Ready project Microbrewery, with capacity for 300 liters/day.

CODE - AGR-073

Ready project Microbrewery, with capacity for 300 liters/day.

CODE - AGR-073


Project ready with:

Industry with the following sections:

Raw Material Reception
Processing - phase 1 (selection, cleaning, Drying)
Processing - phase 2 (maturation, wort)
Processing - phase 3 (filter, maturation)
Bottling
BStorage for Finished Products
Storage for Ingredients
Storage for Raw Material
Storage for Packaging
Employees Hygiene
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Microbrewery

How to start Microbrewery, with capacity for 300 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Microbrewery

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Microbrewery Equipment China | Economic Feasibility Study of Microbrewery | Economic Viability of a Brewery | Brewery Equipment Layout | Layouts for Microbreweries | Microbrewery Structure and Layout | Microbrewery Layout | Micro Brewery Layout | Mineral Water Economic Viability | Brewery Floor Plan Layout Example | How to set up a beer cooler | Model Project for Setting Up a Brewery | Brewery Layout | Budget for Setting Up a Microbrewery | Economic Viability of a Micro Brewery | Microbrewery Viability | Economic Viability of Microbrewery | How to Set Up a Small Brewery | Layout Warehouse Templates and Layout | Economic Viability of Micro Brewery | Microbrewery Projects Economic Viability | Microbrewery Economic Viability | Microbrewery Economic Viability | Beer cooler 300 Lts | Microbrewery Equipment China | How I Opened a Microbrewery | I Want to Open a Brewery | Economic Feasibility Study for Microbrewery | Building Microbrewery | Layout of a Microbrewery | Microbrewery Feasibility Project | Investment in a Microbrewery | Economic Viability Projects in Agriculture | Finished Products Warehouse | Economic Project for Microbrewery | Viability of a Microbrewery | Microbrewery Layout | Microbrewery Feasibility Project | Feasibility Project for a Microbrewery | Financial Viability of a Microbrewery | How Many Liters of Water to Produce 300 Liters of Beer | Microbrewery Project | Construction Rabbit Breeding | Flavoring Production Capacity | Business Plan for an Electrical Supply Store | Super Oil Change Model | Motorcycle Exhaust Projects DWG | How to Set Up a Fruit and Vegetable Distributor | Toy Store Projects | Example Of A Business Plan For A Jewelry Store | Flowchart for the Production of Diet Sweet Breads | How to Set Up a Food Distribution Center | tire plant | How to Set Up a Cooking Class Project | How to Set Up a Boat Factory | I want to assemble a refrigerator | Design Template To Equipqr A Physiotherapy Room | Metal Vertical Parking | Motel Twelve Suite Floor Plans | How to Set Up a Swimming School | Industrial Kitchen Floor Plan | Fast Food Financial Plan Example | Beauty Clinic Interiors | Disposable Diaper Making Machine | Machinery for Manufacturing Alcohol Gel | Physical Financial Schedule Template for the Clothing Industry | Machines for Making PVC Dolls | How to Design a Layout for Production | Hair Clip 28piranha29 | Clothespin Making | Pool Table Plans | Industrial Production Flowchart of Posts | Iron Foundry Layout | Equipment for Puff Pastries | Business Plan for Setting Up a Clinical Analysis Clinic | How to Set Up a Cheese Factory | Car Wash Facade Model | Financing for Mechanical Workshop | Pop For Drug Traceability | Rodeo Arena Project | How to Start a Dumpster Company | Document Scanning Business Plan Template | How to Set Up an Advertising Project | Cell Phone Repair Tools | Basic Project for Maintenance of Artesean Wells | 20000 Ecological Bricks | Party Snacks How to Set Up a Business | How to Set Up a Sweet Popcorn Factory | Tea Flowchart | Kennel Business |

 

Other projects ready:

How to start Sterilization Unit (by Low Temperature Steam and Formaldehyde) with capacity for 20.000 Units per day.
Project Slaughterhouse Bovines, Swines and Equines with capacity for 500 animals per day.
PDF Factory to Produce Dehydrated Pepper with capacity for 100 Kg/day.
Plant and layout Factory for Fresh Cheese production (Muzzarela, Ricota, Minas Fresca ) and Matured Cheese (Prato, Minas Standard, Cobocó), with capacity of 6000 liters per day.
Project Factory to Produce Energy Drinks with capacity for 100 liters/day.
Project Clothing Industry to Produce Denim Blouse with capacity for 500 garments/day.
FeasibilityFactory for Betterment and Drying of coffee with 1.200m² (1435,2 sq.yd.) area and capacity of 40.000 kg/day.
Business plant Clothing Industry to Produce Knitting (Rectilinear Knitting Machines) with capacity for 500 garments/day.
Project Cowshed for Milk Cattles with capacity for 30 Cows, with Automatic Milking and Built area of 220 m², for Type B Milk.
How to start Factory to Produce Banana Ripe Nectar with capacity for 500 Kg/day.

Project - how to start Microbrewery, with capacity for 300 liters/day.