Ready project Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.

CODE - FRB-022

Ready project Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.

CODE - FRB-022


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Bovines
Stunning area for Swines - Available Expansion Area
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small Guts Section
Cold Chamber for Small Guts
Small Guts Packaging
Expedition of Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather Reception Section
Horn and Mocotó Reception Section
Rendering:
Bone Section
Dry Blood Section
Leather
Salt Storage
Leather
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Bovines

How to start Slaughterhouse Bovines with capacity to Slaughter 600 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Bovines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Cattle Slaughter Consultancy | Price of Materials to Produce Soaps | Bndes Set Up Electrical Material Store | How to Set Up a Vehicle Oil Change | Storage Shed Plans and Projects | Hot Dog Sales Project | How to Open a Frame Factory | Set Up Clothing Repair Shop | Production of Mocoto Jelly | Beverage Company Blueprint | Model For Recycling Factory Use | Requirements for Setting Up a Technical School | Simple Butcher Shop Project | Beef Slaughter Platform | Setting Up an Outpatient Clinic Necessary Materials | Set up Dental Radiology | Dental Clinic Layout | How to Create a Motel Harmonogram | Hotel Industry Hotel Room How to Set Up | Convenience Store Financing | What Equipment and Utensils Do You Need to Set Up a Brewery? | Functional Dermatology Clinic Project | Cotton Spinning Machines | Paper Production Flowchart | Tabatinga Rag Doll Factory | Assemble Non-woven Fabric | Floor Plan Of A Slipper Factory | Plastic Blowing Machine How to Set Up a Business | How to Assemble a Clothespin | Miniature Aircraft Factory | How to Set Up a Precast Company | Speaker Manufacturing | Ecological Brick Factory Project | DWG Signage Plate | Clinical Laboratory Model | Investments in Equipment for Setting Up a Butter Factory | Bndes Hotel Project | Car Workshop Construction Plan | How to Open a Company with 102c0002c00 | Standard Operating Procedure Mill Cleaning | Animal Exhibition Park Design Template | Sewing Workshop Material List | Pest Control Quote Template | Flowchart In Insurance Brokerage | How to Make a Bicycle Workshop Stand | Company Events Organization Chart | Schedule of a Gardening Company | Set up a tile factory | Churros Factories | How to Set Up a Tapioca Biscuit Factory | Packaging for Peeled Garlic | Clinic Floor Plan Examples |

 

Other projects ready:

How to start Factory to Produce T-Shirts with capacity for 300 units por day.
Project Meat Shop with an area of 1.000 m2.
PDF Clothing Industry to Produce Towel with capacity for 50 units/day.
Plant and layout Factory to Produce Banana Ripe Nectar with capacity for 500 Kg/day.
Project Lan House with capacity for 100 computadores.
Project Clothing Industry to Produce Jeans Pants with capacity for 200 garments/day.
FeasibilityWine Factory with capacity for 400.000 liters/year and area of 1000 m².
Business plant Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Parmesan, Ementhal Cheese, Gruyere Cheese, with capacity of 5000 liters/day.
Project Factory to Produce Jelly Fruit with capacity for 3.000 Kg/day.
How to start Industry Mineral Water Bottling with capacity for 20.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.

Project - how to start Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.