Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Tanning Ostrich Skin with capacity to Produce 100 Skins per day.
CODE - CTM-017
Ready project Tanning Ostrich Skin with capacity to Produce 100 Skins per day.
CODE - CTM-017
Project ready with:
Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Ostrich Skin
OPTIONAL SERVICES:
Financial Feasibility Study of Tanning Ostrich Skin with capacity to Produce 100 Skins per day.
Business plan for Tanning Ostrich Skin with capacity to Produce 100 Skins per day.
3D project of Tanning Ostrich Skin with capacity to Produce 100 Skins per day.
Projects with other capacities
Tanning Ostrich Skin
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
How a Tannery Works
|
Essence Distillery Project
|
How to Set Up an Electrical Supplies Store
|
Equipment for Setting Up an Oil Change
|
Project to Set Up a Store with Antenna Items
|
How Much Does It Cost To Open A Hot Dog Shop?
|
How to Set Up a Multi-Things Store
|
How to Open a Bedding, Bath and Kitchen Store
|
Sweet Jam Projects
|
How Much Does It Cost to Set Up a Beverage Store?
|
Recycling Company Project Template
|
Refrigerator Layouts
|
Outpatient Nursing Pop
|
Floor Plan of Radiodiagnostic Clinic
|
Dental Clinic Floor Plan
|
Motel Financing
|
Cinema Floor Plan
|
Industrial Cafeteria Layout
|
Model Plans for Gas Station Construction
|
Cc3b4co Express
|
What is the Project for a Beauty Clinic?
|
Diaper Production Process Flowchart
|
Floor Plan of Toilet Paper Factory
|
Clothing Production Flow
|
Maternity Bag Factory
|
Hawaiian Factory
|
Wholesale Hair Clips Florianópolis
|
Wood Clip Factory
|
Reed Model
|
Vibrating Slab Forming Table
|
Antennas Manufacturer
|
V Brick Factory Projects
|
Chair Enterprise
|
Analysis Laboratory Models
|
Cheese and Yogurt Supplier Requeijao
|
Laundry Financing Project
|
Mechanical Workshop Project for City Hall
|
How Is The Medicine Traceability Pop Made?
|
Rodeo Business Plan
|
A Sculptor's Studio Floor Plan
|
Equipment for Setting Up a Pest Control System
|
Feasibility of Opening an Insurance Brokerage
|
How to Set Up a Mobile Store in a Vehicle
|
Oxygen Production Flowcharts
|
Soil Cement Factory
|
How to Start a Party Candy Business
|
Tapioca Biscuit Factory Brazil
|
Name Options for Garlic Packaging Factory
|
How to Finance a Cookie Company
|
Veterinary Clinic Floor Plan
|
Other projects ready:
How to start Factory to Produce Chocolate Powder with capacity for 3.000 Kg/day.
Project Farm to Produce Quail Eggs with capacity for 500 Eggs per day.
PDF Milk and Dairy Industry for Packed Milk production types B and C, with capacity of 3000 liters/day.
Plant and layout Footwear Industry to Produce Sneakers with capacity for 100 pairs/day.
Project Factory to Produce Dog Biscuits with capacity for 1.000 Kg/day.
Project Factory to Produce Cone for Ice Cream with capacity for 5.000 kg/day.
FeasibilityCold Storage Room Dried Shrimp Processing with an area of 260 m² and capacity for 3.000 kg of Shrimps per day.
Business plant Factory to Produce Cleaning Products (Detergent, Softener, Shampoo for Cars, Desinfectant) with an area of 400 m² and capacity for 5.000 kg/day.
Project Clothing Industry to Produce Suit, Jacket and Suit Pants with capacity for 500 garments/day.
How to start Sterilization Unit (by Ethylene Oxide) with capacity for 5.000 Units per day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US