Ready project Slaughterhouse Caprines with capacity to Slaughter 150 animals/day.

CODE - FRC-009

Ready project Slaughterhouse Caprines with capacity to Slaughter 150 animals/day.

CODE - FRC-009


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Caprines
Future Stunning area for Bovines and Swines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small guts Section
Cold Storage for Small Guts
Small Guts Packaging
Expedition for Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather and Horn Reception Section
Rendering:
Bone Section
Blood Drying Section
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Caprines

How to start Slaughterhouse Caprines with capacity to Slaughter 150 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Caprines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Hatchery Dressing Room Plant | Pillow Production Costs | Milking Installation Project In DWG | Service Flowchart for Hydraulic Pump Assembly | Ready Store Budget | How to Set Up a Cold Cuts Boutique | Self-Serve Ice Cream Shop Models | DWG in Portuguese for Glassworks | How to Write a Shoe Store Business Plan | List of the Main Drug Distributors in Brazil | How to Start a Food Delivery Business | Driving School Projects | How to Start a Pig Business | Slaughtering Conveyor | Gymnasium Dwg Floor Plan | Medical Clinic Facades | How to Set Up an X-Ray Room | How to Set Up a Neonatal and Pediatric ICU | Internet Cafe Floor Plan | Self-service Restaurant Project | Group Meal Business Plan | Nightclub Cable Scheme | Ecological Lava Rapido Business Plan | How to Set Up a Children's Buffet What Materials to Start With | Setting Up a Serpentarium | 3d .dwg block Camping Tent | How to Set Up a Suit Factory | Sewing Factory Design Template | Trash Bags Project | Upholstery Manufacturing Equipment | MDF Manufacturing Machines | Gondola Projects | Forms for Making Moorings | Envelope Template to Assemble | Set up an aluminum frame factory | Pallet Rack Drawing | What is needed to set up a prosthesis laboratory project? | Yogurt Bag | How to Set Up a Mineral Water Company | Car Parking - Projects | Refrigeration Operating Procedures Manual | Pop For Uan | Credit for Beauty Salons | Search for Instruments to Set Up a Funeral Home | What to Do to Open a Van Rental Company | Ready-made Real Estate Projects | Open a Car Wash | Sound Studio Floor Plan | Pig Farm Design | Pasta Factory Consultant | Where to Buy Acarajé Making Machine | Mayonnaise Production | Producers of Acai Pulp | Tomato Pulp Production Equipment | Pet Shop Floor Plan |

 

Other projects ready:

How to start Factory Improvement of Vegetables (lettuce, acelga (swiss chard), borecole, cabbage, carrot, beetroot, cucumber, beans-string bean, cauliflower and broccoli) with capacity to produce 15.000 Kg per day.
Project Factory to Produce Jerked Beef (Salted Fresh Meat), with Deboned Meat Reception, and capacity for 3.000 Kg/day.
PDF Clothing Industry to Produce Female Tencel Jeans Pants with capacity for 300 garments/day.
Plant and layout Factory to Produce Vinegar made from Honey with capacity for 3.000 liters/day.
Project Non-Perishable Food Deliverer with capacity for 5.000 Kg/day.
Project Auto Body Repair with an area of 500 m2.
FeasibilitySlaughterhouse Cold Meat Production (sausage, cooked ham, jerked beef) with an area of 250 m² and capacity for 5000 kg/day - Carcass Reception
Business plant Factory to Produce Fresh Dough for Pizza, setting up for Pizza (Filled and Frozen) and Dough for Pastry with capacity for 3.000 Kg/day.
Project Factory to Produce Dough of Frozen Cheese Bread with capacity for 500 Kg/day.
How to start Factory to Produce Pastry Dough with capacity for 500 kg/day.

Project - how to start Slaughterhouse Caprines with capacity to Slaughter 150 animals/day.