Ready project Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
CODE - CTM-020
Ready project Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
CODE - CTM-020Project ready with:
Industry with the following sections:Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Ostrich Skin
OPTIONAL SERVICES:
- Financial Feasibility Study of Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
- Business plan for Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
- 3D project of Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
Projects with other capacities
Tanning Ostrich Skin
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Dyeing for Ostrich Leather | Ostrich Tannery | Mounting an Ostrich Costume | Floor Plan of a Ten-Cow Corral | Hair Cream Making Machine | Projects for Mini-markets | Aquatics Store | Vehicle Dealership Flowchart Template | Natural Products Store Models | Shoe Store Design Template | Goat Production Flowchart | Pharmacy Assembly Model | Set Up Equestrian Track Design | Equipment for Rabbit Slaughterhouses | What You Need to Set Up a Salami Factory | Football Field Drawing | Model Surgical Center Room | Physiotherapy Clinic Project | What is Uti and Cti | Restaurant and Steakhouse Floor Plan Template | Supermarket Building Floor Plan | *Tennis Academy Business Plan* | Bowling Business Plan | Equipment for Setting Up a Car Wash | Dance Club Business Plan | Raw Material for Toothbrush | What Do I Need to Open an Educational Toy Company? | How to Set Up a Lingerie Business | Bags and Accessories Business | Machines for manufacturing PVC laminates | How to Start Plastic Wood Manufacturing | Furniture Factory Project | Concrete Block Factory In Business Plan | Set Up a Concrete Company | Cardboard Boxes With Setting Up A Factory | Cookware From A Nutritional Factory | Prices of Ready-Made Chain Link Fences | Entrepreneurship in a Prosthesis Laboratory | E2fou Process Layout Diagram In Dairy Industry | Flake Ice Factory | Battery Factory | Ready Operating Procedure | Pop Model Clinical Laboratory Standard Operating Procedure | Floor Plan of a Telemarketing Office | Seedling Nursery Project Template | Internet Provider Budget Template | Ice Cream Shop Flyer Templates | Toilet Truck in the Trunk | How to Make Project2c Funding for a Photography Studio | Ice Cream Making Machines | Cold Room for Cheese Bread Dough | Process Flowcharts of a Wine Industry | Greenery Development | Guarana Processing | Set up a soybean oil refining plant | Cemetery Open |
Other projects ready:
How to start Cachaça (Liquor) Factory, with capacity for 5.000 liters/day and a built area of 1.100 m². (To be built in a different level land).
Project Supermarket with an area of 100 m2.
PDF Factory to Produce Premolded Rock Soil with capacity for 10.000 m2/day.
Plant and layout Factory to Produce Powder Hair Dye with capacity for 100 Kg/day.
Project Factory to Produce Coconut Fiber (Coconut Shredding) with capacity for 3.000 Kg/day.
Project Factory to Produce in Natura Pepper with capacity for 3.000 Kg/day.
FeasibilitySterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 15.000 Units per day.
Business plant Factory for Chlorophyll Juice production with capacity of 500 kg/day and 200 m2 (239,2 sq.yd.) area.
Project Factory to Produce Sausages (with Carcass Reception) with capacity for 3.000 Kg/day.
How to start Factory to Produce Injected Plastic with capacity for 10.000 Kg/day.



