Ready project Tanning Ovine Skin with capacity to Produce 500 skins per day.

CODE - CTM-033

Ready project Tanning Ovine Skin with capacity to Produce 500 skins per day.

CODE - CTM-033


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Ovine Skin

How to start Tanning Ovine Skin with capacity to Produce 500 skins per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Ovine Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Sheep Skin Tanneries | Companies Raw Material for Hair Products Manufacturing | Mini Market Room Design | Sports Store Floor Plan | Dealership Floor Plan | Natural Products Stores by the Kilo | Shoe Store Layout | Tannery Machinery | P Pop Pharmacy Flowchart | How to Set Up a Rice Processing Company | How to Set Up a Horse Riding Track | The Process of Setting Up a Rabbit Slaughterhouse | Price of Cracklings Per Kilo | Layout of a Football Stadium | Manual for Assembly of Surgical Center | Physiotherapy Equipment for Setting Up a Clinic Wanted Financing | ICU Physical Plant Model | Steakhouse Consulting | Budget for Setting Up a Minimarket | Gym Locker Room Dwg Project | Bowling Alley Construction Financing | Car Wash Business Plan | Open a Dance Club | Flowchart of a Toothbrush Company | Gift Factory Business Plan Ready | Machinery for lingerie production | Organizational Chart of the Scholarship Industry | Egg Comb Factory | Floor Plan of a Plastic Wood Factory | Furniture Organization Chart | Operational Flowchart of a Concrete Plant | Golden Grass Assembly Parts | Aluminum Cookware Area Molds | How to Set Up a Small Wire Mesh Factory | Clinical Analysis Laboratory Organization Chart | Assemble a Washer | Industrial Ice Cube Factory | Floor Plan of a Parking Lot | Standard Operating Procedure 28pop29 | Model of a Pop for Clinical Analysis Laboratory | How to Set Up Telemarketing Training | I would like to set up a seedling nursery | Bndes Provider Project | How to Create a Business Plan Chart | Plant Drawings In Chests | Facade Model for Photographic Studio | Flowchart of a Small Business (Ice Cream Shop) | Layout of a Frozen Bread Distributor | Canned Corn Production | How to Make Guarana Syrup | Equipment for Soybean Oil Industry | Bakery Projects and Plants |

 

Other projects ready:

How to start Milk and Dairy Industry to Produce Autoclaving UHT Milk with capacity for 5.000 liters/day.
Project Factory to Produce Chocolate Powder with capacity for 20.000 Kg/day.
PDF Industry of Ice Production in bars and grated with capacity for 10.000 Kg/day.
Plant and layout Supermarket with an area of 100 m2.
Project Factory to Produce Wood Briquette with capacity for 10.000 Kg/day.
Project Factory to Produce Fruit Juice with capacity for 10.000 liters/day.
FeasibilityFactory for Parboilized Rice with capacity to produce 5.000 kg per hour
Business plant Factory to Produce Lollipops, Caramels, Hard Candies, Creams and Fondant, Ice Cream Syrup, Gums and Jell-O, Chewable Candies and Candy Bars with capacity for 20.000 Kg/day.
Project Factory to Produce Cotton Yarn Bandage (not Sterilized) with capacity for 10.000 bandages per day.
How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Sweet Milk, Whey Cheese, Butter, Yogurt, Milk Beverages, Packed Milk types B and C, with capacity of 8000 liters/day.

Project - how to start Tanning Ovine Skin with capacity to Produce 500 skins per day.