Ready project Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.

CODE - FRB-022

Ready project Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.

CODE - FRB-022


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Bovines
Stunning area for Swines - Available Expansion Area
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small Guts Section
Cold Chamber for Small Guts
Small Guts Packaging
Expedition of Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather Reception Section
Horn and Mocotó Reception Section
Rendering:
Bone Section
Dry Blood Section
Leather
Salt Storage
Leather
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Bovines

How to start Slaughterhouse Bovines with capacity to Slaughter 600 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Bovines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Cattle Slaughter Consultancy | Price of Materials to Produce Soaps | Bndes Set Up Electrical Material Store | How to Set Up a Vehicle Oil Change | Storage Shed Plans and Projects | Hot Dog Sales Project | How to Open a Frame Factory | Set Up Clothing Repair Shop | Production of Mocoto Jelly | Beverage Company Blueprint | Model For Recycling Factory Use | Requirements for Setting Up a Technical School | Simple Butcher Shop Project | Beef Slaughter Platform | Setting Up an Outpatient Clinic Necessary Materials | Set up Dental Radiology | Dental Clinic Layout | How to Create a Motel Harmonogram | Hotel Industry Hotel Room How to Set Up | Convenience Store Financing | What Equipment and Utensils Do You Need to Set Up a Brewery? | Functional Dermatology Clinic Project | Cotton Spinning Machines | Paper Production Flowchart | Tabatinga Rag Doll Factory | Assemble Non-woven Fabric | Floor Plan Of A Slipper Factory | Plastic Blowing Machine How to Set Up a Business | How to Assemble a Clothespin | Miniature Aircraft Factory | How to Set Up a Precast Company | Speaker Manufacturing | Ecological Brick Factory Project | DWG Signage Plate | Clinical Laboratory Model | Investments in Equipment for Setting Up a Butter Factory | Bndes Hotel Project | Car Workshop Construction Plan | How to Open a Company with 102c0002c00 | Standard Operating Procedure Mill Cleaning | Animal Exhibition Park Design Template | Sewing Workshop Material List | Pest Control Quote Template | Flowchart In Insurance Brokerage | How to Make a Bicycle Workshop Stand | Company Events Organization Chart | Schedule of a Gardening Company | Set up a tile factory | Churros Factories | How to Set Up a Tapioca Biscuit Factory | Packaging for Peeled Garlic | Clinic Floor Plan Examples |

 

Other projects ready:

How to start Tannery Caprine Skin with capacity to Produce 100 skins/day.
Project Clothing Industry to Produce Caps with capacity for 200 garments/day.
PDF Clothing Industry to Produce Stuffed Animal with capacity for 300 garments/day.
Plant and layout Basic Health Unit with an area of 700 m2.
Project Factory to Produce Pupunha Palm with capacity for 3.000 Kg per day.
Project Shed for Bovine Confinement (Milk Cattles) in a Confinement Regime, with capacity for 250 animals and area of 1.000 m² and Mecanic Milking for 12 animals (area with 200 m²).
FeasibilityIndustry to Produce Soap with capacity for 10.000 Kg/day.
Business plant Industry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
Project Factory to Produce Fruit Cordial and Powder Juice with capacity for 100 Kg/day.
How to start Milk and Dairy Industry for Goat Milk Cheese with an area of 130 m² (155,48 sq.yd.) and capacity for 1.500 liters/day.

Project - how to start Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.