Ready project Tanning Cattle Hides with capacity for 1.000 Hides/day.
CODE - CTM-014
Ready project Tanning Cattle Hides with capacity for 1.000 Hides/day.
CODE - CTM-014Project ready with:
Industry with the following sections:Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Cattle Hides
OPTIONAL SERVICES:
- Financial Feasibility Study of Tanning Cattle Hides with capacity for 1.000 Hides/day.
- Business plan for Tanning Cattle Hides with capacity for 1.000 Hides/day.
- 3D project of Tanning Cattle Hides with capacity for 1.000 Hides/day.
Projects with other capacities
Tanning Cattle Hides
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
What You Need to Open a Tannery | Tannery How to Open One | How to Set Up a Grain Alcohol Distillery | Ready-made Company Creation Template | How to Make a Scented Pillow | Goat Facility Floor Plan | Hydraulic Plant | Hospital Product Sales Business Plan Template | How to Set Up a Cold Cuts and Dairy Products Store | Self Service Ice Cream Shop Layout | Seedling Trading Business | Business Plan - Thrift Store | It's Difficult to Set Up a Medicine Distributor | How to Set Up Food Supply Projects for Companies | Driving School Investment Project | Beef Sausage Refrigerator | Slaughterhouse Plant | Floor Plan of a Sports Gym | How to Set Up a Nutrition Clinic | How to Open a Health Unit | How to Set Up an ICU Structure in the Municipality | Name of a company that sets up a cyber cafe | Self-service Restaurant Design | Collective Meals Budget Template | Company to Set Up Nightclubs | car wash business plan ppt | Children's Room Ready | Project Models of an Enterprise | Backpack Manufacturing Project | Clothing Factory Planning | Bndes Sewing Factory | What is the raw material used to make garbage bags? | How to Start a Sofa Factory | MDF Manufacturing Machine | Where to Buy Gondolas P Deposito Mat Constr | Form for fence post | Ready-Made Envelope Factory | Machines for Producing Aluminum Windows | Shampoo Holder In Dwg | How Much Does a Dental Prosthesis Laboratory Cost? | Ice Cream Packaging Plants | How to Set Up a Mineral Water Factory | How to Set Up a Parking Lot | Water Procedure Manual | Pop Restaurants Template | Bndes Finances Beauty Salon Equipment | How Much Does It Cost to Open a Funeral Home? | Setting Up a Van Rental Company | Ebook for Real Estate Study | Rural Area Car Wash Project | Ready-made Project Templates Audio Studio | Pig Farm Plant | Floor Plan and Flowchart of a Pasta and Noodle Factory | The Entire Stuffed Cookie Process | How to Start a Homemade Mayonnaise Business | Acai Pulp Processing | I Want to Know About Calabrian Pepper | Pet Shop Project |
Other projects ready:
How to start Mineral Water Deliverer with capacity to Produce 3.000 liters/day.
Project Farm to Produce and Slaughter Broiler Chickens with: Farm and Slaughterhouse and capacity for 3.000 Chickens per day.
PDF Dog Kennel with capacity for 50 animals per day.
Plant and layout Factory to Produce Wood Briquette with capacity for 5.000 Kg/day.
Project Factory to Produce Macaroni for Fresh and Dry Pasta with capacity for 20.000 kg/day.
Project Clothing Industry to Produce Denim Blouse with Laundry Sector (Stone Wash) with capacity for 500 garments/day.
FeasibilityRice Mill to Produce Rice Starch with capacity for 10.000 Kg/day.
Business plant Clothing Industry to Produce Shirts with capacity for 500 garments/day.
Project Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion, Body Soap with capacity for 1.000 Kg/day.
How to start Industry to Produce Soap with capacity for 1.000 Kg/day.



