Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Slaughterhouse Quails with capacity for 5.000 birds per day.
CODE - FRIG-202
Ready project Slaughterhouse Quails with capacity for 5.000 birds per day.
CODE - FRIG-202
Project ready with:
Industry with the following sections:
Reception Platform
Stunning
Scalding
Feather Withdrawn
Evisceration
Packages
Cold Chamber
Expedition
Cutting Room
Storage for Boxes
Storage for Packages
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Slaughterhouse Quails
OPTIONAL SERVICES:
Financial Feasibility Study of Slaughterhouse Quails with capacity for 5.000 birds per day.
Business plan for Slaughterhouse Quails with capacity for 5.000 birds per day.
3D project of Slaughterhouse Quails with capacity for 5.000 birds per day.
Projects with other capacities
Slaughterhouse Quails
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
How to Make a Quail Farming Model
|
5000avesdia slaughterhouse
|
Forum on How to Set Up a Milking Parlor
|
I Want to See Pump Workshop Building Models
|
How to Set Up a Medical and Hospital Products Distributor
|
How to Open a Deli
|
Rotisserie Layout
|
How to Set Up Seedling Sales
|
Project About Children's Thrift Store
|
Cost to Set Up a Medication Distributor
|
Ready-made Basic Food Basket Business Plan Worksheet
|
Ready-made Driving School Business Plan
|
Beef Cold Storage Budget
|
Plan to Build Pig Slaughterhouse
|
DWG Sports Gym
|
Business Plans Ready Medical Office
|
Functional Organization Chart of a UBS
|
How Does an ICU Work?
|
Study to Open a Buffet
|
Self-Service Restaurant Floor Plan
|
How to Set Up a Collective Kitchen
|
Cost of Setting Up a Dance Club
|
Quick Wash Pants
|
Children's Party House Projects
|
Serpentarium Floor Plan Model
|
Set Up Tent Factory
|
Women's Clothing Business Plans
|
Technological and Production of a Uniform Company
|
Set up Garbage Bag Manufacturing
|
Raw Material for Plastic Straws
|
MDF Factory
|
Gc3b4ndolas Bndes
|
Post Hardware
|
Gift Box Making Machines
|
Aluminum Window Factories Poços De Caldas
|
Investment to Set Up a Door Factory
|
What Equipment Is Needed to Set Up a Prosthetics Laboratory?
|
Yogurt Bag Packaging
|
Water Bottling Equipment
|
How to Conduct a Study to Set Up a Parking Lot
|
Example of a Company's Operational Process
|
Restaurant Pops
|
Floor Plan Design for Beauty Salon
|
I'm looking for a store to set up a funeral home
|
Documentation for Renting a Van
|
Factoring Business Plan
|
Washing Station Project Floor Plan
|
Recording Studio Floor Plan
|
Setting Up a Pig Farm
|
Industrial Production of Snacks
|
Organization Chart of a Biscuit Factory
|
I Want to Make Baby Food
|
What is needed to set up an açaí factory?
|
Financing of a Feed Factory by BNDES
|
Models for Building a Pet Shop
|
Other projects ready:
How to start Footwear Industry to Produce Sneakers with capacity for 100 pairs/day.
Project Factory to Produce Concrete Blocks with capacity for 10.000 units per day.
PDF Industry to Produce Body Soap with capacity for 5.000 kg/day.
Plant and layout Factory to Produce Fried Garlic and Grinded Garlic with capacity for 5.000 kg/day.
Project Factory to Produce Organic Manure with capacity for 1.000 kg/day.
Project Factory to Produce Banana Powder (Banana Flour), Banana Raisin, Banana Raisin with Chocolate Covering, Banana Sweet, Banana Purée with capacity for 40.000 Kg/day.
FeasibilityFrog Meat Processing with capacity for 3.000 frogs per day.
Business plant Industry to Produce Bleach with capacity for 20.000 liters/day.
Project Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
How to start Cachaça (Liquor) Factory, with capacity for 5.000 liters/day and a built area of 1.100 m². (To be built in a different level land).
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US