Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Industry to Produce Footwear with capacity for 1.000 pairs/day.
CODE - IND-D-018
Ready project Industry to Produce Footwear with capacity for 1.000 pairs/day.
CODE - IND-D-018
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Cutting Room
Assembly Room (Sewing, Finish)
Checking and Packing
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Industry to Produce Footwear
OPTIONAL SERVICES:
Financial Feasibility Study of Industry to Produce Footwear with capacity for 1.000 pairs/day.
Business plan for Industry to Produce Footwear with capacity for 1.000 pairs/day.
3D project of Industry to Produce Footwear with capacity for 1.000 pairs/day.
Projects with other capacities
Industry to Produce Footwear
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Blueprint How To Make 1000 Pairs Of Shoes A Day
|
Footwear Production Layout
|
Flowchart for Footwear Design
|
Footwear Production Flowchart
|
Footwear Design Template
|
View Ready-Made Works About Shoe Companies
|
How to Design a Shoe Factory (Blueprint)
|
Footwear Production Flowchart
|
I Want to Open a Hardware Company
|
Layout for Perfumeries
|
Gas Station Layout
|
How to Set Up a Cafe What is the Cost?
|
How to Start a Landscaping Plant Store
|
Set Up Surwear Store
|
Dredging Flowchart
|
Physical Plant of Compounding Pharmacy
|
Business Plan for Tire Recycling Industry
|
Cold Room Condition for Deboning
|
Swiss Football Project Plan
|
Equipment Needed to Set Up a Radiology Clinic
|
Flowchart With Personnel Name
|
Industrial Cafeteria for One Hundred People
|
Lottery House Model Floor Plan
|
Hotel Consulting
|
Pizzeria Service Project
|
Nursing Home Business Plan Template
|
Stall Construction Project
|
Production of Phytotherapeutic Tablets
|
Marble Company Names
|
Art Work With Papier-mâché
|
How to Set Up a Small Bikini Factory
|
Shoe Industry Production Schedule
|
Balloon Projects
|
Barbecue Charcoal Packaging
|
I Want to Open a Lumberyard What Do I Need?
|
Floor Plan for Precast Industry
|
I Want to Build a Toy Car
|
Expanded Clay Equipment
|
Cage Making Machine
|
How to Set Up a Microbiology Room
|
Equipment for Producing Fresh Cheese
|
Hospital Dml
|
How Much Does It Cost to Have a Body Shop
|
With Skate Park Mount
|
Pop Drugstores and Pharmacies Standard Operating Procedure Templates
|
Refrigerator Procedure
|
Optical Laboratory Project
|
Tourism Business Plan
|
What Do I Need to Set Up a Construction Company?
|
Technical Assistance Store Facade
|
How to Open a Cleaning Business
|
Set up Mineral Salt Factory
|
Ceramic Machines
|
Bndes Bakery
|
Corn Snacks Distributor
|
Shed for Growing Mushrooms
|
How to Set Up a Banana Chips Factory
|
Dog Biscuit Machine
|
Other projects ready:
How to start Slaughterhouse for Bovines and Swines - 150 animals/day - area of 1.200 m² (1.435,2 sq.yd).
Project Farm to Produce Country Chicken (Frango Caipira) with capacity for 22.000 Chickens per day.
PDF Motel with 33 suites.
Plant and layout Comercial Kitchen with capacity for 1.000 meals per day.
Project Hotel (Resort) and Convention Center with 100 apartaments.
Project Slaughterhouse Poultry Slaughter, Cold Meat Production, Smoked Products and Breaded Chicken with capacity to slaughter 20.000 birds/day.
FeasibilityTannery for Wet Blue until Finishing Plant, with capacity for 500 leathers/day.
Business plant Factory to Produce Extruded Fodder for Fishes, Cats and Dogs with capacity for 500 Kg/day.
Project Unit of Buccal Health Care for Cities with until 50.000 inhabitants.
How to start Factory to Produce Chicken Sausages and Sliced Chicken with capacity for 1.000 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US