Ready project Tannery Caprine Skin with capacity to Produce 100 skins/day.

CODE - CTM-024

Ready project Tannery Caprine Skin with capacity to Produce 100 skins/day.

CODE - CTM-024


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Caprine Skin

How to start Tannery Caprine Skin with capacity to Produce 100 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Caprine Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tannery Legislation To Open | How to Start a Soap Business | Tannery Business Plan | Building Materials for Broiler Farms | Industrial Shampoo | Soap Bar Factory Project | Construction Material Layout | Oil Change Feasibility Project | Agricultural Store Project | Layout of a Retail Store | Luminaria Business Plan | Platan Low Lingerie Store | Raw Material for Chewing Gum | How to Set Up a Cleaning Products Distributor | Daycare Financial Plan | How to Set Up a Small Sewage Treatment Plant | Floor Plan for Meat Warehouse | Manufacturer of Fish Refrigeration Equipment | How Much Does It Cost to Set Up a Hospital? | How to Set Up a Garbage Incineration Company | 50kg Incinerator for Sale | Planning To Open A Motel | Lan-house-financing. | Supply of Marmitex for Companies | Gas Station Layout | Snack Bar Opening Project Template | Project D Massage Therapy Pa | Syringe Manufacturing Legislation | Synthetic Marble - Minas Gerais | Jeans Manufacturing Business Plan | Mold Factory -mc39asica | How to Start a Plastic Cup Manufacturing Company | Sandblasting Tank Design | I want to set up a squeegee factory | Surfboard Manufacturing Business Plan | How to Set Up a Post Company | Wet Wipe Manufacturing | Aluminum Recycling Factory | Gas Cylinder Factory Telephone | How Many Square Meters to Set Up a Clinical Pathology Laboratory | Mold on Parmesan Cheese | Laundry Work | Material for Revitalization | Production of Canned Quail Eggs | Standard Operating Procedure Manuals for Hospital Cleaning | LPG Resale Station Dwg File | Hydroponic Shed | Condominium Management Business Plans | Office Layout Flowchart Project | Framing Workshop Equipment | Cleaning Flowchart | How to Make Isotonic | Bread Processing Flowchart Of Shape Type | Open Host Factory | Fruit Industry Floor Plan | Rice Flour Mill | Examples of Flowcharts in the Orange Industry | How to Set Up a Dog Boarding Project |

 

Other projects ready:

How to start Factory to Produce Banana Purée with capacity for 10.000 Kg per day.
Project Factory to Produce Organic Manure with capacity for 13.000 kg/day.
PDF Factory to Produce Mate Tea and other Teas, Bottled in Cups with capacity for 1.000 liters per day.
Plant and layout Industry to Produce Footwear with capacity for 1.000 pairs/day.
Project Slaughterhouse Newborn Male Calves with capacity to Slaughter 10 animals/day.
Project Factory to Produce Lollipops, Caramels, Hard Candies, Creams and Fondant, Ice Cream Syrup, Gums and Jell-O, Chewable Candies and Candy Bars with capacity for 5.000 Kg/day.
FeasibilityCold Storage Room to Produce and Dry Shark Fin and Fishes Swim Bladder with capacity to Produce 500 Kg/day.
Business plant Factory to Produce Confecção with capacity for Production de 50 Kg/day.
Project Factory to Produce Vinegar made from Honey with capacity for 500 liters/day.
How to start Factory for Matutinal Cereal production with 250m² (299 sq.yd.) area and capacity of 1.500 kg/day.

Project - how to start Tannery Caprine Skin with capacity to Produce 100 skins/day.