Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Tanning Cattle Hides with capacity for 300 Hides/day.
CODE - CTM-011
Ready project Tanning Cattle Hides with capacity for 300 Hides/day.
CODE - CTM-011
Project ready with:
Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Cattle Hides
OPTIONAL SERVICES:
Financial Feasibility Study of Tanning Cattle Hides with capacity for 300 Hides/day.
Business plan for Tanning Cattle Hides with capacity for 300 Hides/day.
3D project of Tanning Cattle Hides with capacity for 300 Hides/day.
Projects with other capacities
Tanning Cattle Hides
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Ready-made Stretching Works
|
Project Model Approved by BNDES
|
Names of Bovine Tanneries in Brazil
|
Cattle Final Finishing
|
Ready-to-Financing Project Models via BNDES
|
Tannery Floor Plan
|
Corral M Odelo
|
Shampoo Industry Plant
|
Layout of a Sporting Goods Store
|
Car Rental Business Plan
|
What is the way to open a car dealership?
|
How to Set Up a Chocolate Shop
|
Jewelry Store Floor Plan
|
Wet Blue Tanning
|
Drugstore Mockup Template
|
How to Set Up a Conservatory
|
See Figorifico
|
Budget for Setting Up a Burger Shop
|
Football Stadiums - Floor Plans
|
Type 1 Operating Room
|
How Can I Open a Physiotherapy Clinic?
|
What Materials Are Used In The Room?
|
Hotel Floor Plans Models
|
Silver Supermarket Project
|
Business Plan Template for Opening a Gym
|
Set Up 3 Bowling Alleys
|
How to Make a Car Wash Dam
|
Lunchbox Budget Template
|
Products Needed to Make a Pen
|
Plant-Based Bushing Factories
|
Clothing Faction Business Plan
|
How to Make Souvenirs for Newborns
|
Pvc Glove Manufacturer
|
Partnership in the Manufacturing of Plastic Wood
|
Assemble and manufacture MDF boxes
|
Profitability of Concrete Block Factory
|
Concrete Plant Flowchart
|
What is needed to set up a cardboard factory?
|
Economic Feasibility Study of the BNDES Model
|
Projects for Mobile Pool Covers
|
Dental Prosthesis Laboratory Room Design
|
Uht Milk Flowchart Template
|
Ice Factory Floor Plan Design
|
Automotive Battery Raw Material
|
Operational Manual and Standard
|
Lab Wash Pop
|
How to Plan for Very High Truck Loads
|
What is the process of building a nursery?
|
What You Need to Open a Container Rental Company
|
Financing for Graphics
|
Speedometer Pocos De Caldas
|
Fruit Pulps for Ice Cream
|
Pizza Packaging Factory
|
Wine Business Plan
|
How to Make Peanut Eggs
|
Physical Layout of a Soy Milk Industry
|
Plant Tombs
|
Other projects ready:
How to start Factory to Produce Macaroni Rice with capacity for 10.000 Kg/day.
Project Factory to Produce Artificial Candles with capacity for 300 Kg/day.
PDF Factory to Produce Caipirinha Drink with capacity for 20.000 liters/day.
Plant and layout Factory to Produce Water Rakes with capacity for 3.000 units per day.
Project Slaughterhouse Bovines, Swines, Caprines, Ovines, Equines and Ostrich with capacity for 50 animals per day.
Project Slaughterhouse Bovines, Swines and Ovines with capacity for 30 animals per day.
FeasibilityFactory to Produce Corn Flour, Canjica (corn grits), Corn Flakes with capacity for 25.000 Kg per day
Business plant Factory for Betterment and Drying of Rice with 1.000m² (1196 sq.yd.) area and capacity of 25.000 kg/day.
Project Station of Wastewater Treatment for Slaughterhouses with until 100 animals per day.
How to start Factory to Produce Macaroni (Automatic Line) with capacity for 40.000 kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US