Ready project Tanning Rabbit Skin with capacity to Produce 50 Skins/day.

CODE - CTM-049

Ready project Tanning Rabbit Skin with capacity to Produce 50 Skins/day.

CODE - CTM-049


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Rabbit Skin

How to start Tanning Rabbit Skin with capacity to Produce 50 Skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Rabbit Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Tannery.dwg | Tannery - Rabbit | Tanning#sclient=psy-ab | Dyeing Rabbit Fur | Types of Product Layouts in Tannery | Machinery and Equipment for Tannery | Tanning Machines | Rabbit Tanning | Rabbit Skin Tannery | Tannery2c Assembly | Rabbit Fur | Business Startup Project Template | Tannery Layout Dwg | Ready Projects Dwg Template | Casa Do Mel ground floor | Ox Corral Model | Conditioner Production Costs | Sporting Goods Store Business Plan | Flowchart of a DVD Rental Company | How to Open a Car Finance Shop | Chocolate Shop Template | Financial Jewelry Store How to Set Up | Tannery Ete Project | Plant for Drugstore | How to Set Up a Music School | Horse Slaughter Refrigerator | Open a Hamburger Shop | Design Template for Changing Room in Football Field | Surgical Block Physical Plan | Physiotherapy Clinic Venture | Physical and Financial Viability | Project Inn 60 apartments | Supermarket Projects | Yoga Room Assembly | Bowling Alley Budget | Description of a Car Wash Project | Suggestions for a Lunch Box Company | Set Up Pen Factory | Machines for Processing Vegetable Loofah | Industry Reception of Raw Material Fabric | Easy Newborn Keepsake Template | Disposable Cups Factories | I want a plastic wood factory in Brazil | MDF Building Toy | How to Set Up a Concrete Block Factory | What Equipment Is Needed to Set Up a Concrete Plant and What Is the Price? | What Are the Sections of a Cardboard Box Industry? | How to Open a Plate Factory in Mg | Balcony Projects 2c Garages And Gardens | Investment in Photographic Laboratory | Equipment for Producing Milk Powder | Plastic Distributor Business Plan | Automotive Battery Assembly | Pops Model for Nursing | Laminar Flow Pop | How to Make an Organizational Chart for a Freight Transportation Company | Nursery Seedlings Equipment Budget | How to Set Up a Wedding Planning Company | How to Build a Graphic Design Quickly | Junker Repair | Draw Motorcycle Blueprints | Fruit Pulp Industry Project | Pizzeria Floor Plan Pizzeria Layout | Machines Used For Wine Making | Setting Up Peanut Factory | Soy Meat Manufacturers | Project for Private Cemetery |

 

Other projects ready:

How to start Factory to Produce Tomato Extract and Tomato Pulp with capacity for 40.000 Kg per day.
Project Cold Storage Room to Process ALIVE and Stunned Shrimps and Fresh, Frozen and Breaded Fishes and Fish Hamburguers with capacity to Produce 10.000 Kg/day.
PDF Industry to Produce Veterinary Soap with capacity for 1.000 Kg/day.
Plant and layout Factory to Produce Pequi Paste and Canned Pequi with capacity for 500 Kg per day
Project Factory to Produce Canned Vegetables (Canned Corn, Canned Pea, Canned Potato, Canned Carrot, Selection of Canned Vegetables) with capacity for 5.000 Kg per day.
Project Slaughterhouse with Mechanical Rail for Swines with capacity for 3.000 animals/day, for Deboned Meat and Special Cuts.
FeasibilityIndustrial Bakery to Produce Cakes with capacity for 500 Kg/day.
Business plant Photographic Studio with an area of 300 m2.
Project Milk and Dairy Industry for Yogurt production, Milky Beverages, with capacity of 1000 liters/day.
How to start Factory to Produce Truffles (Stuffed with Chocolate) with capacity for 500 Kg/day.

Project - how to start Tanning Rabbit Skin with capacity to Produce 50 Skins/day.