Ready project Rendering with capacity for 300 tons/day.

CODE - FRIG-208

Ready project Rendering with capacity for 300 tons/day.

CODE - FRIG-208


Project ready with:


Industry with the following sections:

Reception Room for Bones
Digesters
Tallow Production
Boiler
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Rendering

How to start Rendering with capacity for 300 tons/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Rendering

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Rendering Scheme | Soap Making Flowchart Using Avocado | Floor Plan Of A Music Store | How to Set Up an Oil Change | Buy Products to Set Up a Tobacco Shop | Pie Models | Utility Store Projects | Clothing Rental Store Floor Plan | Gelatin Flowchart | Beverage Storage Project Templates | Tire In Asphalt Production | Requirements for Opening a Nursing School | Model of a Meat Shop | Cold Storage Room Layout | Equipment for a Company Outpatient Clinic | How to Open a Radiology Clinic | Budget for Setting Up a Dental Office | Convention Room Design Template | Dwg Plans Of Cinemas | Camping Ideas | Fuel Pump.dwg | Beer House Project | Aesthetic Clinic Assembly2cReady Model | Gas Supplier | How to Assemble a Paper Roll | Investment to Open a Clothing Industry | Set Up Underwear Factory | Slipper Production Company | Project Case | Start Popsicle Factory | Model Airplane Plans | Machine for Manufacturing Precast Slabs | Wall Clocks to Mount | Ecological Brick Model Factory | Electroplating Flowchart | Laboratory Financing | Step by Step Butter Production | Industrial Laundry Plant | Motorcycle Workshop Project | Construction Accommodation Model | Pop Cleaning and Hygiene of Facilities | Vaquejada Track Plan | Sewing Office Plan | Model About Reforestation | How to Set Up a Construction Budget Office | Bicycle Workshop Template | Setting Up a Pool Maintenance Company | Manufacturers of Ornamental P2ffish Flake Feed | Set up a tile factory | Bread and Cake Industry Financial Plan Template | Torrefacao Cafe Floor Plan | Construction of a Condiment Factory | Pre-cooked cassava |

 

Other projects ready:

How to start Clothing Industry to Produce Women's Clothing (Party Clothes) with capacity for 500 garments/day.
Project Factory to Produce Brooms with capacity for 15.000 units per day.
PDF Factory to Produce Baby Food with capacity for 2.000 kg per day
Plant and layout Factory to Produce Dough of Frozen Cheese Bread with capacity for 5.000 Kg/day.
Project Slaughterhouse Buffaloes with capacity for 50 animals per day.
Project Factory to Produce Toasted Cashew Nut with capacity for 3.000 Kg per day.
FeasibilityTannery Caprine Skin with capacity to Produce 100 skins/day.
Business plant Complete Caprine Breeding, Including: Caprine Area for 90 Caprines (Breeding and Milking), Milk and Dairy Industry to Produce Cheese, Slaughterhouse for 15 animals per day and Tannery for Goatskin.
Project Factory to Produce Soy Milk with capacity for 5.000 liters per day.
How to start Animals Hotel with capacity for 30 animals.

Project - how to start Rendering with capacity for 300 tons/day.