Ready project Tanning Ostrich Skin with capacity to Produce 50 Skins per day.

CODE - CTM-016

Ready project Tanning Ostrich Skin with capacity to Produce 50 Skins per day.

CODE - CTM-016


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Ostrich Skin

How to start Tanning Ostrich Skin with capacity to Produce 50 Skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Ostrich Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Sheep Milking Parlor | How to Set Up a Pet Food Store | Selling Motorcycle Parts Store | How Much Does It Cost to Set Up a Roast Chicken Store? | How to Assemble a Fish Cold Storage Room | What is the investment to open a blinds installation company? | Children's Accessories Store Project | How to Make a Medication Flowchart | What do I need to put together a basic food basket? | Floor Plan of a Senior Citizens' Community Center | What Is Done With Male Calves In Slaughterhouses | How to Create a Business Plan - Frozen Snacks | Sausage Shop Floor Plan | Parturient Reception Area | PSF Schedule Template | All the Equipment to Assemble an Ambulance | Gym Floor Plan | Projects for 10-bedroom guesthouses | School Kitchen Layout Project | Design of a bar | How to Set Up a Car Wash | Model About Cement Arts | What It Takes to Make Tablets | Setting Up a Tire Retreading Plant | Lingerie Layout Templates | Cafe Flowchart | Mini Factory | Equipment Needed for Makeup Making | Wooden Toy to Build | Kayak Factories Santa Catarina | Prefabricated Fireplace Models2fpoa | Sugarcane Bagaco Consulting | Aluminum Finishing Machine | Example of an Organizational Chart for a Company with 20 Employees | Dental Prosthesis Laboratory Price List | Producing Milk Powder | Ready Manual Model | How Much Does It Cost to Set Up a Modern Tire Shop? | Egg Technology | Pop Nutrition Model | I Want to Open a Photography Studio | What You Need to Set Up a Manicure Room | Motorcycle Shop Layout | Accounting Office Plans | Fire Extinguisher Recharging Workshop for Sale | Flowchart of a Kiosk | Tips for Building a Pig Shed | Technology in Cereal Manufacturing | Sandwich Shop Organization Chart | Mushroom Factory | Grain Silo Size Floor Plan | Bone Production with Leather Scraps |

 

Other projects ready:

How to start Meat, Cold Meat and Colds Deliverer with capacity for 10.000 kg/day.
Project Factory to Produce Corn Flour, Corn Flakes and Corn for Canjica with capacity for 8.000 Kg per day.
PDF Factory to Produce Broom Handle, Broom and Water Rakes (Complete) with capacity for 1.000 units per day.
Plant and layout Tanning Ovine Skin with capacity to Produce 100 skins per day.
Project Stamping Iron with capacity for 30 tons per day.
Project Industry to Produce Hydrated Alcohol to be used in Hospitals with capacity for 500 liters/day.
FeasibilityFactory to Produce Cocada (coconut candy) with capacity for 5.000 Kg/day.
Business plant Factory to Produce Vinegar made from Banana with capacity for 100 liters/day.
Project Factory to Produce Pies with capacity for 100 Kg/day.
How to start Milk and Dairy Industry for Milk Packaging, with 95 m2 (113,62 sq.yd.) area and capacity for 4000 liters/day.

Project - how to start Tanning Ostrich Skin with capacity to Produce 50 Skins per day.