Ready project Rendering with capacity for 5 tons/day.

CODE - FRIG-215

Ready project Rendering with capacity for 5 tons/day.

CODE - FRIG-215


Project ready with:


Industry with the following sections:

Reception Room for Bones
Digesters
Tallow Production
Boiler
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Rendering

How to start Rendering with capacity for 5 tons/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Rendering

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Boiler Grease Factory Manual | Budget for rendering | Structure of a rendering plant | Assembly of the grease shop | What is the Cost of Building a Broiler Shed? | Ornogram of a Cosmetics Factory | Bndes Financing for Slaughterhouse | How to Start a Photo Printing Business | Set Up a Tire Sales Branch | I Want to Open a Rotisserie | How to Build a Plaster Model | Names for Thrift Store | Distributor Plant | Basic Food Basket Company Is A Good Investment | Driving School Office Floor Plan | Dwg Project Butcher Shop Model | Fishmeal Digester | Multisport Projects In DWG | Medical Office Floor Plan | Psf Ready Project | Physical Plan of an Emergency Room | Plans for a party room with capacity for 400 people | Project With Guest House Model | Industrial Kitchen Plant | How to Set Up My Nightclub | Para Lava Jato Layout | Business Plan for Children's Buffet | Plaster Bandage Factory | Egg Carton Mattress Making Machine | Organizational Chart of a Clothing Company | Uniform Production Layout Templates | Manufacturing Non-Woven Bags | Styrofoam Pan Industry | Wallet Production | Set up a wooden frame factory | How to Assemble Wire Fences | Open Cardboard Packaging Factory | Step by Step Guide to Installing an Aluminum Window | Sells Zinc Plating Company | What Do I Need to Set Up a Dental Prosthesis Laboratory? | Ice Cream Yogurt Factory | Good Practices Manual for Detection | List of Materials for Opening a Company | Dairy Recall | How to Set Up a Beauty Salon Pdf | How to Set Up an Employment Agency for Domestic Workers | How to Open a Freight Company | Commercial Financing Representation | Cleaning Service Business Plan Templates | How to Set Up a Recording Room | Plants for Pig Facilities | View Cake Making Equipment | Cream Cracker Manufacturing | Eucalyptus Financing Consultant | Açai Pulp Production | Sauce Making Equipment List | Pet Shop Project |

 

Other projects ready:

How to start Clothing Industry to Produce Knitwear with Dyeing Sector with capacity for 50 garments/day.
Project Drinks and Soft Drinks Deliverer with volume of 1.000 liters/day.
PDF Factory to Produce Creams and Fondant with capacity for 3.000 Kg/day.
Plant and layout Slaughterhouse for Bovines and Swines and Cold Meat Production (salsage, hams, Cold Meat and cured food) and Charque Processing - 20 animals/day - area of 500 m² (598 sq.yd).
Project Factory to Produce Natural Cosmetics with capacity for 5.000 Kg/day.
Project Clothing Industry to Produce Knitting (Rectilinear Knitting Machines) with capacity for 200 garments/day.
FeasibilityFactory to Produce Raisins Cashew Nuts, Cashew Syrup, Crystallized Cashew, Cashew Jelly and Toasted Cashew Nut with capacity for 3.000 Kg per day.
Business plant Factory to Process Canned Mushroom with capacity for 1.000 Kg per day.
Project Factory for Manioc Fecula with capacity of 50.000 kg of Raw Material/day.
How to start Flower Shop with an area of 1.000 m2.

Project - how to start Rendering with capacity for 5 tons/day.