Ready project Tannery Caprine Skin with capacity to Produce 100 skins/day.

CODE - CTM-024

Ready project Tannery Caprine Skin with capacity to Produce 100 skins/day.

CODE - CTM-024


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Caprine Skin

How to start Tannery Caprine Skin with capacity to Produce 100 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Caprine Skin

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Start a Soap Business | Tannery Legislation To Open | Tannery Business Plan | Building Materials for Broiler Farms | Industrial Shampoo | Soap Bar Factory Project | Construction Material Layout | Oil Change Feasibility Project | Agricultural Store Project | Layout of a Retail Store | Luminaria Business Plan | Platan Low Lingerie Store | Raw Material for Chewing Gum | How to Set Up a Cleaning Products Distributor | Daycare Financial Plan | How to Set Up a Small Sewage Treatment Plant | Floor Plan for Meat Warehouse | Manufacturer of Fish Refrigeration Equipment | How Much Does It Cost to Set Up a Hospital? | How to Set Up a Garbage Incineration Company | 50kg Incinerator for Sale | Planning To Open A Motel | Lan-house-financing. | Supply of Marmitex for Companies | Gas Station Layout | Snack Bar Opening Project Template | Project D Massage Therapy Pa | Syringe Manufacturing Legislation | Synthetic Marble - Minas Gerais | Jeans Manufacturing Business Plan | Mold Factory -mc39asica | How to Start a Plastic Cup Manufacturing Company | Sandblasting Tank Design | I want to set up a squeegee factory | Surfboard Manufacturing Business Plan | How to Set Up a Post Company | Wet Wipe Manufacturing | Aluminum Recycling Factory | Gas Cylinder Factory Telephone | How Many Square Meters to Set Up a Clinical Pathology Laboratory | Mold on Parmesan Cheese | Laundry Work | Material for Revitalization | Production of Canned Quail Eggs | Standard Operating Procedure Manuals for Hospital Cleaning | LPG Resale Station Dwg File | Hydroponic Shed | Condominium Management Business Plans | Office Layout Flowchart Project | Framing Workshop Equipment | Cleaning Flowchart | How to Make Isotonic | Bread Processing Flowchart Of Shape Type | Open Host Factory | Fruit Industry Floor Plan | Rice Flour Mill | Examples of Flowcharts in the Orange Industry | How to Set Up a Dog Boarding Project |

 

Other projects ready:

How to start Slaughterhouse for bovines slaughter and Charque - 10 animals/day - area of 200 m² (239,2 sq.yd).
Project Factory to Produce Grain Alcohol (Rice and Corn) with capacity for 1.000 liters/day.
PDF Factory Galvanoplasty with capacity for 500 Kg/day.
Plant and layout Factory to Process Canned Mushroom with capacity for 500 Kg per day.
Project Factory Fractionation and Bottling of Nail Polish Remover with capacity for 500 liters/day.
Project Slaughterhouse Swines, Caprines, Ovines with capacity for 30 animals per day.
FeasibilityFactory to Produce Frozen Fruit Pulp with capacity for 10.000 Kg/day.
Business plant Farm to Produce Quail Eggs with capacity for 5.000 Eggs per day.
Project Factory to Produce Distilled from Honey, with capacity for 2.000 liters/day.
How to start Photographic Studio with an area of 100 m2.

Project - how to start Tannery Caprine Skin with capacity to Produce 100 skins/day.