Ready project Salon for Feet Treatment with capacity for 30 people.
CODE - PRS-054
Ready project Salon for Feet Treatment with capacity for 30 people.
CODE - PRS-054Project ready with:
Industry with the following sections:Reception of Patients
Waiting Room
Area to Register Patients
Doctor's Offices
Therapy Boxes
Pantry
Storage for Cleaning Material
Linen Room
Administration
Storage for Equipments
Services Area
Other Rooms
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Salon for Feet Treatment
OPTIONAL SERVICES:
- Financial Feasibility Study of Salon for Feet Treatment with capacity for 30 people.
- Business plan for Salon for Feet Treatment with capacity for 30 people.
- 3D project of Salon for Feet Treatment with capacity for 30 people.
Projects with other capacities
Salon for Feet Treatment
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Layout Area 500 M2 | Sports Stores Floor Plan Project | How to Set Up a Virtual Car Rental Agency | Car Dealership Floor Plan | Ideas for a Natural Food Store | Clothing and Shoe Store Layout | How to Set Up a Fish Tannery | Pop Pharmacy Compounding For Opening | Organizational Chart of a School | Rabbit Slaughterhouse Layout | How to Make Jerked Beef | Soccer Field Layout | Budget for Setting Up a Veterinary Surgical Room | Equipment Needed for a Physiotherapy Room | C3b4nica Plan Of A Utility | Steakhouse Model Plants | Supermarket Floor Plan | Setting Up a Tennis Court | How to Set Up a Bowling Alley - Ready Project | Car Wash Flowchart Template | Budget Template for Marmitex | What Raw Material Is A Toothbrush Made Of? | Equipment for the production of vegetable loofah | Ready Lingerie Financial Plan | Design and Development of a Bag Factory | PVC Laminates Price M2 | Furniture Factory Flowchart Template | Project for Production of Concrete Blocks | How Much Does It Cost To Open A Concrete Plant | How to Set Up a Cardboard Box Manufacturing Company | Ready-Made Pots For Sale Projects | How to Start a Screen Manufacturing Company | Dental Prosthesis | Cost of Setting Up a Milk Factory | Ice Factory Business Plan | Build Wooden Drums | Procedures for Setting Up a Company in the Refrigeration Industry | Ready-made Pop Templates | Example of a Ready-Made Business Plan on How to Set Up a Real Estate Agency | Budget for opening a plant nursery | Ready Resume Format | Equipment for setting up a quick print shop | Antique Watch Repair in Poa | Machine Maintenance Schedule Template | Setting up a Cold Room | Fresh Pasta Business Plan | Flowchart Works on Grape Juice Manufacturing | Papaya Packaging | How to Set Up a Brazil Nut Factory | Tofu Maker | How to Start a Cemetery |
Other projects ready:
How to start Industry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 10 and 20 liters and plastic cups.
Project Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 3.000 Units per day.
PDF Industry to Produce Toothpaste with capacity for 100 Kg/day.
Plant and layout Factory to Produce Chocolate with capacity for 1.000 Kg/day.
Project Marble and Granite Factories to Produce Cutted and Polished Stones and Marble and Granite Pieces (Sink, Counter and by Placing an Order) with capacity for 1 Block per Week.
Project Factory to Produce Essential Oils (Mint Leaf, Eucalyptus Leaf, etc.) with capacity for 100 liters/day.
FeasibilityFactory to Produce Costume Jewelry with capacity for 30.000 jewelries per day.
Business plant Telemarketing with capacity for 500 operators.
Project Slaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 20 animals/day.
How to start Marble and Granite Factories to Produce Cutted Stones with capacity for 3 Blocks per Week.



