Ready project Smoker with capacity to produce 70 Kg/day.

CODE - FRIG-189

Ready project Smoker with capacity to produce 70 Kg/day.

CODE - FRIG-189


Project ready with:


Industry with the following sections:

Reception
Manipulation Room
Smoker
Expedition
Selling Area
Office
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Smoker

How to start Smoker with capacity to produce 70 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Smoker

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Project to Build a Smokehouse | How a Cosmetics Company Works and the Organizational Chart and Flowchart | Consortium for Goat Breeding | What Products Should I Use to Open a Pet Food Store? | Setting Up a Tractor Parts Store | Setting Up Lighting Store | How Do I Make an Organization Chart for a Rotisserie? | How to Assemble an Acrylic Bathroom Shower Enclosure | Teen Clothes Sale | Distributor Project Model | How to Open a Food Basket Distributor | Kindergarten Floor Plan | Beef Cold Storage Plant | Form to Produce Savory Snacks | What Does Quality Control Do In A Pig Slaughterhouse? | How to Open Materials in the Delivery Room | PSF Service Schedule Template | Emergency Room Floor Plan | Buffet Flowchart | 20-Room Inn Floor Plans | Profitability of a Kilo Restaurant | What is the minimum investment to set up a nightclub? | Car Wash Equipment | Children's Buffet Assembly. | Farmace Intravenous Physiological Serum | Industrial Model Making | Machines for the production of scrap gloves | Mini Dairy Floor Plan Template | Ruler Production Tech | What Do I Need to Set Up a Toy Factory? | Design for Making Wooden Car Bodies | Assemble Cement Artifacts Factory | Set Up a Kite Shop | What It Takes to Start an Aluminum Window Business | Setting Up a Micro Machining Company | How to Set Up a Prosthetics Lab | Chocolate Fabric | Ready-made Food Manufacturing Practices Manual Templates | Hot Dog Car Project | Construction Budget and Design Manual | Restaurant Standard Operating Procedure | Equipment for Setting Up a Flower Shop | Manicure and Pedicure Feasibility | Plant Project Tourism Agency | Accounting Office Business Plan | How to Set Up a Fire Extinguisher Refill Store | Buy Pig Shed | How to Set Up an Industrial Confectionery | Pastel Production | Description Annatto Dye | Cupuaçu Enterprises | How to Set Up a Hot Sauce Factory | Bakery Layout In Cad |

 

Other projects ready:

How to start Milk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 100.000 liters/day.
Project Factory to Produce Caramels with capacity for 5.000 Kg/day.
PDF Factory of Honey and Bee Wax Production with an area of 300 m² and capacity for 3.000 liters/day and others by-products (honey, propolis, bee wax, royal jelly and honey composites).
Plant and layout Family Health Program with an area of 700 m2.
Project Clothing Industry to Produce Suit, Jacket and Suit Pants with capacity for 300 garments/day.
Project Slaughterhouse Bovines and Swines with capacity to Slaughter 500 animals/day.
FeasibilityFactory to ProProduce Fruit Sweet in Syrup with capacity for 15.000 Kg/day.
Business plant Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion, Body Soap with capacity for 500 Kg/day.
Project Factory to Produce Jelly Fruit with capacity for 10.000 Kg/day.
How to start Factory to Produce Macaroni Rice with capacity for 15.000 Kg/day.

Project - how to start Smoker with capacity to produce 70 Kg/day.