Ready project Slaughterhouse Caprines with capacity to Slaughter 100 animals/day.

CODE - FRC-007

Ready project Slaughterhouse Caprines with capacity to Slaughter 100 animals/day.

CODE - FRC-007


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Caprines
Future Stunning area for Bovines and Swines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small guts Section
Cold Storage for Small Guts
Small Guts Packaging
Expedition for Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather and Horn Reception Section
Rendering:
Bone Section
Blood Drying Section
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Caprines

How to start Slaughterhouse Caprines with capacity to Slaughter 100 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Caprines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Goat Farm Floor Plan Design | Minimarket Project Template | How to Rent Books | How to Set Up a Car Resale Business | Facade of natural products | How to Set Up a Small Shoe Store | Studies on Compounding Pharmacy | How to Set Up a Celebration Basket Business | Projects About Plants in Early Childhood Education | Rabbit Slaughter In Mg | Depururuca Pasta Factory | Sports Complex Floor Plan | Surgical Center Layout and Its Classification | Projects in UBS | Example of a physical plant of a utility | List of Machines and Equipment for Setting Up a Steakhouse | Supermarket Building Models | Ready-made Project Templates Rental Management | A Business Plan For A Boat | Academic Work Lava Jato Feasibility | What Materials to Set Up a Nightclub | Costs of Producing a Toothbrush | Plastic Mass Mixing Machine | How to Set Up a Lingerie Factory Plan | Leather Bag Industry Flowchart | Wooden Trash Can Model | Investments for Plastic Wood | School Furniture Factory | Cost To Open A Concrete Plant | How to Make Binders and Folders to Sell | Italian Machines for Making Pans | Screen Fence | Facade of a clinical analysis laboratory | DWG Block 10000 Liter Tank | Approval of Project to Manufacture Mineral Water Ice | Parking Business Plan | Standard Operating Procedure for Cold Storage | Carrier Operating Procedure Template | Telesales Room Model | Documentation for Setting Up a Seedling Nursery | Where to Get Funding to Set Up a Radio Provider | Main Clients of Bookbinding Companies | Truck Refrigeration | Photo Studio Financing | Fruit Pulp Factory For Sale | Work Cost Production Cheese Bread | Canned Corn and Peas Factory Can Packaging | Assemble Nimi Chestnut Factory | Worcestershire Sauce Factory | Bakery Cad Design Plan |

 

Other projects ready:

How to start Factory for Popcorn Processing (Micro-Wbird package) with 400m² (478,4 sq.yd.) area and capacity of 3.000 kg/day.
Project Factory to Produce T-Shirts with capacity for 50 units por day.
PDF Poultry House with capacity for 1.000 Broiler Chickens.
Plant and layout Factory to Produce Banana Raisin with capacity for 60.000 Kg/day.
Project Meat Shop with an area of 100 m2.
Project Factory to Produce Mead, Vinegar made from Honey, Cachaça of Honey and White Wine (Prosecco) of Honey with capacity for 100 liters/day.
FeasibilitySwine Farm (Conventional) with capacity to Produce 224 Matrix.
Business plant Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 300 animals/day.
Project Station of Wastewater Treatment for Milk and Dairy Industries with until 10.000 liters of Milk per day.
How to start Factory to Produce Tomato Extract and Tomato Pulp with capacity for 30.000 Kg per day.

Project - how to start Slaughterhouse Caprines with capacity to Slaughter 100 animals/day.