Ready project Tanning Fish Skin with capacity to Produce 5.000 skins per day.

CODE - CTM-039

Ready project Tanning Fish Skin with capacity to Produce 5.000 skins per day.

CODE - CTM-039


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Fish Skin

How to start Tanning Fish Skin with capacity to Produce 5.000 skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Fish Skin

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Fish Business Plan | How to Build a Fish Tannery | How to Set Up a Fish Tannery | Motorcycle Parts Drawing | Oil Store Business Plan | Roasted Chicken for Resale | Necessary to set up a fish market | Indoor Plant Boutique Women's Clothing | How to Set Up a Water Company | Dwg Project for a Nursery for 300 Children | Refrigerator Ppra Model | Poultry Shredding Factory | Kani-kama processing | Floor Plan of a Sterile Materials Center | How to Build a PSF | Ambulance Company Mission | Weight Room Area | Construction of Inns | Industrial Kitchen Production Flow | Nightclub Constructions | Snack Bar Profitability | Ordinance Model for Residential Buildings | Concrete Laboratory Layout | Pdf Paint Factory Project | How to Set Up a Lingri Factory | Loom Manufacturing Projects | PET Bottle Production Flowchart | Styrofoam Block and Plate Manufacturer | Country China Guero Buy Plastic Squeegees Brooms In General | Matchstick Manufacturing Process | Mortar Industry Cad Design | Plant Bingo Card | What Equipment Is Needed to Set Up a Metalworking Shop? | Metallization in Plastics | Asphalt Laboratory Layout | How to Start Milk Production | What is Mbpf | Tire Shop How to Set One Up | Quail Egg Supplier In Es | Hospital Standard Operating Procedure | Cooking Gas Drawings | What do we need to set up a barber shop? | Set Up Representation Office | Accounting Office Scale Drawing | Equipment for Fire Extinguisher Workshop | How to Set Up a Road Passenger Transport Company | Maternity for Pigs | Pizza Dough Legislation | Garlic Bread Industry | Parboiled Rice Manufacturing | Wheat Mill Equipment | Sugarcane Financing Project Model | Dog Hotel Floor Plan |

 

Other projects ready:

How to start Tanning for Fish Skin with capacity for 1.000 skins per day and built area of 300 m².
Project Slaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 5 animals/day.
PDF Shed to Cut Glass with capacity to Produce 80 m2/day.
Plant and layout Industry to Produce Body Soap with an area of 350 m² and capacity for 5.000 kg/day.
Project Hotel (Resort) and Convention Center with 100 apartaments.
Project Factory to Produce Toilet Paper with capacity for 500 Kg/day.
FeasibilityLaboratory to Produce Products Related to Hospitals with capacity for 3.000 Kg/day.
Business plant Factory to Produce American Popcorn with capacity for 500 Kg per day.
Project Factory to Produce Confecção with capacity for Production de 200 Kg/day.
How to start Factory to Produce Dehydrated Fruits with capacity for 50 Kg/day.

Project - how to start Tanning Fish Skin with capacity to Produce 5.000 skins per day.