Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Smoker with capacity to produce 70 Kg/day.
CODE - FRIG-189
Ready project Smoker with capacity to produce 70 Kg/day.
CODE - FRIG-189
Project ready with:
Industry with the following sections:
Reception
Manipulation Room
Smoker
Expedition
Selling Area
Office
Dressing Room
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Smoker
OPTIONAL SERVICES:
Financial Feasibility Study of Smoker with capacity to produce 70 Kg/day.
Business plan for Smoker with capacity to produce 70 Kg/day.
3D project of Smoker with capacity to produce 70 Kg/day.
Projects with other capacities
Smoker
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Project to Build a Smokehouse
|
How a Cosmetics Company Works and the Organizational Chart and Flowchart
|
Consortium for Goat Breeding
|
What Products Should I Use to Open a Pet Food Store?
|
Setting Up a Tractor Parts Store
|
Setting Up Lighting Store
|
How Do I Make an Organization Chart for a Rotisserie?
|
How to Assemble an Acrylic Bathroom Shower Enclosure
|
Teen Clothes Sale
|
Distributor Project Model
|
How to Open a Food Basket Distributor
|
Kindergarten Floor Plan
|
Beef Cold Storage Plant
|
Form to Produce Savory Snacks
|
What Does Quality Control Do In A Pig Slaughterhouse?
|
How to Open Materials in the Delivery Room
|
PSF Service Schedule Template
|
Emergency Room Floor Plan
|
Buffet Flowchart
|
20-Room Inn Floor Plans
|
Profitability of a Kilo Restaurant
|
What is the minimum investment to set up a nightclub?
|
Car Wash Equipment
|
Children's Buffet Assembly.
|
Farmace Intravenous Physiological Serum
|
Industrial Model Making
|
Machines for the production of scrap gloves
|
Mini Dairy Floor Plan Template
|
Ruler Production Tech
|
What Do I Need to Set Up a Toy Factory?
|
Design for Making Wooden Car Bodies
|
Assemble Cement Artifacts Factory
|
Set Up a Kite Shop
|
What It Takes to Start an Aluminum Window Business
|
Setting Up a Micro Machining Company
|
How to Set Up a Prosthetics Lab
|
Chocolate Fabric
|
Ready-made Food Manufacturing Practices Manual Templates
|
Hot Dog Car Project
|
Construction Budget and Design Manual
|
Restaurant Standard Operating Procedure
|
Equipment for Setting Up a Flower Shop
|
Manicure and Pedicure Feasibility
|
Plant Project Tourism Agency
|
Accounting Office Business Plan
|
How to Set Up a Fire Extinguisher Refill Store
|
Buy Pig Shed
|
How to Set Up an Industrial Confectionery
|
Pastel Production
|
Description Annatto Dye
|
Cupuaçu Enterprises
|
How to Set Up a Hot Sauce Factory
|
Bakery Layout In Cad
|
Other projects ready:
How to start Factory to Produce Lipstick with capacity for 100 kg/day.
Project Industry Mineral Water Bottling with capacity for 10.000 liters/hour, in flagons of 20 liters.
PDF Factory to Produce Caipirinha Drink with capacity for 20.000 liters/day.
Plant and layout Fruit Candy Factory with an area of 150 m² (179,4 sq.yd.) and capacity to produce other types of Candy.
Project Factory to Produce Pepper Sauce with capacity for 5.000 Kg per day.
Project Clothing Industry to Produce Lingerie with capacity for 500 garments/day.
FeasibilityIndustry Mineral Water Bottling with capacity for 30.000 liters/hour, in flagons of 10 and 20 liters and plastic cups.
Business plant Cold Storage Room to Produce Salted and Smoked Fishes and Fish Products with capacity for 3.000 Kg/day.
Project Slaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 10 animals/day.
How to start Factory to Produce Liquid Chocolate with capacity for 5.000 liters por day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US