Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.
CODE - FRB-022
Ready project Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.
CODE - FRB-022
Project ready with:
Industry with the following sections:
First Floor:
Stunning area for Bovines
Stunning area for Swines - Available Expansion Area
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small Guts Section
Cold Chamber for Small Guts
Small Guts Packaging
Expedition of Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather Reception Section
Horn and Mocotó Reception Section
Rendering:
Bone Section
Dry Blood Section
Leather
Salt Storage
Leather
Garage
Office
Canteen
Inspection Room
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Slaughterhouse Bovines
OPTIONAL SERVICES:
Financial Feasibility Study of Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.
Business plan for Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.
3D project of Slaughterhouse Bovines with capacity to Slaughter 600 animals/day.
Projects with other capacities
Slaughterhouse Bovines
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Cattle Slaughter Consultancy
|
Price of Materials to Produce Soaps
|
Bndes Set Up Electrical Material Store
|
How to Set Up a Vehicle Oil Change
|
Storage Shed Plans and Projects
|
Hot Dog Sales Project
|
How to Open a Frame Factory
|
Set Up Clothing Repair Shop
|
Production of Mocoto Jelly
|
Beverage Company Blueprint
|
Model For Recycling Factory Use
|
Requirements for Setting Up a Technical School
|
Simple Butcher Shop Project
|
Beef Slaughter Platform
|
Setting Up an Outpatient Clinic Necessary Materials
|
Set up Dental Radiology
|
Dental Clinic Layout
|
How to Create a Motel Harmonogram
|
Hotel Industry Hotel Room How to Set Up
|
Convenience Store Financing
|
What Equipment and Utensils Do You Need to Set Up a Brewery?
|
Functional Dermatology Clinic Project
|
Cotton Spinning Machines
|
Paper Production Flowchart
|
Tabatinga Rag Doll Factory
|
Assemble Non-woven Fabric
|
Floor Plan Of A Slipper Factory
|
Plastic Blowing Machine How to Set Up a Business
|
How to Assemble a Clothespin
|
Miniature Aircraft Factory
|
How to Set Up a Precast Company
|
Speaker Manufacturing
|
Ecological Brick Factory Project
|
DWG Signage Plate
|
Clinical Laboratory Model
|
Investments in Equipment for Setting Up a Butter Factory
|
Bndes Hotel Project
|
Car Workshop Construction Plan
|
How to Open a Company with 102c0002c00
|
Standard Operating Procedure Mill Cleaning
|
Animal Exhibition Park Design Template
|
Sewing Workshop Material List
|
Pest Control Quote Template
|
Flowchart In Insurance Brokerage
|
How to Make a Bicycle Workshop Stand
|
Company Events Organization Chart
|
Schedule of a Gardening Company
|
Set up a tile factory
|
Churros Factories
|
How to Set Up a Tapioca Biscuit Factory
|
Packaging for Peeled Garlic
|
Clinic Floor Plan Examples
|
Other projects ready:
How to start Public Medical Clinic with an area of 3.000 m2.
Project Factory to Produce Chocolate Powder with capacity for 20.000 Kg/day.
PDF Factory to Produce Coconut Water with Ultraviolet Sterilization with capacity for 500 liters/day.
Plant and layout Factory to Produce Pepper Oleoresin with capacity for 5.000 Kg/day.
Project Marble and Granite Factories to Produce Cutted and Polished Stones and Marble and Granite Pieces (Sink, Counter and by Placing an Order) with capacity for 10 Blocks per Week.
Project Milk and Dairy Industry to Produce Autoclaving UHT Milk with capacity for 5.000 liters/day.
FeasibilityFactory to Produce Jerked Beef (Salted Fresh Meat), with Deboned Meat Reception, and capacity for 5.000 Kg/day.
Business plant Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 10 animals/day.
Project Factory to Produce Crackling (Torresmo), Crisps Baked Pork Meat (Pururuca), Skin Ready to Fry and Pig Lard with capacity to produce 5.000 Kg/day.
How to start Industry to Produce Liquid Soap, Liquid Body Soap, Liquid Detergent, Desinfectant, Carpet-Cleaner and Glass-Cleaner with capacity for 1.000 liters/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US