Ready project Tanning Ostrich Skin with capacity to Produce 1.000 Skins per day.

CODE - CTM-021

Ready project Tanning Ostrich Skin with capacity to Produce 1.000 Skins per day.

CODE - CTM-021


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Ostrich Skin

How to start Tanning Ostrich Skin with capacity to Produce 1.000 Skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Ostrich Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Ostrich Flowchart | Budget for Construction of Chicken Sheds | Mechanical Shed Plan | Make Lipstick | Cosmetics Store Floor Plans | Automotive Battery Store Business | Set Up Stationery Store In Neighborhood | Food Supplement Company Projects | Mattress Equipment Sale | Ready-made Business Plan for a Clothing and Accessories Store | Candy Factory Layout | Investment in Compounding Pharmacy | Ready-Made Projects for Garbage Recycling Plant | Planning Projects2c Reinforcement | 150m2 Floor Plan Project With Sections | Plan of a Socity Field | Radiology Clinic How to Set Up | Physiotherapy Clinic Floor Plan | Auditorium Equipment Project | I Want to Build a Hostel | Hotel Floor Plan Design | Example of a Project to Open a Pizzeria | Pasta House Equipment | Vehicle Wash Models Plant | I Want to Open a Coal Deposit Business | Straw Cigarette Manufacturing | Clothing Production Layout | How to Set Up and How Much Does a Shoe Factory Cost | How to Assemble Eva's Plan | Set up a Mannequin Factory | Bamboo Sheet Manufacturer | What is the raw material used in the manufacture of blocks? | Computer Factory Layout | Ready Projects About Recycling | Raw Material for Manufacturing Marmitex | Standard Operating Procedure Dietetic Technique Laboratory | What is needed to open a cheese factory? | How to Set Up an Auto Workshop | Ready-Made Library Business Plan | Pop Template for Controlled Drug Disposal | Sugar Packaging Project | How to Start a Jewelry Production Company | Modeling and Mannequin Agency Project | Open Construction Company | How to Make a Screen Printing Project | Septic Tank Models2fplants | Mineral Salt Factory Pop Models | Ice Cream Shop Layout | Bread Making Machine | Soy Milk Factory | Ready-Made Factory Layouts | Production of tamales | Bean Sprout Processing | Organizational Chart Templates - Aesthetics |

 

Other projects ready:

How to start Public Medical Clinic with an area of 3.000 m2.
Project Factory to Produce Chocolate Powder with capacity for 20.000 Kg/day.
PDF Factory to Produce Coconut Water with Ultraviolet Sterilization with capacity for 500 liters/day.
Plant and layout Factory to Produce Pepper Oleoresin with capacity for 5.000 Kg/day.
Project Marble and Granite Factories to Produce Cutted and Polished Stones and Marble and Granite Pieces (Sink, Counter and by Placing an Order) with capacity for 10 Blocks per Week.
Project Milk and Dairy Industry to Produce Autoclaving UHT Milk with capacity for 5.000 liters/day.
FeasibilityFactory to Produce Jerked Beef (Salted Fresh Meat), with Deboned Meat Reception, and capacity for 5.000 Kg/day.
Business plant Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 10 animals/day.
Project Factory to Produce Crackling (Torresmo), Crisps Baked Pork Meat (Pururuca), Skin Ready to Fry and Pig Lard with capacity to produce 5.000 Kg/day.
How to start Industry to Produce Liquid Soap, Liquid Body Soap, Liquid Detergent, Desinfectant, Carpet-Cleaner and Glass-Cleaner with capacity for 1.000 liters/day.

Project - how to start Tanning Ostrich Skin with capacity to Produce 1.000 Skins per day.