and Drying of Brazil Nut (Castanha-do-Pará) with capacity to produce 1.000 Kg per day.
Project Factory to Produce Cachaça (Liquor), Mascavo(Brown Sugar), Rapadura and Melado with capacity for 500 liters/day. (To be built in a flat land).
PDF Tanning for Ostrich Skin, with capacity for 10 to 20 Skins per day and built area of 300 m².
Plant and layout Factory to Produce Vinegar made from Banana with capacity for 100 liters/day.
Project Municipal Market with capacity for 100 box.
Project Factory to Produce Macaroni for dry Pasta with capacity for 3.000 kg/day.
FeasibilityFactory to Produce Pepper and Pepper Sauce (in Natura Pepper, Canned Pepper, Dry Pepper, Red Pepper Flakes Calabresa Pepper) with capacity for 3.000 Kg per day.
Business plant Public Medical Clinic with an area of 250 m2.
Project Tanning Cattle Hides with capacity for 500 Hides/day.
How to start Factory to Produce Corn Juice with capacity for 3.000 liters per day.

Project - how to start Industry to Produce Body Soap with capacity for 10.000 kg/day.