Ready project Tanning Fish Skin with capacity to Produce 5.000 skins per day.

CODE - CTM-039

Ready project Tanning Fish Skin with capacity to Produce 5.000 skins per day.

CODE - CTM-039


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Fish Skin

How to start Tanning Fish Skin with capacity to Produce 5.000 skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Fish Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Fish Business Plan | How to Set Up a Fish Tannery | How to Build a Fish Tannery | Motorcycle Parts Drawing | Oil Store Business Plan | Roasted Chicken for Resale | Necessary to set up a fish market | Indoor Plant Boutique Women's Clothing | How to Set Up a Water Company | Dwg Project for a Nursery for 300 Children | Refrigerator Ppra Model | Poultry Shredding Factory | Kani-kama processing | Floor Plan of a Sterile Materials Center | How to Build a PSF | Ambulance Company Mission | Weight Room Area | Construction of Inns | Industrial Kitchen Production Flow | Nightclub Constructions | Snack Bar Profitability | Ordinance Model for Residential Buildings | Concrete Laboratory Layout | Pdf Paint Factory Project | How to Set Up a Lingri Factory | Loom Manufacturing Projects | PET Bottle Production Flowchart | Styrofoam Block and Plate Manufacturer | Country China Guero Buy Plastic Squeegees Brooms In General | Matchstick Manufacturing Process | Mortar Industry Cad Design | Plant Bingo Card | What Equipment Is Needed to Set Up a Metalworking Shop? | Metallization in Plastics | Asphalt Laboratory Layout | How to Start Milk Production | What is Mbpf | Tire Shop How to Set One Up | Quail Egg Supplier In Es | Hospital Standard Operating Procedure | Cooking Gas Drawings | What do we need to set up a barber shop? | Set Up Representation Office | Accounting Office Scale Drawing | Equipment for Fire Extinguisher Workshop | How to Set Up a Road Passenger Transport Company | Maternity for Pigs | Pizza Dough Legislation | Garlic Bread Industry | Parboiled Rice Manufacturing | Wheat Mill Equipment | Sugarcane Financing Project Model | Dog Hotel Floor Plan |

 

Other projects ready:

How to start Slaughterhouse Horses with capacity for 100 animals per day.
Project Poultry House with capacity for 300 Broiler Breeders and Built area of 88 m².
PDF Factory T-Shirt Screen Printing with capacity for 300 garments/day.
Plant and layout Factory to Produce Chocolate Powder with capacity for 1.000 Kg/day.
Project Factory to Produce Pastry Dough with capacity for 5.000 kg/day.
Project Factory to Produce Fodder for Birds with an area of 133 m² and capacity for 5.000 kg/day.
FeasibilityFactory to Produce Candles with capacity for 3.000 Kg/day.
Business plant Slaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 100 animals/day.
Project Factory of Fodder, Mineral Salt and Protein Salt, with an area of 100 m² and capacity for 1.000 kg/day.
How to start Factory to Produce Soft Drink with capacity for 10.000 liters/day.

Project - how to start Tanning Fish Skin with capacity to Produce 5.000 skins per day.