Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
CODE - CTM-020
Ready project Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
CODE - CTM-020
Project ready with:
Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Ostrich Skin
OPTIONAL SERVICES:
Financial Feasibility Study of Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
Business plan for Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
3D project of Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
Projects with other capacities
Tanning Ostrich Skin
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Dyeing for Ostrich Leather
|
Ostrich Tannery
|
Mounting an Ostrich Costume
|
Floor Plan of a Ten-Cow Corral
|
Hair Cream Making Machine
|
Projects for Mini-markets
|
Aquatics Store
|
Vehicle Dealership Flowchart Template
|
Natural Products Store Models
|
Shoe Store Design Template
|
Goat Production Flowchart
|
Pharmacy Assembly Model
|
Set Up Equestrian Track Design
|
Equipment for Rabbit Slaughterhouses
|
What You Need to Set Up a Salami Factory
|
Football Field Drawing
|
Model Surgical Center Room
|
Physiotherapy Clinic Project
|
What is Uti and Cti
|
Restaurant and Steakhouse Floor Plan Template
|
Supermarket Building Floor Plan
|
*Tennis Academy Business Plan*
|
Bowling Business Plan
|
Equipment for Setting Up a Car Wash
|
Dance Club Business Plan
|
Raw Material for Toothbrush
|
What Do I Need to Open an Educational Toy Company?
|
How to Set Up a Lingerie Business
|
Bags and Accessories Business
|
Machines for manufacturing PVC laminates
|
How to Start Plastic Wood Manufacturing
|
Furniture Factory Project
|
Concrete Block Factory In Business Plan
|
Set Up a Concrete Company
|
Cardboard Boxes With Setting Up A Factory
|
Cookware From A Nutritional Factory
|
Prices of Ready-Made Chain Link Fences
|
Entrepreneurship in a Prosthesis Laboratory
|
E2fou Process Layout Diagram In Dairy Industry
|
Flake Ice Factory
|
Battery Factory
|
Ready Operating Procedure
|
Pop Model Clinical Laboratory Standard Operating Procedure
|
Floor Plan of a Telemarketing Office
|
Seedling Nursery Project Template
|
Internet Provider Budget Template
|
Ice Cream Shop Flyer Templates
|
Toilet Truck in the Trunk
|
How to Make Project2c Funding for a Photography Studio
|
Ice Cream Making Machines
|
Cold Room for Cheese Bread Dough
|
Process Flowcharts of a Wine Industry
|
Greenery Development
|
Guarana Processing
|
Set up a soybean oil refining plant
|
Cemetery Open
|
Other projects ready:
How to start Factory to Produce Fodder in Cans for Dogs and Cats with capacity for 500 Kg/day.
Project Cachaça (Liquor) and Brandy Bi-Distillary, with capacity of production for 2.000 liters/day.
PDF Industry Mineral Water Bottling with capacity for 10.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups with a machine to make PET Bottles.
Plant and layout Factory to Produce Confecção with capacity for Production de 300 Kg/day.
Project Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion with capacity for 1.000 Kg/day.
Project Factory to Produce Powder Hair Dye with capacity for 500 Kg/day.
FeasibilityIndustry of Ice Production in bars, grated and in cubes with capacity for 20.000 Kg/day.
Business plant Clothing Industry to Produce Leather Clothes with capacity for 500 garments/day.
Project Factory to Produce Chewable Candies and Candy bars with capacity for 1.000 Kg/day.
How to start Factory to Produce Fresh Dough for Pizza and setting up for Pizza (Filled and Frozen) with capacity for 20.000 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US