Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Industry to Produce Footwear with capacity for 500 pairs/day.
CODE - IND-D-017
Ready project Industry to Produce Footwear with capacity for 500 pairs/day.
CODE - IND-D-017
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Cutting Room
Assembly Room (Sewing, Finish)
Checking and Packing
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Industry to Produce Footwear
OPTIONAL SERVICES:
Financial Feasibility Study of Industry to Produce Footwear with capacity for 500 pairs/day.
Business plan for Industry to Produce Footwear with capacity for 500 pairs/day.
3D project of Industry to Produce Footwear with capacity for 500 pairs/day.
Projects with other capacities
Industry to Produce Footwear
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Footwear Manufacturing Flowchart
|
Floor Plan Factory Dwg Footwear Flip Flops
|
How to Get a Loan for the Footwear Industry
|
Footwear Production Organization Chart
|
Footwear Production Floor Plan
|
Softener Production
|
Budget to Open a Grocery Store
|
How to Set Up a Model Car Company
|
What You Need to Open a Hospital Supplies Company
|
Setting up Cold Meat Stores
|
How Much Do I Need to Set Up a Self-Service Ice Cream Shop?
|
Open a Glassware Business
|
I Want to Make Lingerie
|
How to Set Up a Surgical Equipment Store
|
Food Production Industry
|
Toy Library Project at Apae Pronto
|
Goat Slaughterhouse Project
|
Meat House For Sale With Sif
|
Economic Viability of Sports Court
|
Financing Medical Clinic
|
Observation Room of a Basic Unit
|
Standard Operating Procedure for Nursing in the ICU
|
Cafeteria Floor Plan Equipam2centos
|
Ready-made Supermarket Business Plan
|
Restaurant Dwg
|
Budget to Open a Nightclub
|
Design for Car Wash
|
Events House2c Project
|
Bee Venom Collector
|
Stamp Template For DWG
|
Jeans Production Layout
|
How to Style a Polo Shirt
|
Pet Broom Manufacturing Equipment
|
L-Shaped Sofa Factory Store
|
Various Catering Industries - In Brazil
|
Vegetable Cards In Portuguese
|
Assembly Diagram of an Asphalt Plant
|
Egg Tray Factory
|
Dismantle the Feragem Project
|
Aluminum Lunch Box Factory
|
Setting up a veterinary laboratory
|
Cheese Making Materials
|
How Much Does a Water Cup Filler Cost
|
Project Work for a Parking Lot
|
Pop Model Cleaning Industry
|
Ready-to-Eat Restaurant Standard Operating Procedure
|
Beauty Salon Flowchart and Organization Chart
|
Organic Garden in Greenhouses
|
Ready Trackers Business Plan
|
A Business Plan for HR Consulting
|
How to Set Up an Aircraft Workshop
|
How to Set Up a Home Filming Studio
|
Economic and Financial Feasibility Study of a Factory
|
Pasta Making Ingredients
|
Production About The Dog
|
Setting Up a Roasting Business
|
Cnae Pulp
|
Ketchup Manufacturing Plant
|
Pet Shop Floor Plan Project
|
Other projects ready:
How to start Pre-School with capacity for 1.000 children per day.
Project Factory to Produce Cream Cracker with an area of 300 m² and capacity for 2.000 kg/day.
PDF Peanut Candy Factory (Pé-de-Moleque, Paçoca,CrocCandy, Gibi), with capacity for 3.000 Kg/day.
Plant and layout Factory to Produce Raw Palm Oil with capacity for 2.000 liters per day.
Project Locksmith Shop with an area of 100 m2.
Project Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Deboned Meat Reception) with capacity for 3.000 Kg/day.
FeasibilityClothing Industry to Produce Dyeing Fabric (Hippie Clothes) with capacity for 500 garments/day.
Business plant Cold Storage Room to Process ALIVE and Stunned Shrimps and Fresh, Frozen, Salted, Dried, Smoked and Breaded Fishes and Fish Hamburguers with capacity to Produce 10.000 Kg/day.
Project Factory Fruit Improvement with capacity for 3.000 Kg per day.
How to start Factory to Produce Lollipops, Caramels, Hard Candies, Creams and Fondant, Ice Cream Syrup, Gums and Jell-O, Chewable Candies and Candy Bars with capacity for 5.000 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US