Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Slaughterhouse Ovines with capacity to slaughter 50 animals/day.
CODE - FRC-035
Ready project Slaughterhouse Ovines with capacity to slaughter 50 animals/day.
CODE - FRC-035
Project ready with:
Industry with the following sections:
Stunning area for Ovines
Evisceration
Inspection Department
Antechamber
Cold Chamber for Carcass
Control and Expedition
Expedition Platform
Rendering Reception Section
Reception area for Small guts
Reception and Treatment area for Guts (1st and 2nd phases)
Pens
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Slaughterhouse Ovines
OPTIONAL SERVICES:
Financial Feasibility Study of Slaughterhouse Ovines with capacity to slaughter 50 animals/day.
Business plan for Slaughterhouse Ovines with capacity to slaughter 50 animals/day.
3D project of Slaughterhouse Ovines with capacity to slaughter 50 animals/day.
Projects with other capacities
Slaughterhouse Ovines
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
|
Industrial Shampoo Production
|
Financial Plan for a Soap Factory
|
Electrical Materials Store Layout
|
Oil Change Project on the Ground
|
Agricultural Project (model)
|
Start A Trade. Which
|
Set Up a Lighting Company
|
Lingerie Store Floor Plans
|
Chewing Gum Making Machines
|
How to Assemble a Cleaning Product Dispenser
|
Organizational Chart of a Daycare Center
|
How to Set Up a Mini Sewage Treatment Plant
|
Flowchart of Pig2cGoat2cBeef Feed Manufacturing
|
Fish Filleting Equipment
|
How Much Does It Cost to Build a Hospital
|
How to Set Up a Biological Waste Collection Company
|
Initial Investment to Set Up an Incinerator
|
Motel Pants
|
LAN Layout Project
|
Convenience Store Flowchart
|
Cafeteria Layout Template
|
Basic Massage Clinic Project
|
Syringe Manufacturers
|
Machines for the Synthetic Marble Industry
|
Jeans Manufacturing Business Plan
|
Investment in Plaster Factory
|
Plastic Cup Production Capacity
|
Sandblasting Project
|
Squeegee Factory Project
|
Machines and Equipment for Surfboard Production
|
Effluent Treatment Concrete Pole Manufacturing
|
Online Wet Wipe Factory
|
Aluminum Recycling Plant
|
Gas Cylinder Factory
|
How Much Does It Cost to Set Up a Clinical Analysis Laboratory?
|
Cheese Making Mold Templates
|
Vehicle Painting Workshop Material
|
Canned Egg Factory Plant
|
Pop Layout
|
Open a Resale of Cooking Gas Cylinders
|
Warehouse 100m2
|
Business Plan for a Condominium Management Company
|
Floor Plan For Engineering Office
|
Frames Factories
|
Create a Cleaning Service Company
|
Plants In Beverage Production
|
French Bread Flowchart
|
Omelette Making
|
Floor Plan of a Fruit Pulp Industry
|
Floor Plan of the Construction of a Factory for the Production of Rice Flour
|
Juice Factory Schedule
|
How to Set Up Dog Boarding
|
Other projects ready:
How to start Family Health Program with an area of 250 m2.
Project Ice Cream Parlor with an area of 100 m2.
PDF Factory to put Cachaça (Liquor) in bottles, with capacity for 20.000 liters/day.
Plant and layout Poultry House with capacity for 10.000 Broiler Chickens and a Built area of 1.200 m².
Project Factory to Produce Canned Pepper with capacity for 3.000 Kg per day.
Project Bakery with an area of 100 m2.
FeasibilityFactory to Produce Banana Sweet with capacity for 1.000 Kg per day.
Business plant Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), with capacity of 6000 liters/day.
Project Factory to Produce Alcohol Gel with capacity for 10.000 liters/day.
How to start Industry to Produce Footwear with capacity for 500 pairs/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US