Ready project Tanning Ostrich Skin with capacity to Produce 300 Skins per day.

CODE - CTM-018

Ready project Tanning Ostrich Skin with capacity to Produce 300 Skins per day.

CODE - CTM-018


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Ostrich Skin

How to start Tanning Ostrich Skin with capacity to Produce 300 Skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Ostrich Skin

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tannery Company In Cic | Central Tannery Plant | Ostrich Tannery | Cad Tannery Plant | Models on Skins | Tannery | Cosmetics Industry Set-up Project | Capril Project | Equipment for Setting Up a Pet Food Store | Business Plan Already Assembled on Motorcycle Parts | Chicken Resale | Fish Market Feasibility Study | Blinds Making Machines | Belly Dance Clothing Resale | Flowchart of How to Set Up a Company | Basket Assembly | How to Set Up a Senior Daycare | Moms For Male Calves | Frozen Snacks Machine Manufacturers | Pork Sausage Course CD | Maternity Ward Plan | Psf Dentistry Material List | How to Open a Beer Emergency Room | Financing for the Construction of Inns | How to Set Up a Pay-Per-Weight Restaurant Project | Ready Nightclub Project | How to Make Projects for a Car Wash | How to Put Together an Art Project | Reception Of A Pill Industry | Retreading Project | Printing Production Layout | Glove Making Machines | Mini Mineral Water Factory | Name for a Business with Mirrors | How to Set Up a Plastic Toy Factory | Wooden Kayak Plant | Metal Fireplace - Cad | Viability of Sugarcane Bagasse Paper | How to Set Up a Key Making Shop | Set up Machining Industry | Necessary Documentation to Open a Dental Prosthesis Laboratory | How to Build a Milk Factory Model | Step by Step Guide to Good Food Practices Manual | Tire Repair Price List | Download Pop Drugstore | Nutrition Standard Operating Procedure Template | Budget to Set Up a Photography Studio | Project for Opening a Manicure Shop | Organizational Chart of a Motorcycle Dealership | Ready Work Ready Products In Accounting | Fire Extinguisher Refilling Machine | Farm Consulting | English Cake Equipment | How to Set Up a Natural Snack Company | Camp Grated Coconut | Business Plan3a Grain Storage | Leather Bone Factory |

 

Other projects ready:

How to start Factory to Produce Extruded Fodder for Fishes, Cats and Dogs with capacity for 30.000 Kg/day.
Project Domestic Breeding of Ostrich (Struthioculture) - Nursery, Day Care, Fattening, Reproduction (This Project doesn`t contain Slaughterhouse, Incubator and Tannery).
PDF Factory Extration and Drying of Brazil Nut (Castanha-do-Pará) with capacity to produce 3.000 Kg per day.
Plant and layout Factory to Produce Wine, with capacity for 500.000 liters/year.
Project Factory to Produce Unwoven Chicken with capacity for 5.000 Kg/day.
Project Factory to Produce Fodder from Sisal Fibers with capacity for 500 Kg/day.
FeasibilityFactory to Produce Bran Fodder for Fishes, Cats and Dogs with capacity for 20.000 Kg/day.
Business plant Tattersall (for Rodeo) with capacity for 1.000 people.
Project Bakery to Produce Dog Products (Panetoni, Cookie, Cracker, etc) with an area of 500 m2.
How to start Sterilization Unit (by Ethylene Oxide) with capacity for 250.000 Units per day.

Project - how to start Tanning Ostrich Skin with capacity to Produce 300 Skins per day.