Ready project Slaughterhouse Caprines with capacity to Slaughter 500 animals/day.

CODE - FRC-013

Ready project Slaughterhouse Caprines with capacity to Slaughter 500 animals/day.

CODE - FRC-013


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Caprines
Future Stunning area for Bovines and Swines
Evisceration
Inspection Department
Entrance Hall for Cold Storage
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Craws and Guts
Small guts Section
Cold Storage for Small Guts
Small Guts Packaging
Expedition for Small Guts and Guts
Lower Floor:
Rendering Reception Section
Leather and Horn Reception Section
Rendering:
Bone Section
Blood Drying Section
Garage
Office
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Caprines

How to start Slaughterhouse Caprines with capacity to Slaughter 500 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Caprines

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

.assemblefridge | Hardware Store Products | Perfume Store Layout | Financing for Construction of a Fuel Station by BNDES | How to Set Up a Crepe Buffet at Home | Gardening Business Plan | Structure of a Surf Shop Project | Honey Pallet Flowchart | Homeopathy Compounding Pharmacy Layout | Project Leftovers | What You Need to Set Up a Cooking School | Value Build Camarao Refrigerator | Business Plan for 7-a-side Football Court Company | Costs of a Radiology Clinic in Dentistry | Ready-made Physiotherapy Business Plan | Kitchen Plans for Restaurant | Residences 30m2 Project | Apart Hotel Projects Program | Pizzeria Floor Plan | Pasta House Business Plan | Horse Stall Building Plans | Phytotherapy Flowchart | How Much Does It Cost to Set Up a Marble Shop? | I Need A Ready Made Paper Mache Project | How to Set Up a Bikini Factory | Shoe Industry Business Plan Template | I would like to set up an inflatable factory | Coal Packaging Machines | Timber Layout | Cement Block Budget | Electric Cars Toy Industry | Economic Feasibility Project for Paper Bags | Wooden Cage Manufacturer | How to Open a Laboratory for Building Materials | Credit for Minas Cheese | 500mc2b2 DWG Plant | Price to Set Up a Painting Workshop | Types of BMX Track Obstacles | Ready-made Popc2b4s Templates | Standard Business Procedures Template | Layout Templates for Opticians | Inbound Tourism Agency Template | Set Up a Small Construction Company | Articles Flowchart | How to Start a Cleaning Business | Suppliers of Raw Materials for Making Mineral Salt | I want to build a pottery shop | Industrial Bread Making Machine | How to Make Corn Chips | Seasoning Factory Project | Sulfuration Chamber | Biscuit Factory Business Plan |

 

Other projects ready:

How to start Drinks and Soft Drinks Deliverer with volume of 3.000 liters/day.
Project Industry to Produce Footwear with capacity for 300 pairs/day.
PDF Swine Farm (with Overlapping Bed) with capacity to Produce 224 Matrix.
Plant and layout Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water with a machine to make PET Bottles.
Project Tanning Ostrich Skin with capacity to Produce 100 Skins per day.
Project Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 150 animals/day.
FeasibilityCleaning Company with an area of 300 m2.
Business plant Clothing Industry to Produce Tactel Pants and Jackets with capacity for 100 garments/day.
Project Factory to Produce Ice Lolly Stick, Ice Cream Spade, Toothpick, Barbecue Spit and Clothes Peg with capacity for 5.000 Kg/day.
How to start Milk and Dairy Industry to be built in 2 phases: 1st phase: Fresh Cheese production (Ricota, Muzzarela, Minas Frescal), Matured Cheese (Prato, Minas Standard, Cobocó) and Parmesan, with 178 m2 (212,98 sq.yd.) area and capacity for 4000 liters/day. 2nd phase: Amplification to Produce Yoghurt and Milky Beverages, with 216 m2 (258,33 sq.yd.) of total area and capacity for 6000 liters/day.

Project - how to start Slaughterhouse Caprines with capacity to Slaughter 500 animals/day.