Ready project Slaughterhouse Caprines with capacity to Slaughter 10 animals/day.

CODE - FRC-003

Ready project Slaughterhouse Caprines with capacity to Slaughter 10 animals/day.

CODE - FRC-003


Project ready with:

Industry with the following sections:
Stunning area for Caprines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Cold Chamber for Carcass
Control and Expedition
Expedition Platform
Rendering Reception Section
Reception Section for Small Guts
Reception and Treatment of Guts (1st and 2nd phases)
Pens

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Caprines

How to start Slaughterhouse Caprines with capacity to Slaughter 10 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Caprines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Goat Slaughter Flowchart | Financing to Build a Farm Structure | Plan of a facility for raising rabbits | What Are Perfume Cellars? | I want to set up a store for electrical and hydraulic materials | Set Up Vehicle Oil Change | How to Set Up an Agricultural Products Resale Business | Fruit and Vegetable Trading How to Assemble Equipment | Business Plan for a Toy Rental Company | Jewelry Company Layout | Non-Perishable Food Distributor | How Much Does It Cost to Set Up a Tire Recycling Company | Gastronomy Plan | Corporate Reception Projects | Building a Model Pigsty | Floor Plan 250mc2b2 | A Floor Plan Drawing Of A Radiology Clinic | Ready Hospital Business Plan | How Much Does It Cost to Open a Motel | Set up a swimming academy | How to Open a Company to Provide Marmitex | Gas Station Floor Plan | Projects for Fast Food Stores | Aesthetic Clinic Floor Plans | Description Disposable Diapers Project | Jewelry Manufacturing Flowchart | Assembling Cloth Strainer | Decolchas Model | How to Open a Plastic Injection Company | Hair Piranha Supplier | Work Making Clothespins At Home | How to Set Up a Skateboard Factory | Pole Manufacturing Equipment | Alcohol Production Model | Foundry Plant | Assemble Concrete Staircase | Floor Plan2c Clinical Analysis Laboratory | Description Flowchart- Milk Drink and Cottage Cheese | I Want to Set Up an Epi Resale | How to Create an Organizational Chart for a Mechanical Industry | Standard Operating Procedures for Drug Distributors | How to Make a Model of a Clinic | How to Set Up an Optician's Shop | Set Up Typing Room | Business Plan2c Visual Communication Companies | How Much Does It Cost To Set Up A Cell Phone Repair Shop | Winch Feasibility Study | How to Set Up a Soda Factory | Ecological Bricks Poços De Caldas Mg | Machines for Making Sweets for Parties | Equipment Needed to Set Up a Candy Factory | How to Set Up a Natural Juice Company | Kennel Construction Floor Plan |

 

Other projects ready:

How to start Factory to Produce Fruit Sweets and Fruit Pulp with capacity for 3.000 Kg/day.
Project Buffet with capacity for 500 people.
PDF Factory to Produce Chicken and Meat Stock Tablet with capacity for 3.000 Kg/day.
Plant and layout Factory to Produce Vinegar made from Honey with capacity for 10.000 liters/day.
Project Factory to Produce Dough of Frozen Cheese Bread with capacity for 15.000 Kg/day.
Project Salon for Feet Treatment with capacity for 70 people.
FeasibilityMilk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Packed Milk types B and C, with capacity of 1000 liters/day.
Business plant Factory to Produce Baby Food with capacity for 1.000 Kg per day.
Project Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Deboned Meat Reception) with capacity for 10.000 Kg/day.
How to start Industry Mineral Water Bottling with capacity for 30.000 liters/hour, in flagons of 10 and 20 liters and plastic cups.

Project - how to start Slaughterhouse Caprines with capacity to Slaughter 10 animals/day.