Ready project Tanning Ostrich Skin with capacity to Produce 2.000 Skins per day.

CODE - CTM-022

Ready project Tanning Ostrich Skin with capacity to Produce 2.000 Skins per day.

CODE - CTM-022


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Ostrich Skin

How to start Tanning Ostrich Skin with capacity to Produce 2.000 Skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Ostrich Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

A Ready-Made Financing Project | How Cotton Swabs Are Made | How to Set Up an Electrical Shop | Facade of a lubricant store | How to Set Up a Satellite Dish Factory | Snack Bar Loan Project Model | I Want to Set Up a Multi-Things Store | How to Set Up a Bed, Table, and Bath Store | Sweets Jam Project | I Want to Open a Beverage Distributor | Tire Production Plan | I Want to Set Up a College | Cost of Setting Up a Butcher Shop | Cattle and Goat Stunning Equipment | Standard Operating Procedure Outpatient Reception | Floor Plan of a Radiology Clinic | Clinic Construction Plan | Investment Open Motel | Ready Projects About Cinama | What do I need to set up a kitchen for 100 lunch boxes? | Station Project Template | How to Set Up a Coconut Shop | Floor Plan Beauty Center | Industry that manufactures diapers and absorbent pads | Paper Industry Project | Starting a T-Shirt Business | How to Start Selling Fabric Bags | Havaianas Factory Layout | How to Make Piranha for Hair | Clothes Peg Manufacturing | How to Make a Pool Table | Vibrating Table for Precast Slab | Antenna Industries | Investment in Artificial Sand Production | Silver Chair Industry | Laboratory Reseption Models | Investment Project Model for BNDES | Car Wash Project | Mechanical Workshop Project | How to Design Rodeo Projects | Set up a Sculpture Studio | Pest Control Establishments Model | How to Set Up a Dispatch Office in SP | Mobile Workshop Model | Project to Create a Machinery Rental Company | Construction Model for Feed Factory | Tiles with Cement Soil | Ebook How to Set Up a Snack Factory | Tapioca Biscuit Industry | How to Register Preserves | Floor Plan of a Veterinary Clinic and Pet Shop |

 

Other projects ready:

How to start Marble and Granite Factories to Produce Cutted and Polished Stones, Marble and Granite Pieces (Sink, Counter and by Placing an Order) and to Cut Marble and Granite Floors with capacity for 8 Blocks per Week.
Project Clothing Industry to Produce Knitwear and Sweatshirts with capacity for 500 garments/day.
PDF Factory to Produce Guaraná Syrup with capacity for 500 liters/day.
Plant and layout Factory to Produce dand White Wine (Prosecco) of Honey with capacity for 10.000 liters/day.
Project Municipal Market with capacity for 70 box.
Project Factory Glass Recycling with capacity for 500 Kg/day.
FeasibilityFactory to Produce Cotton Yarn Bandage (not Sterilized) with capacity for 10.000 bandages per day.
Business plant Factory to Produce Cotton Yarn Bandage (not Sterilized) with capacity for 50.000 bandages per day.
Project Factory to Produce Extruded Fodder for Fishes, Cats and Dogs with capacity for 30.000 Kg/day.
How to start Rehabilitation Unit (Physiotherapy) with an area of 350 m².

Project - how to start Tanning Ostrich Skin with capacity to Produce 2.000 Skins per day.