Ready project Tanning Ostrich Skin with capacity to Produce 50 Skins per day.
CODE - CTM-016
Ready project Tanning Ostrich Skin with capacity to Produce 50 Skins per day.
CODE - CTM-016Project ready with:
Industry with the following sections:Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Ostrich Skin
OPTIONAL SERVICES:
- Financial Feasibility Study of Tanning Ostrich Skin with capacity to Produce 50 Skins per day.
- Business plan for Tanning Ostrich Skin with capacity to Produce 50 Skins per day.
- 3D project of Tanning Ostrich Skin with capacity to Produce 50 Skins per day.
Projects with other capacities
Tanning Ostrich Skin
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
| Sheep Milking Parlor | How to Set Up a Pet Food Store | Selling Motorcycle Parts Store | How Much Does It Cost to Set Up a Roast Chicken Store? | How to Assemble a Fish Cold Storage Room | What is the investment to open a blinds installation company? | Children's Accessories Store Project | How to Make a Medication Flowchart | What do I need to put together a basic food basket? | Floor Plan of a Senior Citizens' Community Center | What Is Done With Male Calves In Slaughterhouses | How to Create a Business Plan - Frozen Snacks | Sausage Shop Floor Plan | Parturient Reception Area | PSF Schedule Template | All the Equipment to Assemble an Ambulance | Gym Floor Plan | Projects for 10-bedroom guesthouses | School Kitchen Layout Project | Design of a bar | How to Set Up a Car Wash | Model About Cement Arts | What It Takes to Make Tablets | Setting Up a Tire Retreading Plant | Lingerie Layout Templates | Cafe Flowchart | Mini Factory | Equipment Needed for Makeup Making | Wooden Toy to Build | Kayak Factories Santa Catarina | Prefabricated Fireplace Models2fpoa | Sugarcane Bagaco Consulting | Aluminum Finishing Machine | Example of an Organizational Chart for a Company with 20 Employees | Dental Prosthesis Laboratory Price List | Producing Milk Powder | Ready Manual Model | How Much Does It Cost to Set Up a Modern Tire Shop? | Egg Technology | Pop Nutrition Model | I Want to Open a Photography Studio | What You Need to Set Up a Manicure Room | Motorcycle Shop Layout | Accounting Office Plans | Fire Extinguisher Recharging Workshop for Sale | Flowchart of a Kiosk | Tips for Building a Pig Shed | Technology in Cereal Manufacturing | Sandwich Shop Organization Chart | Mushroom Factory | Grain Silo Size Floor Plan | Bone Production with Leather Scraps |
Other projects ready:
How to start Installations for Mushroom Cultivation (Champignon) with capacity for 5.000 Kg per day.
Project Factory to Produce Artificial Candles with capacity for 100 Kg/day.
PDF Industry to Produce Soap Powder Pressed in a Bar with capacity for 1.000 Kg/day.
Plant and layout Slaughterhouse Caprines with capacity to Slaughter 700 animals/day.
Project Milk and Dairy Industry to be built in 2 phases: 1st Phase: Organic Cheese Factory to Produce Fresh Cheese (Ricota, Muzzarela, Minas Frescal), Matured Cheese (Prato, Minas Standard, Cobocó) and Parmesan Cheese, with an area of 178 m2 and capacity for 4.000 liters/day. 2nd Phase: Amplification to Produce Yoghurt and Milky Beverages, with total area of 216 m2 and capacity for 6.000 liters/day.
Project Confectionery with capacity for 3.000 Kg/day.
FeasibilityMarble and Granite Factories to Produce Cutted and Polished Stones and to Cut Marble and Granite Floors with capacity for 8 Blocks per Week.
Business plant Factory to put Cachaça (Liquor) in bottles, with capacity for 2.000 liters/day.
Project Factory to Produce Powder Soup with capacity for 1.000 Kg/day.
How to start Industrial Kitchen with Restaurant with capacity for 300 meals per day.



