Ready project Slaughterhouse Swines with capacity for 800 animals/day.

CODE - FRS-024

Ready project Slaughterhouse Swines with capacity for 800 animals/day.

CODE - FRS-024


Project ready with:

Industry with the following sections:
First Floor:
Stunning area for Swines
Future Stunning area for Bovines
Evisceration
Inspection Department
Entrance Hall
Freezing Tunnel
Cold Chamber for Carcass Stocking
Cold Chamber for Carcass
Carcass Expedition
Reception Room for Bristles and Hoof
Section for Small Guts
Cold Chamber for Small Guts
Small Guts Packaging
Guts and Small Guts Expedition
Lower Floor:
Rendering Reception Section
Reception area for hooves
Rendering:
Bone Section
Dry Blood Section
Garage
Ofiices
Canteen
Inspection Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Slaughterhouse Swines

How to start Slaughterhouse Swines with capacity for 800 animals/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Slaughterhouse Swines

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Machines for Pigs | Hardware Business Plan | Cosmetics Store Flow Template | How to Finance a Gas Station | Ready-Made Coffee Business Plan | Gardening Budget Template | Surf Shop Designer | Gingerbread Industry Project | Plants Compounding Pharmacy | DWG Fabrica Rubber Layout | English Schools - Investment Capacity | Beef Slaughterhouse Telephone Number Brasilia | Society Field Construction Project | Radiology Clinic Layout | Dental Practice Financing | Industrial Kitchen Budget Model Price | 70m2 House Models | Aparthotel Construction Project | Pizzeria Project Schedule | Work Plan for Geriatric Clinic | Horse Stall Designs | How to Make a Floor Plan for a Pharmaceutical Industry | What do I need to set up a marble shop? | Set Up a Crafts Factory | Bikini Company2fHow to Open | Layout of a Footwear Factory | Cell Phone Cover Factory | Charcoal Making Machines | How Much Does It Cost to Set Up a Lumberyard | Concrete Block Factory Project | Barbecue With Oven In Dwg | Clay Project | Models for Cage Manufacturing | Food Microbiology Laboratory Floor Plan | Flowchart of a Fresh Minas Cheese Production | Pop Hospital Reception | How to Do Bodywork and Painting on Cars | How to Build Wooden Skateboards | What Does Manual Pop Mean? | Hygiene Plan in the Cosmetics Industry | How to Start a Podiatry Business | Ready-made Inbound Business Plan | How Much Does It Cost to Set Up a Small Construction Company? | How to Set Up a Small Workshop for Technical Assistance in Domestic Appliances | How to Set Up a Cleaning Agency | Protein Salt Labels | Brick Ceramic Plant | French Bread Machine | Corn Snack Factory | Mushroom Ebook | Banana Chip Machine | Machinery for Setting Up a Pharmaceutical Tablet Industry |

 

Other projects ready:

How to start Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 3.000 Units per day.
Project Swine Farm (with Overlapping Bed) with capacity to Produce 448 Matrix.
PDF Pre-School with capacity for 500 children per day.
Plant and layout Factory to Producand Corn for Canjica with capacity for 2.000 Kg per day.
Project Factory to Produce Paper Coffee Strainer with capacity for 5.000 boxes/day.
Project Factory to Produce Fruit Juice with capacity for 15.000 liters/day.
FeasibilityFactory to Produce Fresh Dough for Pizza with capacity for 500 Kg/day.
Business plant Cold Meat Production and Meat Deliverer with capacity for 20.000 Kg/day.
Project Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 125 animals/day.
How to start Factory to Produce Blocks of Polystyrene Isopor.

Project - how to start Slaughterhouse Swines with capacity for 800 animals/day.