Ready project Slaughterhouse Caprines with capacity to Slaughter 300 animals/day.

CODE - FRC-011

Ready project Slaughterhouse Caprines with capacity to Slaughter 300 animals/day.

CODE - FRC-011


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Caprines
Future Stunning area for Bovines and Swines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small guts Section
Cold Storage for Small Guts
Small Guts Packaging
Expedition for Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather and Horn Reception Section
Rendering:
Bone Section
Blood Drying Section
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Caprines

How to start Slaughterhouse Caprines with capacity to Slaughter 300 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Caprines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

.assemblefridge | How to Register Goats | Cattle Projects | Production Costs Work of a Soap Factory | Auto Parts Facade Model | Container Sale Project | Used Car Shop Project | How to Set Up a Candy Shop | How to Set Up an Orthopedic Products Company | Discover the Salted Peanut Factory | Drugstore Layout Floor Plan | Capacity in Medicine Distributor | Music School Project | Organizational Chart of a Chicken Cold Storage Plant | Cost of Setting Up a Meat House | Football Stadium Design In Dwg | Create a Clinic Floor Plan Online | Ready Projects Party Hall | Ready Bar Project | Ballroom Dancing Project Value | Bowling Alley Setup Costs | Effluent Flowchart Model for Car Wash | Restaurant Organization Chart | Water Analysis Laboratory | How to Start a Button and Keychain Business | Knitting Industry Projects | Clothing Manufacturing Layout | Glass Factory For Sale | How to Set Up a Plastic Recycling Industry | Buy Autoclave For Wood | Open Block Factory | Food Delivery Packaging Model | I want to set up a board factory | Example of a facade with a hose | Machines for UHT Milk Production | Flowchart of a Beverage Distributor | Flowchart for Battery Manufacturing Company | Customer Qualification Pops | Pop About Freezer Cleaning | How to Start a Passenger Transport Company | How to Start a Health Insurance Sales Company | Business Plan for Rapid Printing | Cpmp Set Up a Coffee Break | Lathe Layout | Projects S For Ice Cream Shop | Frozen Pizza Materials | Alligator To Ride | Nutritional Information for Ready-to-Eat Potatoes | Organizational Chart of a Guarana Company | Essential Oil Distilleries | Set Up Pet Cemetery |

 

Other projects ready:

How to start Factory to Produce Bran Fodder for Fishes, Cats and Dogs with capacity for 20.000 Kg/day.
Project Factory to Produce Chocolate Powder with capacity for 20.000 Kg/day.
PDF Factory to Produce Toasted Cashew Nut with capacity for 1.000 Kg per day.
Plant and layout Factory to Produce Cotton Yarn Bandage (with sterilized in autoclbird) with capacity for 50.000 bandages per day.
Project Clothing Industry to Produce Jeans Pants with Laundry Sector (Stone Wash) with capacity for 300 garments/day.
Project Factory to Produce Chocolate with capacity for 1.000 Kg/day.
FeasibilityFactory to Produce Barbecue Spit with capacity for 100 Kg/day.
Business plant Factory to Produce Pasteurized Orange Juice with capacity for 3.000 liters per day.
Project Cold Storage Room to Process ALIVE and Stunned Shrimps with capacity to Produce 60.000 Kg/day.
How to start Tannery for Wet Blue until Finishing Plant, with capacity for 500 leathers/day.

Project - how to start Slaughterhouse Caprines with capacity to Slaughter 300 animals/day.