Ready project Tanning Cattle Hides with capacity for 500 Hides/day.

CODE - CTM-012

Ready project Tanning Cattle Hides with capacity for 500 Hides/day.

CODE - CTM-012


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Cattle Hides

How to start Tanning Cattle Hides with capacity for 500 Hides/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Cattle Hides

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Cattle Models | Raw Material Used In Shampoo Manufacturing | How to Set Up a Sporting Goods Store | Car Rental Business Plan Template | Car Shop Project | How to Open a Chocolate Shop | Layout of a Jewelry Store | Chicken Foot Skin | Design of a 50 m2 drugstore | How to Create a Music School | Number of Turkeys Slaughtered | Meat Boutique Business Plan | How to Make a Football Stadium in DWG | Operating Room Projects | How to Set Up a Physiotherapy Clinic | Construction Project Of An ICU | Hotel Profitability | Supermarket Floor Plan Design | Squash Court Project | Bowling Alley Suppliers | Car Wash Plant | Lunchbox Production | Set Up a Pen Production | Bushing Factory | Budget to Set Up a Faction | Clothing Store Project | Raincoat Factory | Machines for Making Wood from Plastics | MDF Box Factory | Block Production Machine Projects | Concrete Plant for Sale | Set up a cardboard packaging factory | Organizational Chart Templates for a Cookware Company | Swimming Pool and Barbecue Projects | Floor Plan - Prosthetics Laboratory | Works on Milk Dairy Products | Construction Model for an Ice Factory | Automotive Battery Assembly Machine | Pop Cosmetics Company | Clinic Hygiene Pop | Assemble Software Project | 3D Nursery Project | Container Rental as a Business | How much to invest in Grafica Rapida | Speedometer Repair Shop Addresses | Fruit Pulp Manufacturing Plant | Light Dough Business Plan | Grape Juice2c Production2c Equipment | Project for Brazil Nut Processing Industry | Bndes Investment Projects Model | What is needed to set up a cemetery? |

 

Other projects ready:

How to start Industry Mineral Water Bottling with capacity for 10.000 liters/hour, in flagons of 10 and 20 liters.
Project Clothing Industry to Produce Heavy Fabrics (Canvas) with capacity for 500 garments/day.
PDF Honey Warehouse with Reception of Honey in Plastic Tanks with capacity to Produce 10.000 liters/day.
Plant and layout Factory to Produce Freeze-Drying Food with capacity for 500 Kg/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Whey Cheese, Packed Milk types B and C, with capacity of 1000 liters/day.
Project Slaughterhouse Bovines and Swines and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) and Charque Processing with capacity to Produce 700 animals/day.
FeasibilityFactory to Produce Pepper Paste with capacity for 300 Kg/day.
Business plant Factory to Produce Fruit Juice with capacity for 3.000 liters/day.
Project Cosmetic Factory with an area of 1.050 m², to Produce Cosmetic in General, Cologne, Creams, Body Soaps, Shampoo, Hair Conditioner, Body Lotion, Deo Cologne and Fixing Gel.
How to start Cabinetmaking with capacity for 50 tons/day.

Project - how to start Tanning Cattle Hides with capacity for 500 Hides/day.