Ready project Tanning Cattle Hides with capacity for 300 Hides/day.

CODE - CTM-011

Ready project Tanning Cattle Hides with capacity for 300 Hides/day.

CODE - CTM-011


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Cattle Hides

How to start Tanning Cattle Hides with capacity for 300 Hides/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Cattle Hides

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Ready-made Stretching Works | Project Model Approved by BNDES | Names of Bovine Tanneries in Brazil | Cattle Final Finishing | Ready-to-Financing Project Models via BNDES | Tannery Floor Plan | Corral M Odelo | Shampoo Industry Plant | Layout of a Sporting Goods Store | Car Rental Business Plan | What is the way to open a car dealership? | How to Set Up a Chocolate Shop | Jewelry Store Floor Plan | Wet Blue Tanning | Drugstore Mockup Template | How to Set Up a Conservatory | See Figorifico | Budget for Setting Up a Burger Shop | Football Stadiums - Floor Plans | Type 1 Operating Room | How Can I Open a Physiotherapy Clinic? | What Materials Are Used In The Room? | Hotel Floor Plans Models | Silver Supermarket Project | Business Plan Template for Opening a Gym | Set Up 3 Bowling Alleys | How to Make a Car Wash Dam | Lunchbox Budget Template | Products Needed to Make a Pen | Plant-Based Bushing Factories | Clothing Faction Business Plan | How to Make Souvenirs for Newborns | Pvc Glove Manufacturer | Partnership in the Manufacturing of Plastic Wood | Assemble and manufacture MDF boxes | Profitability of Concrete Block Factory | Concrete Plant Flowchart | What is needed to set up a cardboard factory? | Economic Feasibility Study of the BNDES Model | Projects for Mobile Pool Covers | Dental Prosthesis Laboratory Room Design | Uht Milk Flowchart Template | Ice Factory Floor Plan Design | Automotive Battery Raw Material | Operational Manual and Standard | Lab Wash Pop | How to Plan for Very High Truck Loads | What is the process of building a nursery? | What You Need to Open a Container Rental Company | Financing for Graphics | Speedometer Pocos De Caldas | Fruit Pulps for Ice Cream | Pizza Packaging Factory | Wine Business Plan | How to Make Peanut Eggs | Physical Layout of a Soy Milk Industry | Plant Tombs |

 

Other projects ready:

How to start Honey Warehouse with Reception of Honey in Plastic Tanks with capacity to Produce 1.000 liters/day.
Project Factory to Produce Condensed Soy Milk with capacity for 20.000 liters/day.
PDF Factory to Produce Dry Coconut Grated with capacity for 10.000 Kg per day.
Plant and layout Cold Storage Room to Process ALIVE and Stunned Shrimps and Fresh, Frozen and Breaded Fishes and Fish Hamburguers with capacity to Produce 1.000 Kg/day.
Project Factory to Produce Ice Cream Cone with capacity for 1.000 Kg/day.
Project Factory to Produce Injected Plastic with capacity for 20.000 Kg/day.
FeasibilityFactory to Produce Pallet Fodder for Fishes, Cats and Dogs with capacity for 30.000 Kg/day.
Business plant Slaughterhouse Bovines, Swines and Equines with capacity for 500 animals per day.
Project Clothing Industry to Produce Shirts with capacity for 1.000 garments/day.
How to start Frog Meat Processing with capacity for 300 frogs per day.

Project - how to start Tanning Cattle Hides with capacity for 300 Hides/day.