Ready project Tannery Frog Skin with capacity to Produce 1.000 skins/day.

CODE - CTM-046

Ready project Tannery Frog Skin with capacity to Produce 1.000 skins/day.

CODE - CTM-046


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Frog Skin

How to start Tannery Frog Skin with capacity to Produce 1.000 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Frog Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Warehouse Floor Plan Project | Lipstick Production Process | Material Suggestions for Mounting Hardware | Car Battery Store Name Ideas | Set Up a 3D Perfume Shop | Legislation for Supplement Stores | Home Appliance Store Projects | Model Made From A Clothing And Accessories Store Project | Work Flowchart | What You Need to Set Up a Compounding Pharmacy | Plastic Recycling Layout | How to Set Up a Drawing School | Equipment List for a Grooming and Leather Session | How to Set Up a Partnership Company | How to Run a Radiology Clinic | Central Sterile Materials Dwg Project | Industrial Floor Plan Example | Equipment for assembling lottery houses | Rooms Hotel Dwg | How to Drive a Snack Bar | 200 Square Meter House Designs | Equine Therapy Center Plant | Set Up Fire Extinguisher Store | Plants That Make Objects | Transfer - How to Make or Make | Shoe Factory Organizational Chart Templates | Glove Factory How to Set Up | How to Set Up a Lumberyard | Bndes Block Factory | Setting Up a Solar Energy Company in Brazil | Business Plan for a Paper Recycling Industry Ready | Aluminum Lunch Box Machines | Pop Pathology Laboratory | Feasibility Project for Minas Cheese Dairy | Legislation Workshop Bodywork Painting | Church Building Project Template | Pharmacy Standard Procedure Template | Ppho Manual | Vinyl Pool Plants | Silkscreen Projects | How to Set Up an Electrical Services Company | Fish Feed Factory | How to Store Bread | How Breakfast Cereals Are Made | Buy Garlic Paste | How to Develop a Banana Jam Business Plan | Business Plan for Shampoo Manufacturer |

 

Other projects ready:

How to start Industry Mineral Water Bottling with capacity for 20.000 liters/hour, in flagons of 20 liters.
Project Slaughterhouse Quails with capacity for 10.000 birds per day.
PDF Factory to Produce Sealing for Plates with capacity for 1.000 Kg/day.
Plant and layout Factory to Produce Granola with capacity for 5.000 Kg per day.
Project Tanning Rabbit Skin with capacity to Produce 50 Skins/day.
Project Leather Tannery (just until Wet Blue) with capacity to Produce 750 leathers/day.
FeasibilityFactory to Produce Energy Drinks with capacity for 10.000 liters/day.
Business plant Brewery with Bar, Restaurant and Brewery and Chopp Factory with capacity for 300 liters/day.
Project Milk and Dairy Industry to Produce Organic Cheese, Sweet Milk, Butter, Packed Milk production types B and C, Milk Cream, Whey Cheese with an area of 150 m2 and capacity for 5.000 liters/day.
How to start Cold Storage Room for Fresh Fish and Fish products, with area of 260 m² (310,96 sq.yd) and capacity for 3.000 kg/day.

Project - how to start Tannery Frog Skin with capacity to Produce 1.000 skins/day.