Ready project Slaughterhouse Caprines with capacity to Slaughter 200 animals/day.
CODE - FRC-010
Ready project Slaughterhouse Caprines with capacity to Slaughter 200 animals/day.
CODE - FRC-010Project ready with:
Industry with the following sections:First Floor:
Stunning area for Caprines
Future Stunning area for Bovines and Swines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small guts Section
Cold Storage for Small Guts
Small Guts Packaging
Expedition for Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather and Horn Reception Section
Rendering:
Bone Section
Blood Drying Section
Garage
Office
Canteen
Inspection Room
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Slaughterhouse Caprines
OPTIONAL SERVICES:
- Financial Feasibility Study of Slaughterhouse Caprines with capacity to Slaughter 200 animals/day.
- Business plan for Slaughterhouse Caprines with capacity to Slaughter 200 animals/day.
- 3D project of Slaughterhouse Caprines with capacity to Slaughter 200 animals/day.
Projects with other capacities
Slaughterhouse Caprines
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
.refrigeratorproject | Business Plan Template for Mini Market Ready | Aeromodelling Business Plan | Set Up a Company That Sells Medical Hospital Products | Dairy Store Templates | Ice Cream Plant | Ready-Made Glass Projects | Machines for Making Lingerie | How to Open a Medicine and Surgical Products Distribution Company | Export Of Frozen Food To Angola | Playroom Floor Plan | Goat Refrigeration Equipment | Floor Plan of a 300m2 House | Multi-Sports Court Floor Plan Section | Documents Required to Open Clinics | DWG Floor Plan Project For Basic Sac39ade Unit | Ready-made Business Plan for Mobile Use | Auditorium Project .dwg | Minimarket Plans and Models | Restaurant Layout Dwg | What You Need to Open a Nightclub | Plants and Car Wash for Construction | How to Open a Show and Entertainment Company | Serpentarium Licensing | Floor Plan Stamp | Bermuda Shorts Production Process | How to Make a Polo Shirt | PVC Pipe Industry Viability | Assemble Sofa Factory | How to Set Up a Catering Business | Billiard Factory Project | How to Make a Floor Plan for an Asphalt Plant | How to Start a Paper Company | Aluminum Frame Plans | How to Open a Waste Paper Factory | Vet Montar Laboratory | Agroindustrias De Doce DWG | Mineral Water Factory Project | Ready Project For A Parking Lot | Manual Pop Meat Model | Standard Operating Procedures in Restaurants | Example of a Beauty Salon Organization Chart | Greenhouse Construction for Organic Garden | Ice Cream Kiosk Floor Plan | Organizational Chart of an HR Consulting Company | Office Floor Plan Project | How to Set Up a Filming Studio | Making Pasta | Hot Dog Production Line | Carrot Processing Project | Fruit Pulp Industrial Business Plan | How to Make Ketchup |
Other projects ready:
How to start Factory to Produce Cashew Syrup with capacity for 500 Kg per day.
Project Factory to Produce Frozen Açaí Pulp with capacity for 1.000 Kg per day.
PDF Factory to Produce Pepper Paste with capacity for 100 Kg/day.
Plant and layout Industry to Produce Footwear with capacity for 50 pairs/day.
Project Factory to Produce Mead with capacity for 3.000 liters/day.
Project Factory to Produce Pies with capacity for 100 Kg/day.
FeasibilityPoultry House with capacity for 1.000 Reproduction Chickens (in Individual Chicken Coops) and Built area of 200 m².
Business plant Clothing Industry to Produce Caps with capacity for 200 garments/day.
Project Cabinetmaking with capacity for 25 tons/day.
How to start Factory for Manioc Flour with capacity of 1000 kg/day and 225 m² (269,1 sq.yd.) area.



