Ready project Tanning Ostrich Skin with capacity to Produce 750 Skins per day.

CODE - CTM-020

Ready project Tanning Ostrich Skin with capacity to Produce 750 Skins per day.

CODE - CTM-020


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Ostrich Skin

How to start Tanning Ostrich Skin with capacity to Produce 750 Skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Ostrich Skin

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Ostrich Tannery | Mounting an Ostrich Costume | Dyeing for Ostrich Leather | Floor Plan of a Ten-Cow Corral | Hair Cream Making Machine | Projects for Mini-markets | Aquatics Store | Vehicle Dealership Flowchart Template | Natural Products Store Models | Shoe Store Design Template | Goat Production Flowchart | Pharmacy Assembly Model | Set Up Equestrian Track Design | Equipment for Rabbit Slaughterhouses | What You Need to Set Up a Salami Factory | Football Field Drawing | Model Surgical Center Room | Physiotherapy Clinic Project | What is Uti and Cti | Restaurant and Steakhouse Floor Plan Template | Supermarket Building Floor Plan | *Tennis Academy Business Plan* | Bowling Business Plan | Equipment for Setting Up a Car Wash | Dance Club Business Plan | Raw Material for Toothbrush | What Do I Need to Open an Educational Toy Company? | How to Set Up a Lingerie Business | Bags and Accessories Business | Machines for manufacturing PVC laminates | How to Start Plastic Wood Manufacturing | Furniture Factory Project | Concrete Block Factory In Business Plan | Set Up a Concrete Company | Cardboard Boxes With Setting Up A Factory | Cookware From A Nutritional Factory | Prices of Ready-Made Chain Link Fences | Entrepreneurship in a Prosthesis Laboratory | E2fou Process Layout Diagram In Dairy Industry | Flake Ice Factory | Battery Factory | Ready Operating Procedure | Pop Model Clinical Laboratory Standard Operating Procedure | Floor Plan of a Telemarketing Office | Seedling Nursery Project Template | Internet Provider Budget Template | Ice Cream Shop Flyer Templates | Toilet Truck in the Trunk | How to Make Project2c Funding for a Photography Studio | Ice Cream Making Machines | Cold Room for Cheese Bread Dough | Process Flowcharts of a Wine Industry | Greenery Development | Guarana Processing | Set up a soybean oil refining plant | Cemetery Open |

 

Other projects ready:

How to start Factory to Produce Mayonnaise with capacity for 10.000 Kg per day.
Project Wood Chips and Sawdust with capacity for 25 tons/day.
PDF Factory to Produce Extruded Fodder for Fishes, Cats and Dogs with capacity for 2.000 Kg/day.
Plant and layout Factory to Produce Essential Oils (Mint Leaf, Eucalyptus Leaf, etc.) with capacity for 500 liters/day.
Project Factory to Produce Macaroni for Fresh and Dry Pasta with capacity for 500 kg/day.
Project Meat, Cold Meat and Colds Deliverer with capacity for 3.000 kg/day.
FeasibilitySlaughterhouse Quail with capacity for 1.000 animals per day.
Business plant Family Health Program with an area of 3.500 m2.
Project Public Medical Clinic with an area of 300 m2.
How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Whey Cheese, Butter, with capacity of 3000 liters/day.

Project - how to start Tanning Ostrich Skin with capacity to Produce 750 Skins per day.