Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Slaughterhouse Bovines with capacity to Slaughter 500 animals/day.
CODE - FRB-021
Ready project Slaughterhouse Bovines with capacity to Slaughter 500 animals/day.
CODE - FRB-021
Project ready with:
Industry with the following sections:
First Floor:
Stunning area for Bovines
Stunning area for Swines - Available Expansion Area
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small Guts Section
Cold Chamber for Small Guts
Small Guts Packaging
Expedition of Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather Reception Section
Horn and Mocotó Reception Section
Rendering:
Bone Section
Dry Blood Section
Leather
Salt Storage
Leather
Garage
Office
Canteen
Inspection Room
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Slaughterhouse Bovines
OPTIONAL SERVICES:
Financial Feasibility Study of Slaughterhouse Bovines with capacity to Slaughter 500 animals/day.
Business plan for Slaughterhouse Bovines with capacity to Slaughter 500 animals/day.
3D project of Slaughterhouse Bovines with capacity to Slaughter 500 animals/day.
Projects with other capacities
Slaughterhouse Bovines
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
What Is Comment On The Beef Slaughter Flowchart
|
Cattle Slaughter Flowchart Model
|
Tip for Riding a Bull
|
Tips for Bull Riding
|
How to Set Up a Bar Soap Industry
|
Electrical Equipment Store Flowchart
|
Oil Change Project
|
Names of Agricultural Product Stores
|
How to Set Up a Retail Store
|
How to Set Up a Gas Reseller
|
Lingerie Store Integrative Project Templates
|
Gum Factory
|
Dairy Equipment Layout
|
Feasibility Study of a Daycare Center
|
How to Assemble a Mini Water Treatment Plant
|
Jerked Beef Processing
|
Sif Fish
|
Radiology Ready-Made Works
|
Where to Perform Audiometry in Poços De Caldas
|
Motel Under Construction
|
Project to Set Up a Lan House BNDES Loan
|
Equipment for setting up a lunchbox kitchen.
|
Construction of a Gas Station with Budget
|
Cafeteria Layout
|
Plant Model For Injectable Medications
|
Synthetic Marble Manufacturing Volta Redonda
|
Layout of a Jeans Manufacturing Production
|
Physical Layout of a Clothing Factory
|
Soda Straw Manufacturing
|
Set Up a Professional Sandblasting Company
|
Ready-made work on the layout of a clothing company
|
WHAT IT TAKES TO SET UP A SURFBOARD FACTORY
|
Plant Manufacturing Posts
|
Raw Material for Producing Wet Wipes
|
Assembly Process Electroplating
|
Equipment2c Capacity Prices And Manufacturers Of Gas Cylinder Manufacturing
|
What is the price of a clinical analysis laboratory?
|
Machines Used In Cheese Production
|
Business Plan For An Epic2b4s Company
|
How to Open an Auto Paint Shop
|
Ipiranga Chicken Egg Industry
|
Example of a Pop Model
|
Aesthetic Floor Plan
|
Cost of 100m2 Warehouse
|
Condominium Organization Chart
|
Set Up Engineering Office Price
|
Computer Maintenance Budget Template
|
How to Set Up a Cleaning Business
|
Beverage Storage Layout
|
Industrial Bakery Flowchart
|
Gnocchi Making Machine Project
|
Machines for setting up a fruit pulp industry
|
Distributor of Grains and Flours
|
Step by Step Orange Juice Pasteurization
|
Small Business Kennel
|
Other projects ready:
How to start Factory to Produce Garapa (Sugar Cane Juice), with capacity for 750 liters/day.
Project Clothing Industry to Produce Cloth Dolls with capacity for 1.000 units/day.
PDF Clothing Industry to Produce Dyeing Fabric (Hippie Clothes) with capacity for 50 garments/day.
Plant and layout Industry of Mineral Water Bottling with capacity for 40.000 liters/hour, in flagons of 20 litrers and 10 liters, botlles of 2 liters, bottles of 600 ml with and without gas and plastic cup, with an area of 2000 m².
Project Factory to Produce Concrete Blocks and Pierced Bricks (5.000 units per day), Premolded and Premolded Rock Soil (500 m2/day).
Project Factory for Fresh Cheese production (Muzzarela, Ricota, Minas Frescal), with capacity of 6000 liters per day.
FeasibilityFactory to Produce Barbecue Sauce with capacity for 500 liters/day.
Business plant Slaughterhouse Poultry Slaughter, Cold Meat Production, Smoked Products and Breaded Chicken with capacity to slaughter 20.000 birds/day.
Project Clothing Industry to Produce Knitwear with Dyeing Sector with capacity for 100 garments/day.
How to start Drink Deliverer with capacity for 10.000 liters/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US