Ready project Microbrewery, with capacity for 300 liters/day.

CODE - AGR-073

Ready project Microbrewery, with capacity for 300 liters/day.

CODE - AGR-073


Project ready with:

Industry with the following sections:

Raw Material Reception
Processing - phase 1 (selection, cleaning, Drying)
Processing - phase 2 (maturation, wort)
Processing - phase 3 (filter, maturation)
Bottling
BStorage for Finished Products
Storage for Ingredients
Storage for Raw Material
Storage for Packaging
Employees Hygiene
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Microbrewery

How to start Microbrewery, with capacity for 300 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Microbrewery

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Economic Feasibility Study for Microbrewery | Microbrewery Layout | Layouts for Microbreweries | Building Microbrewery | Brewery Equipment Layout | Beer cooler 300 Lts | Economic Viability of a Brewery | Micro Brewery Layout | Economic Project for Microbrewery | How to set up a beer cooler | Microbrewery Structure and Layout | How to Set Up a Small Brewery | Viability of a Microbrewery | Economic Viability of Microbrewery | Brewery Floor Plan Layout Example | Microbrewery Economic Viability | I Want to Open a Brewery | Microbrewery Project | Economic Viability of Micro Brewery | Microbrewery Projects Economic Viability | Budget for Setting Up a Microbrewery | Microbrewery Equipment China | Model Project for Setting Up a Brewery | Microbrewery Layout | Mineral Water Economic Viability | Layout Warehouse Templates and Layout | Microbrewery Viability | Economic Feasibility Study of Microbrewery | How I Opened a Microbrewery | How Many Liters of Water to Produce 300 Liters of Beer | Economic Viability Projects in Agriculture | Microbrewery Economic Viability | Investment in a Microbrewery | Financial Viability of a Microbrewery | Layout of a Microbrewery | Feasibility Project for a Microbrewery | Economic Viability of a Micro Brewery | Microbrewery Feasibility Project | Finished Products Warehouse | Microbrewery Equipment China | Microbrewery Feasibility Project | Brewery Layout | Construction Rabbit Breeding | Flavoring Production Capacity | Business Plan for an Electrical Supply Store | Super Oil Change Model | Motorcycle Exhaust Projects DWG | How to Set Up a Fruit and Vegetable Distributor | Toy Store Projects | Example Of A Business Plan For A Jewelry Store | Flowchart for the Production of Diet Sweet Breads | How to Set Up a Food Distribution Center | tire plant | How to Set Up a Cooking Class Project | How to Set Up a Boat Factory | I want to assemble a refrigerator | Design Template To Equipqr A Physiotherapy Room | Metal Vertical Parking | Motel Twelve Suite Floor Plans | How to Set Up a Swimming School | Industrial Kitchen Floor Plan | Fast Food Financial Plan Example | Beauty Clinic Interiors | Disposable Diaper Making Machine | Machinery for Manufacturing Alcohol Gel | Physical Financial Schedule Template for the Clothing Industry | Machines for Making PVC Dolls | How to Design a Layout for Production | Hair Clip 28piranha29 | Clothespin Making | Pool Table Plans | Industrial Production Flowchart of Posts | Iron Foundry Layout | Equipment for Puff Pastries | Business Plan for Setting Up a Clinical Analysis Clinic | How to Set Up a Cheese Factory | Car Wash Facade Model | Financing for Mechanical Workshop | Pop For Drug Traceability | Rodeo Arena Project | How to Start a Dumpster Company | Document Scanning Business Plan Template | How to Set Up an Advertising Project | Cell Phone Repair Tools | Basic Project for Maintenance of Artesean Wells | 20000 Ecological Bricks | Party Snacks How to Set Up a Business | How to Set Up a Sweet Popcorn Factory | Tea Flowchart | Kennel Business |

 

Other projects ready:

How to start Industry to Produce Mass Base for Soap with capacity for 10.000 Kg/day.
Project Cold Storage Room to Produce Salted and Smoked Fishes and Fish Products with capacity for 10.000 Kg/day.
PDF Milk and Dairy Industry to be built in 2 phases: 1st phase: Fresh Cheese production (Ricota, Muzzarela, Minas Frescal), Matured Cheese (Prato, Minas Standard, Cobocó) and Parmesan, with 178 m2 (212,98 sq.yd.) area and capacity for 4000 liters/day. 2nd phase: Amplification to Produce Yoghurt and Milky Beverages, with 216 m2 (258,33 sq.yd.) of total area and capacity for 6000 liters/day.
Plant and layout Restaurant 1.000 meals per day.
Project Factory to Produce Ketchup with capacity for 50.000 Kg per day.
Project Baiana Kitchen with capacity for 100 meals per day.
FeasibilityPoultry House with capacity for 5.000 Reproduction Chickens ( in Individual Chicken Coops).
Business plant Factory for automatic processing of Peas with 500m² (598 sq.yd.) and capacity of 7.500 kg/day.
Project Factory to Produce Macaroni Rice with capacity for 13.000 Kg/day.
How to start Day Care with capacity for 100 children.

Project - how to start Microbrewery, with capacity for 300 liters/day.