Ready project Rendering with capacity for 80 tons/day.
CODE - FRIG-204
Ready project Rendering with capacity for 80 tons/day.
CODE - FRIG-204Project ready with:
Industry with the following sections:
Reception Room for Bones
Digesters
Tallow Production
Boiler
Office
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Rendering
OPTIONAL SERVICES:
- Financial Feasibility Study of Rendering with capacity for 80 tons/day.
- Business plan for Rendering with capacity for 80 tons/day.
- 3D project of Rendering with capacity for 80 tons/day.
Projects with other capacities
Rendering
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Construction of rendering plant | Rendering Process | Grease Assembly | Construction Rendering | Investment in rendering | Rendering Process | Starting a Sporting Goods Business | Vehicle Rental Viability | Car Dealership Project | How to Open a Pastry Shop | Project Description Shoe Store Company | Chicken Foot Leather | A Complete Work of a Compounding Pharmacy | How to Set Up a Music School | Turkey Slaughter | DWG Stadium Stands | Project in Surgical Center | How to Open a Physiotherapy Business | Plant for Construction of Low-Road Vehicles | Simple Hotel Apartment Floor Plans | Supermarket Plants With An Area Of 1000 M | Squash Court Models | Bowling Lane Manufacturing Mg | I Want to Set Up a Car Wash | Rules for Marmitex | Machinery for Pen Production | Buy Vegetable Loofah Production | Sweatshirt Factories | Garment Factory Project Template | Raincoat Making Machines | Plastic Wood Blumenau | How to Set Up an MDF Box Factory | Study on Cement Production | Concrete Plant for Construction Site | Cardboard Box Production Layout | Aluminum Cookware Processing Flow | Budget for Construction Materials on Balcony | Prosthetic Laboratory Design Floor Plan Template | Tips for Setting Up a Dairy | Food Engineering I Want An Ice Factory Project | Battery Production Flowchart | 25 Standard Operating Procedure Templates for Cosmetics Distributors25 | Pop Material Collection | Software Plan for Programmers | Designing Forest Seedling Nursery | Container Rental How to Set Up a Business | Quick Graphics Plant | Speedometer Maintenance Course | Online Floor Plan of Ice Cream Shops | Flowchart of the Production Process of a Pizzeria | Machine for Grape Juice Production | Projects for the Brazil Nut Processing Industry | How to Plan Soybean Production | Cemetery Design Template |
Other projects ready:
How to start Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion with capacity for 20.000 Kg/day.
Project Factory to Produce Filling and Mass for Savory Pastries (Salgadinhos) (Coxinha, Pasty, Esfiha, Kibe, Hamburger) with capacity for 1.000 Kg/day.
PDF Industrial Kitchen without Restaurant with capacity for 1.000 meals per day.
Plant and layout Factory to Produce Tomato Extract and Tomato Pulp with capacity for 1.000 Kg per day.
Project Slaughterhouse Bovines, Ovines and Caprines, with capacity for 100 animals per day.
Project Slaughterhouse Newborn Male Calves with capacity to Slaughter 20 animals/day.
FeasibilityFactory to Produce Corn Flour with capacity for 42.000 Kg per day (Vertical Mill)
Business plant Factory to Produce Wood Briquette with capacity for 3.000 Kg/day.
Project Cabinetmaking with capacity for 15 tons/day.
How to start Factory of Biscoito de Polvilho (SnackSnow Puffs), with capacity for 3.000 kg/day.



