Ready project Salon for Feet Treatment with capacity for 10 people.

CODE - PRS-053

Ready project Salon for Feet Treatment with capacity for 10 people.

CODE - PRS-053


Project ready with:

Industry with the following sections:
Reception of Patients
Waiting Room
Area to Register Patients
Doctor's Offices
Therapy Boxes
Pantry
Storage for Cleaning Material
Linen Room
Administration
Storage for Equipments
Services Area
Other Rooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Salon for Feet Treatment

How to start Salon for Feet Treatment with capacity for 10 people. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Salon for Feet Treatment

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Shampoo Production Flowchart | Organizational Chart of a Sports Equipment Store | Setting Up a Car Rental Company | Low Concessionary Plant | Food Business Project Model | Shoe Store Project | Rabbit Skin Tannery in Brazil | Project on How to Set Up a Compounding Pharmacy | Ready-made Project Templates for Music Schools | Boar Slaughtering Plant | Sebrae Meat Boutique | Ready Projects Football Field | Resc38dduos Surgical Center Project | Physiotherapy Clinic Models | Physical Plan of the Uti Drawing | How to Build a Steakhouse | Supermarkets Plant | I Want to Set Up a Tennis Academy | Cost to Set Up a Bowling Alley | Business Plan With Feasibility Study - Lava Jato | How to assemble a lunch box | Factory That Gives You A Pen To Assemble At Home | Vegetable Sponge Distributors | Knitting Industry Floor Plan | Example of a Clothing Company Project | How to Make Raincoats | Investment in Plastic Wood Manufacturing | Academic Article MDF Manufacturing | Concrete Block Factory Names | Cost of Setting Up a Cardboard Factory | Aluminum Cookware Manufacturers In Brazil | How to Make a Pool Cover | How to Open a Dental Prosthesis Business | UHT Milk Tank | How to Start an Ice Company | Vehicle Battery Factory | BNDES Projects Models | Ready Operational Business Plan | Ready-Made Real Estate Projects | Business Plan2f Nursery | How to Open a PVC Ceiling Installation Company | Open a Quick Print Shop | How to Open a Tachograph Maintenance Company | Effluent Treatment Model | Ice Cream Industry Business Plan | Lasagna Flowchart | Grape Juice Factory Equipment | Brazil Nut Processing Machine | Tofu Production | How to Build a Cemetery |

 

Other projects ready:

How to start Factory to Produce Powder Soup with capacity for 300 Kg/day.
Project Factory to Produce Confecção with capacity for Production de 200 Kg/day.
PDF Cold Storage Room to Produce Smoked Fish and Fish Products with capacity to Produce 40.000 Kg/day.
Plant and layout Slaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 75 animals/day.
Project Factory to Produce Banana Purée with capacity for 3.000 Kg per day.
Project Factory to Produce Fruit Juice with capacity for 3.000 liters/day.
FeasibilitySlaughterhouse to Sluaghter Bovine with capacity for 200 animals/day and Built area of 900 m² (1076,4 sq.yd), being able to reach the double of the regular capacity. Reception area for bones and blood. Area for Leather salting.
Business plant Factory to Produce Lipstick with capacity for 10.000 kg/day.
Project Cold Storage Room to Process Stunned Shrimps (from Marine Fisheries) with capacity to Produce 1.000 Kg/day.
How to start Slaughterhouse for Bovines and Swines and Cold Meat Production (salsage, hams, Cold Meat and cured food) and Charque Processing - 125 animals/day - area of 1.500 m² (1.794 sq.yd).

Project - how to start Salon for Feet Treatment with capacity for 10 people.