Ready project Tannery Frog Skin with capacity to Produce 500 skins/day.

CODE - CTM-044

Ready project Tannery Frog Skin with capacity to Produce 500 skins/day.

CODE - CTM-044


Project ready with:

Industry with the following sections:
Tanning Plant::
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tannery Frog Skin

How to start Tannery Frog Skin with capacity to Produce 500 skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tannery Frog Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tannery Company Layout | Cachaça Production Consulting | Country Farm Model | Model of a location for storing cleaning products in a company | Screw Shop Business | How to Set Up a Business*Oil Change | How to Set Up a Roast Chicken and Meat House | How to Set Up a Fish Market | Open Air Conditioning Store | Women's Clothing Store Layout | Purchasing Water Pipa Truck Pocos De Caldas | Daycare Finance | Boarding Tent | Meat Broth Factory In Mg | Nutritional Value of Dried Shrimp | Material Sterilization Machines | How to Set Up a Business in the Emerging Area | How to Assemble an Ambulance | Gym Business Plan | Fish and Pay Plant | Kitchen Utensils Marmitex Business | Ready Bar Business Plan | Open Snack Bar | Physical Schedule for Building Works | Projects Laboratory2fCollection Room | Floor Plan Paint Industry | Everything You Need to Open a Lingerie Factory | .leatherballs | Lining Making Machine For Sale | How to Set Up a Styrofoam Factory | Broom Company Name | Matchstick Manufacturing | Mortar Industry Project | Materials for Making Boxes | Machines for assembling metalwork | How to Set Up a Plastic Products Industry | Analysis Laboratory Layout | Grated Cheese Manufacturers | Equipment Manual Template | Drawing for rubber shop | How Smoked Quail Eggs Are Made | Pop- Standard Operating Procedure- Hospital | What Documents Are Required for a Gas Distributor? | Barber Shop Equipment Supplier | How to Set Up a Commercial Representation Office | Accounting Room Layout | Equipment for Setting Up a Steel Sheet Cutting Company | Security Guard Company Project | Construction of Pig Finishing Sheds | Fabrica De Massa De Pastel Cuaba | How to Start a Garlic Bread Business | Layout of the instant coffee industry | Rolled Oat Machine | Juice Powder Suppliers | Prices of hotels for dogs in Poços de Caldas |

 

Other projects ready:

How to start Slaughterhouse for Swine - 75 animals/day - area of 800 m² (956,8 sq.yd).
Project Small Factory to Produce Cashew Nut with capacity for 1.000 Kg/day.
PDF Slaughterhouse Bovines with capacity to Slaughter 700 animals/day.
Plant and layout Factory to Produce Vinegar made from Apple with capacity for 1.000 liters/day.
Project Industry Phytotherapical Products and Food Supplements with an area of 2.500 m².
Project Slaughterhouse Bovines and Swines with capacity to Slaughter 800 animals/day.
FeasibilityClothing Industry to Produce Denim Blouse with capacity for 500 garments/day.
Business plant Swine Farm (with Overlapping Bed) with capacity to Produce 224 Matrix.
Project Factory to Produce Vinegar made from Apple with capacity for 3.000 liters/day.
How to start Drink Deliverer with capacity for 1.000 liters/day.

Project - how to start Tannery Frog Skin with capacity to Produce 500 skins/day.