Ready project Tanning Cattle Hides with capacity for 50 Hides/day.

CODE - CTM-009

Ready project Tanning Cattle Hides with capacity for 50 Hides/day.

CODE - CTM-009


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Cattle Hides

How to start Tanning Cattle Hides with capacity for 50 Hides/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Cattle Hides

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tanning Tips | Minimarket Projects | Sports Store Projects | Car Shop Floor Plan | Natural Products Store Templates | How to Set Up an Alignment Shop | Cal25c325a7ados Store Layout Template | Dyeing for Ostrich Leather | Pop Model for Manipulation | Equestrian Track Model | Buy Rabbit Slaughtering Equipment | Salami Making Machines | How to Set Up a Football Company | Model of a Veterinary Surgical Center How to Assemble | Physiotherapy Clinic Mockup Template | Setting Up A Cti | Steakhouse Organizational Chart Template | Floor Plan of a Hypermarket | Gym Locker Room Plan | Bowling Business Plan | How to Set Up a Car Wash Business | What Do I Need to Set Up a Dance Club? | Toothbrush Raw Material | Toy Factory Layout | What Kind of Machine Do You Need to Start a Faction | How to Find a Layout for a Backpack Factory | L-Shaped Partition Design | How to Make Plastic Wood | Furniture Factory Project | Concrete Building a Business Plan | Concrete Plant Assembly 120 | Open Cardboard Factory | Organizational Chart of Aluminum Cookware Factory | Fence Screen Models | Dental Laboratory Organization Chart | How to Set Up a Milk Production | Equipment for Producing Bar Ice - Prices | Battery Factory Project | Standard Operating Procedure for Shampoos | Telemarketing Training Models | Nursery Design Template | Broadcasting Organization Chart Template | Putting together a pamphlet | Truck Workshop Layout | Photo Studio Projects | Layout in Production | Project to Set Up a Cheese Bread Factory | Flow of a Wine Company | Vegetable Processing Machine | Equipment Financing Project Template | Vegetable Oil Production Layout | Cemetery Project |

 

Other projects ready:

How to start Factory to Produce Passion Fruit Juice with capacity for 5.000 liters per day.
Project Factory to Produce Extruded Fodder for Fishes, Cats and Dogs, with an area of 140 m² and capacity for 5.000 kg/day.
PDF Factory to Produce Banana Raisin with capacity for 120.000 Kg/day.
Plant and layout Factory Bean Improvement with capacity to produce 5.000 Kg per day.
Project Factory to Produce Bala de Coco (Coconut Candy) with capacity for 3.000 Kg/day.
Project Factory to Produce Liquid Chocolate with capacity for 3.000 liters por day.
FeasibilityFactory to Produce Freeze-Drying Food with capacity for 1.000 Kg/day.
Business plant Factory to Produce Ceramics with capacity for 500 units per day.
Project Factory to Produce in natura Garlic with capacity for 5.000 Kg per day.
How to start Factory to Produce Caipirinha Drink with capacity for 10.000 liters/day.

Project - how to start Tanning Cattle Hides with capacity for 50 Hides/day.