Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Tanning Ostrich Skin with capacity to Produce 300 Skins per day.
CODE - CTM-018
Ready project Tanning Ostrich Skin with capacity to Produce 300 Skins per day.
CODE - CTM-018
Project ready with:
Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Ostrich Skin
OPTIONAL SERVICES:
Financial Feasibility Study of Tanning Ostrich Skin with capacity to Produce 300 Skins per day.
Business plan for Tanning Ostrich Skin with capacity to Produce 300 Skins per day.
3D project of Tanning Ostrich Skin with capacity to Produce 300 Skins per day.
Projects with other capacities
Tanning Ostrich Skin
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Cad Tannery Plant
|
Ostrich Tannery
|
Models on Skins
|
Tannery
|
Tannery Company In Cic
|
Central Tannery Plant
|
Cosmetics Industry Set-up Project
|
Capril Project
|
Equipment for Setting Up a Pet Food Store
|
Business Plan Already Assembled on Motorcycle Parts
|
Chicken Resale
|
Fish Market Feasibility Study
|
Blinds Making Machines
|
Belly Dance Clothing Resale
|
Flowchart of How to Set Up a Company
|
Basket Assembly
|
How to Set Up a Senior Daycare
|
Moms For Male Calves
|
Frozen Snacks Machine Manufacturers
|
Pork Sausage Course CD
|
Maternity Ward Plan
|
Psf Dentistry Material List
|
How to Open a Beer Emergency Room
|
Financing for the Construction of Inns
|
How to Set Up a Pay-Per-Weight Restaurant Project
|
Ready Nightclub Project
|
How to Make Projects for a Car Wash
|
How to Put Together an Art Project
|
Reception Of A Pill Industry
|
Retreading Project
|
Printing Production Layout
|
Glove Making Machines
|
Mini Mineral Water Factory
|
Name for a Business with Mirrors
|
How to Set Up a Plastic Toy Factory
|
Wooden Kayak Plant
|
Metal Fireplace - Cad
|
Viability of Sugarcane Bagasse Paper
|
How to Set Up a Key Making Shop
|
Set up Machining Industry
|
Necessary Documentation to Open a Dental Prosthesis Laboratory
|
How to Build a Milk Factory Model
|
Step by Step Guide to Good Food Practices Manual
|
Tire Repair Price List
|
Download Pop Drugstore
|
Nutrition Standard Operating Procedure Template
|
Budget to Set Up a Photography Studio
|
Project for Opening a Manicure Shop
|
Organizational Chart of a Motorcycle Dealership
|
Ready Work Ready Products In Accounting
|
Fire Extinguisher Refilling Machine
|
Farm Consulting
|
English Cake Equipment
|
How to Set Up a Natural Snack Company
|
Camp Grated Coconut
|
Business Plan3a Grain Storage
|
Leather Bone Factory
|
Other projects ready:
How to start Factory to Produce Ice Lolly Stick with capacity for 1.000 Kg/day.
Project Factory to Produce Concrete Lamppost with capacity for 1.000 units/day.
PDF Factory to Produce Wine and Sparkling Wine, with capacity for 20.000 liters/year.
Plant and layout Factory Improvement of Vegetables (lettuce, acelga (swiss chard), borecole, cabbage, carrot, beetroot, cucumber, beans-string bean, cauliflower and broccoli) with capacity to produce 1.000 Kg per day.
Project Factory to Produce Tomato Extract and Tomato Pulp with capacity for 500 Kg per day.
Project Factory to Produce Cocada (coconut candy) with capacity for 3.000 Kg/day.
FeasibilityFactory to Produce Chewable Candies and Candy bars with capacity for 5.000 Kg/day.
Business plant Medical Clinic with 3 Doctor`s Offices.
Project Factory to Produce Pierced Bricks with capacity for 3.000 units per day.
How to start Milk and Dairy Industry to Produce Autoclaving UHT Milk with capacity for 5.000 liters/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US