Ready project Slaughterhouse Ovines with capacity to slaughter 5 animals/day.

CODE - FRC-032

Ready project Slaughterhouse Ovines with capacity to slaughter 5 animals/day.

CODE - FRC-032


Project ready with:

Industry with the following sections:
Stunning area for Ovines
Evisceration
Inspection Department
Antechamber
Cold Chamber for Carcass
Control and Expedition
Expedition Platform
Rendering Reception Section
Reception area for Small guts
Reception and Treatment area for Guts (1st and 2nd phases)
Pens

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Ovines

How to start Slaughterhouse Ovines with capacity to slaughter 5 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Ovines

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Sheep Slaughterhouse Layout | Academic Materials on Goat Farming in Brazil | Photo Development How to Start a Business | Layout of a Tire Sales Company | Rotiseri Project | Plaster Application Bndes | I Want to Set Up a Fabric Store | Exhaust Distributor Floor Plan | How to Set Up a Business to Sell Basic Food Baskets | Driving School Business Plan Template | Slaughterhouse Plan | Fruits of the River Belo Horizonte Mg | Multi-sport gym plans and sections in DWG | Medical Clinic Pop Templates | Assemble an ESF | What is the Physical Plant in the Emergency Room? | Buffet 400 People Sp | Organizational Chart of a Farm | Preparation of Physical Plan for Industrial Restaurant | How to Set Up a Nightclub | Dry Washing Machine Layout | Set Up Children's Party House | Hearing Aid Project Physical Plan | How to Set Up a Mattress Factory | Company Organization Chart for Party | Layout of a Uniform Factory | How to Set Up a Non-Woven Bag Factory | Styrofoam Tray Factories | Main Raw Material School Desks | Wooden Door Manufacturing Machines | Projects of Machines for Treating Morões | Kite Mold | Aluminum Frames Budget Templates | Invest in Zinc Plating | Set up a Prosthesis Laboratory | Yogurt Ice Cream Factory | Pest Control Companies | Open a Car Armoring Workshop | Recall Operational Procedure | Restaurant Standard Operating Procedure Manual Template | Flowchart of a Beauty Salon | How to Set Up a Service Provider | Vehicle Rental Feasibility | Model Representation Office | How to Set Up a Construction Cleaning Company | Pig Farm Equipment Manufacturers | What Materials to Set Up a Bakery at Home | How to Make a Blueprint and Approved Project for Crem | Drying Brazil Nuts | How to Open an Acerola Company | Hot Sauce Factory | Pet Shops Financing |

 

Other projects ready:

How to start Factory to Produce Organic Cachaça (Liquor) with capacity for 10.000 liters/day.
Project Cachaça (Liquor) Factory, with capacity for 1.000 liters/day. (To be built in a different level land).
PDF Slaughterhouse for Swine - 100 animals/day - area of 950 m² (1136,2 sq.yd).
Plant and layout Poultry House with capacity for 3.000 Broiler Chickens.
Project Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters.
Project Factory to Produce Mushroom Shiitake with capacity for 1.000 Kg per day.
FeasibilityMalharia with capacity for Production para 200 pieces por day.
Business plant Telemarketing with capacity for 300 operators.
Project Factory Coffee Roasting with capacity for 3.000 Kg/day.
How to start Factory to Produce Macaroni for dry Pasta with capacity for 500 kg/day.

Project - how to start Slaughterhouse Ovines with capacity to slaughter 5 animals/day.