Ready project Smoker with capacity to produce 300 Kg/day.

CODE - FRIG-191

Ready project Smoker with capacity to produce 300 Kg/day.

CODE - FRIG-191


Project ready with:


Industry with the following sections:

Reception
Manipulation Room
Smoker
Expedition
Selling Area
Office
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Smoker

How to start Smoker with capacity to produce 300 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Smoker

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Make a Smoker | Smoker with 300kg capacity | House Projects With 120m2 | Corral Construction Project | Shampoo Manufacturing Cost | How to Create an Auto Parts Store Design | Legisla25c325a725c325a3o Manufacture25c325a725c325a3o Of Containers | Popsiclecartshop | Chocolate Shop Facade | Facade of jewelry and accessories stores | Drugstore Floor Plan Layout | Cold Cuts and Dairy Layout | What It Takes to Open a Music Conservatory | Chicken Refrigeration Equipment | Roasted Meat House Project | Football Locker Room Floor Plans | Floor Plan of Surgical Center with | Physiotherapy Clinic Project Template | Hospital Autoclave Project | Business Plan, Party Hall | Bar Models to Assemble | How Much Does It Cost To Build A Bowling Alley? | Environmental Legislation for Car Washes | Lacart Restaurant Design | How to Set Up a Small Water and Effluent Analysis Laboratory | Handmade Soap Business Plan | Suit Making Machine | Lingerie Store Floor Plans | How to Set Up a Disposable Cup Factory | .plasticbottles | Educational Toys MDF Price | Pre-Formed Business Plan | Bread Packaging Factories | Set up a plate factory in Santa Catarina | How to Set Up a Turning Shop | Dairy Storage Silo Price | Water Budget Template for Customers | Automotive Battery Assembly | Pop Farmacia - Supplier Qualification | Pop for Clinical Analysis Laboratory | How to Open a Bus Agency | How to Start an Electronic Billboard Business | Rapid Graphic Feasibility | How to Set Up a Coffee Break Business | Fruit Pulp Factory Business Plan Template | Ready-made works on frozen foods | Layout For Wine Making | How to Make Frozen Pre-Fried Potatoes | Cocoa Almond Processing | Oil Factory Layout | How to Set Up an Animal Cemetery Legislation |

 

Other projects ready:

How to start Chinese Kitchen with capacity for 300 meals per day.
Project Factory to Produce Disposable Syringe with capacity for 10.000 Syringes per day.
PDF Factory for Fresh Cheese production (Muzzarela, Ricota, Minas Frescal), with capacity of 6000 liters per day.
Plant and layout Factory to Produce Manioc Flour and Sweet Starch Polvilho with capacity for 25.000 Kg per day.
Project Slaughterhouse Swines with capacity for 800 animals/day.
Project Factory to Produce Chewable Candies and Candy bars with capacity for 5.000 Kg/day.
FeasibilitySlaughterhouse Bovines, Swines and Ostrich with capacity for 5 animals per day.
Business plant Industrial Bakery to Produce Loaf Bread, French Bread, Frozen French Bread and Cakes with capacity for 3.000 Kg/day.
Project Slaughterhouse to Sluaghter Bovines and Swines with capacity for 30 Bovines and 50 Swines per day (this capacity can reach 60 Bovines and 100 Swines day) with1.020 m² (1.220 sq.yd) of constructed area, with room of Boneless Meat and Cold Storage for Boneless Meat. Note.: This project is an amplification of FRIG-02 increasing the Room of Boneless Meat.
How to start Factory to Process French Fries, produced with Sliced Potato (Potato Chips, Potato Sticks) from Potato Mass with capacity for 10.000 Kg per day

Project - how to start Smoker with capacity to produce 300 Kg/day.