Ready project Living Center for Elderlies with capacity for 500 beds.

CODE - ESC-019

Ready project Living Center for Elderlies with capacity for 500 beds.

CODE - ESC-019


Project ready with:

Project with the following sections:
Reception
Rooms
Pharmacy
Admission Office
Social Worker
Canteen
Storeroom
Kitchen
Pantry
Women's Bathrooms
Men's Bathrooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Living Center for Elderlies

How to start Living Center for Elderlies with capacity for 500 beds. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Living Center for Elderlies

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Floor Plan Senior Citizens Community Center | Community Center Flowchart | Community Center Plans | Coexistence Ability | Community Center Floor Plan | Senior Citizen Business Plan | Senior Citizens Community Center - Ground Floor | Community Center Floor Plan | Pop Center Floor Plan Template | Floor Plan Elderly | Floor Plan of Community Center | Senior Citizens Community Center Floor Plan Model | Floor Plan of Senior Living Center | Senior Living Center Flowchart Template | Senior Citizens Community Center Project Template | Project on How to Set Up a Senior Citizens Community Center | Escargot, breeding | Perfume Cellar Business Plan | Electrical Material Store Layout | Assemble an Oil Change | Ready Agricultural Projects | Retail Layout | How to Set Up a Lampshade Factory | Open a Jewelry Store Project | Machines to Produce Banana Candy | Organizational Chart of a Distributor | School Floor Plan Template | Equipment for Sausage Company | How to Build a Hospital Structure | Ready Business X-Ray Clinic | Alternative Treatment In Hospital | Open a Motel | Price to Set Up a Swimming Academy | How to Set Up a Marmitex Supply | Gas Station Project | Cafeteria Facade Model | Academic Work Organization Chart Beauty Center | Business Plan for a Disposable Diaper Factory | How to Make an Insecticide | Clothing Room Layout Model | Professional Uniform Loans | Construction Formwork Clamp | .machine for assembling wooden fasteners | Skate Factory Project | Open a Concrete Post Factory | How to Make a Coffee Filter | How to Assemble a Galvanization | Domestic Ladder Factory | DWG Clinical Analysis Laboratory Plant | Mozzarella Cheese Making Equipment | How to Set Up a PPE Store | Mechanical Workshop Layout | Pops 2c Standard Operating Protocols in Healthcare | Beauty Center Organizational Chart Template | How Much Does It Cost To Open An Optician's Shop | Condominium Administration Poços De Caldas | Office Equipment | Computer Maintenance Planning | How to Assemble the Sdwerviço Sdwe Giuinxcho | Soft Drink Production Chart | Concrete Manufacturing Flowchart Model | I Want to Set Up a Snack and Sweet Factory | Banana Jam Factory Equipment | Set Up Juice Factory | Ready-made Kennel Models |

 

Other projects ready:

How to start Slaughterhouse Bovines with capacity to Slaughter 300 animals/day.
Project Factory for Fried Potato Processing, made from potato paste, with capacity of 5.000 kg/day and 2500m² (2990 sq.yd.) area (automatized) - Chips type.
PDF Slaughterhouse Swines, Caprines, Ovines with capacity for 700 animals per day.
Plant and layout Cabinetmaking with capacity for 20 tons/day.
Project Factory to Produce Fruit Juice with capacity for 5.000 liters/day.
Project Factory to Produce Injectable Medicine with capacity for 10.000 ampoules per day.
FeasibilityMarble and Granite Factories to Produce Cutted and Polished Stones with capacity for 2 Blocks per Week.
Business plant Slaughterhouse Cold Meat and Crackling (Torresmo) Production, with an area of 150 m2, with capacity to produce 2.000 Kg/day.
Project Factory to Produce Broom Handle with capacity for 1.000 units per day.
How to start Tannery for Wet Blue until Finishing Plant, with capacity for 500 leathers/day.

Project - how to start Living Center for Elderlies with capacity for 500 beds.