Ready project Slaughterhouse Alligator with capacity for 10 animals per day.

CODE - FRE-018

Ready project Slaughterhouse Alligator with capacity for 10 animals per day.

CODE - FRE-018


Project ready with:

Industry with the following sections:
Alligator Stunning
Evisceration
Inspection
Pre-Chamber
Cold Chamber for Carcass
Control and Expedition
Expedition Platform
Rendering Reception Sector
Small Guts Reception Sector
Reception and Treatment Sector for Guts (1st and 2nd phases)

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Alligator

How to start Slaughterhouse Alligator with capacity for 10 animals per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Alligator

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Raise Alligators for Slaughter | Alligator Stunning | Milking Corral Models | Documentation for Registering a Micro Soap Industry | Loyalty of a Mini Market | Concrete Mixer Projects | Steel Sales Flowchart | Name for Cold Cuts Distributor | Academic Project to Set Up a Store | Screen Printing Material In Mg | Legislation for the Assembly of Compounding Pharmacy | Olives 200 Kilos Sales | What to Do to Open a Nursery School in Mg | Videos on How to Slaughter Sheep | Meat Flowchart | Multi-sport courts DWG | Requirements for Setting Up a Polyclinic | How to Mount a Pop for Ubs | Physical Uti Plant Models | How to Set Up a Steakhouse | Electrical Project Supermarket Dwg | Personal Trainer Consulting | Model Event Project In Nightclub | Project for Sebrae Car Wash | How to Set Up a Small Dance Club | Legislation for the Toothbrush Industry | Paint Store Business Plan | How to Set Up a Jeans Business | How to Open Stock Trading | Glass Flowchart | Dog Waterer Stand Mold | School Locker Room Design Models | Concrete Plant Plants | Business Plan for Cardboard Tube Company | Cost of a Cookware Sales Project | Motorcycle Exhaust Designs | Layout Plan Of A Laboratory | Industrial Milk Production | Mineral Water Bottling Companies | Vehicle Parking Budget | Pop Standard Operating Procedure for Cold Storage | Legislation Standard Operating Procedure Laboratory | Waxing Salon Plant | Building a Seedling Nursery Step by Step | Set Up Vehicle Tracking Service | Surveying Company Business Plan | Refrigeration Workshop B | How to Set Up a Recording Label at Home | Cold Rooms for Fruit Pulp | Soverteria Financial Plan | Machines for the production of preserved vegetables | How to Set Up a Small Hospital | Tomato Pulp Flowchart | Dog Steak Maker |

 

Other projects ready:

How to start Factory to Produce Fruit Juice, Frozen and Concentrated Fruit Pulp, Paste and Syrup Fruit Sweets, Fruit Jelly and Ice Ice Cream made from Fruit Pulp with capacity for 10.000 Kg/day.
Project Family Health Program with an area of 500 m2.
PDF Milk and Dairy Industry for Sweet Milk (Fudge) production with an area of 115 m² (137,54 sq.yd.) and capacity for 3.000 liters/day.
Plant and layout Slaughterhouse Industrialization and Slaughtering of Bovines and Swines with capacity for 20 Bovines and 30 Swines per day with a Built area of 468 m².
Project Factory to Produce Mead, Vinegar made from Honey, Cachaça of Honey and White Wine (Prosecco) of Honey with capacity for 100 liters/day.
Project Factory to Produce Ice Lolly Stick with capacity for 300 Kg/day.
FeasibilityFactory to Produce Banana Powder (Banana Flour), Banana Raisin, Banana Raisin with Chocolate Covering, Banana Sweet, Banana Purée with capacity for 120.000 Kg/day.
Business plant Comercial Laundry with capacity for 2.000 kg of Clothes per day.
Project Projetos de Fábrica para Produção de Broom Handle, Broom and Water Rakes (Complete) with capacity for 13.000 units per day.
How to start Chinese Kitchen with capacity for 300 meals per day.

Project - how to start Slaughterhouse Alligator with capacity for 10 animals per day.