Ready project Slaughterhouse Buffaloes with capacity for 100 animals per day.

CODE - FRE-004

Ready project Slaughterhouse Buffaloes with capacity for 100 animals per day.

CODE - FRE-004


Project ready with:


Industry with the following sections:

1º Floor:
Buffaloes Stunning
Evisceration
Inspection
Pre-Chamber
Freezing Tunnel
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small Guts Sector
Cold Chamber for Small Guts
Small Guts Packing
Guts and Small Guts Expedition
Lower Floor:
Rendering Reception Sector
Leather Reception Sector
Horn Reception Sector

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Buffaloes

How to start Slaughterhouse Buffaloes with capacity for 100 animals per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Buffaloes

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Buffalo slaughter in the slaughterhouse | Stunning of Buffaloes | Buffalo Cold Storage | See Buffalo Slaughter | Buffalo Ready for Slaughter | Cosmetics Industry Organizational Chart Template | Floor Plan Of Boxes For Raising Goats | How to Set Up a Digital Print Shop | How to Set Up a Tire Sales Shop | Floor Plan How to Build a Pesticide Warehouse | Models for a Rotisserie | Set Up a Store to Sell Shower Enclosures | Layout of the drug manufacturing area | How to Open a Basic Food Basket Sales Company | School Facade Model | Step by Step Guide to Opening a Refrigerator | Hamburger Making Machine | I Want to Know About Machines Used in Refrigerators | How to Perform a Medical Room Pop | Psf Health.gov Plant | How to Make a Physical Plan of the Emergency Room | Small Buffet Projects | Example of a Construction Schedule for a Guest House | Industrial Kitchens Model Plan For Construction | Construction Car Wash | Party House Feasibility Study | Pharmaceutical Production Flowchart | Layout for Mattress Factory | Manufacturing Production Layout | How to Start a Uniform Company | Non-woven bags in China | Equipment for Manufacturing Styrofoam Trays | School Wallet 3d Dwg | How to Set Up a Wooden Window Factory | Forms for Making Fences Price | Course on How to Assemble an Aluminum Squadron | Hot Galvanizing Equipment Where to Buy | Dental Prosthesis List | Chocolate Manufacturing Process | Good Practices Manual Template for Cl25c325adnica | How to Set Up a Wheel Alignment and Balancing Workshop | Pop For Dairy | Restaurant Pop Examples | Budget and Equipment for Setting Up a Flower Shop | Setting Up a Service Provision Company | Programs for Designing Companies | Accounting Office Decoration | Fire Extinguisher Recharging Project | How to Open a Sun Farming Business | What is needed to produce an industrial cake | Biscuit Factory Organization Chart | Bean Processing Companies In Mg | Fruit Processing Plant in Outeiro | Brazilian Hot Sauce Factory | Pet Shop Material List |

 

Other projects ready:

How to start Factory to put Cachaça (Liquor) in bottles, with capacity for 2.000 liters/day.
Project Laundry for Hotels with services for 200 rooms per day.
PDF Small Factory to Produce Cashew Nut with capacity for 3.000 Kg/day.
Plant and layout Factory to Produce Soy Milk with capacity for 10.000 liters per day.
Project Clothing Industry to Produce Towel with capacity for 500 units/day.
Project Footwear Industry to Produce Sneakers with capacity for 100 pairs/day.
FeasibilityFactory to Produce Disposable Syringe with capacity for 3.000 Syringes per day.
Business plant Factory to Produce Fruit Sweets and Fruit Pulp with capacity for 100 Kg/day.
Project Factory to Produce Distilled from Honey, with capacity for 300 liters/day.
How to start Milk and Dairy Industry for Fresh Cheeses (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Yogurt, milk Beverages, with capacity of 3000 liters/day.

Project - how to start Slaughterhouse Buffaloes with capacity for 100 animals per day.