Ready project Slaughterhouse Quails with capacity for 3.000 birds per day.

CODE - FRIG-201

Ready project Slaughterhouse Quails with capacity for 3.000 birds per day.

CODE - FRIG-201


Project ready with:


Industry with the following sections:

Reception Platform
Stunning
Scalding
Feather Withdrawn
Evisceration
Packages
Cold Chamber
Expedition
Cutting Room
Storage for Boxes
Storage for Packages

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Quails

How to start Slaughterhouse Quails with capacity for 3.000 birds per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Quails

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Physical Arrangement of Poultry Slaughterhouse | Slaughterhouse Business Plan | Industrial Slaughterhouse for Quails | Bird Work Plan Templates | Academic Work on Quails | Soap Making Layout | Minimarket Ideas | How to Set Up a Construction Tool Rental Business | How to Open a Dental Supply Store | How Much Does It Cost To Open A Dairy Store | I Want to Set Up a Snack Bar | Baby Store Facade | How to Set Up a Costume Rental Store | How to Start a Pharmacy Business | How to Set Up a Condiment Factory | Budget for a toy library | Slaughter Room Project | Layout of the rendering plant | Multi-Sport Courts CAD Models | Floor Plan of Medical Clinic Rooms | What is the physical plan of a UBS? | How to assemble UTI | Coffee Shop Project Template | Techniques for Opening a Supermarket Model A Supermarket | Basic Experimental Kitchen Project | Floor Plan Concert Hall | Car Wash Assembly Project | Ready Projects About Party Houses | Dialysis Equipment Manufacturers | Ready Work Mechanical Production | T-Shirt Faction | I Want to Set Up a Polo Shirt Factory | Projects for a Broom Factory with Pet | Cattle Feeders and Drinkers | Tel Manufacturer of Drumsticks | Wastewater Treatment in Carpentry | Asphalt Plant 1002f120 Schematic | How to Make Cardboard Tubes | Iron Making Schedule | Motorcycle Exhausts Assembly | Animal Clinical Analysis Portugal | Timeline Of A Cheese | How to Set Up a Parking Lot | What Is Standard Operating Procedure Pop | How to Develop Standard Operating Procedures | Beauty Salon Organization Chart Templates | Ready Business Plan About Organic Greenhouses | How to Set Up Vehicle Monitoring | Business Plan for an HR Consulting Firm | How to Set Up a Refrigeration Workshop | Filming Company - How to Open | Popsicle Processing | How to Set Up a Mini Fresh Pasta Factory | Biscuit Factory Assembly Machines | I Want to Open a Fruit Pulp Distributor | Machine Dried Tomatoes | How to Make Dog Sticks |

 

Other projects ready:

How to start Factory to Produce Soft Drink with capacity for 80.000 liters/day.
Project Day Care with capacity for 100 children.
PDF Pen for Cattle Distribution (Beef Cattle), with capacity for 80 animals, with Stanchion and area of 1.200 m².
Plant and layout Cold Storage Room to Process Stunned Shrimps (from Marine Fisheries) with capacity to Produce 20.000 Kg/day.
Project Factory to Produce Creams and Fondant with capacity for 3.000 Kg/day.
Project Factory to Produce Bleach with an area of 200 m² and capacity for 2.000 liters/day.
FeasibilityFactory to Produce Ready Frozen Raw Savory Pastries (Salgadinhos) (Coxinha, Pasty, Esfiha, Kibe, Hamburger) with capacity for 1.000 Kg/day.
Business plant Bonded Warehouse for Poultry Meat with capacity for 5.000 Kg/day.
Project Clothing Industry to Produce Tactel Pants and Jackets with capacity for 200 garments/day.
How to start Clothing Industry to Produce T-Shirts with capacity for 50 garments/day.

Project - how to start Slaughterhouse Quails with capacity for 3.000 birds per day.