Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Tanning Rabbit Skin with capacity to Produce 50 Skins/day.
CODE - CTM-049
Ready project Tanning Rabbit Skin with capacity to Produce 50 Skins/day.
CODE - CTM-049
Project ready with:
Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Rabbit Skin
OPTIONAL SERVICES:
Financial Feasibility Study of Tanning Rabbit Skin with capacity to Produce 50 Skins/day.
Business plan for Tanning Rabbit Skin with capacity to Produce 50 Skins/day.
3D project of Tanning Rabbit Skin with capacity to Produce 50 Skins/day.
Projects with other capacities
Tanning Rabbit Skin
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Rabbit Skin Tannery
|
Rabbit Fur
|
Tanning Machines
|
Types of Product Layouts in Tannery
|
Dyeing Rabbit Fur
|
Tanning#sclient=psy-ab
|
Tannery Layout Dwg
|
Tannery2c Assembly
|
Ready Projects Dwg Template
|
Machinery and Equipment for Tannery
|
Tannery.dwg
|
Business Startup Project Template
|
Rabbit Tanning
|
Tannery - Rabbit
|
Casa Do Mel ground floor
|
Ox Corral Model
|
Conditioner Production Costs
|
Sporting Goods Store Business Plan
|
Flowchart of a DVD Rental Company
|
How to Open a Car Finance Shop
|
Chocolate Shop Template
|
Financial Jewelry Store How to Set Up
|
Tannery Ete Project
|
Plant for Drugstore
|
How to Set Up a Music School
|
Horse Slaughter Refrigerator
|
Open a Hamburger Shop
|
Design Template for Changing Room in Football Field
|
Surgical Block Physical Plan
|
Physiotherapy Clinic Venture
|
Physical and Financial Viability
|
Project Inn 60 apartments
|
Supermarket Projects
|
Yoga Room Assembly
|
Bowling Alley Budget
|
Description of a Car Wash Project
|
Suggestions for a Lunch Box Company
|
Set Up Pen Factory
|
Machines for Processing Vegetable Loofah
|
Industry Reception of Raw Material Fabric
|
Easy Newborn Keepsake Template
|
Disposable Cups Factories
|
I want a plastic wood factory in Brazil
|
MDF Building Toy
|
How to Set Up a Concrete Block Factory
|
What Equipment Is Needed to Set Up a Concrete Plant and What Is the Price?
|
What Are the Sections of a Cardboard Box Industry?
|
How to Open a Plate Factory in Mg
|
Balcony Projects 2c Garages And Gardens
|
Investment in Photographic Laboratory
|
Equipment for Producing Milk Powder
|
Plastic Distributor Business Plan
|
Automotive Battery Assembly
|
Pops Model for Nursing
|
Laminar Flow Pop
|
How to Make an Organizational Chart for a Freight Transportation Company
|
Nursery Seedlings Equipment Budget
|
How to Set Up a Wedding Planning Company
|
How to Build a Graphic Design Quickly
|
Junker Repair
|
Draw Motorcycle Blueprints
|
Fruit Pulp Industry Project
|
Pizzeria Floor Plan Pizzeria Layout
|
Machines Used For Wine Making
|
Setting Up Peanut Factory
|
Soy Meat Manufacturers
|
Project for Private Cemetery
|
Other projects ready:
How to start Clothing Industry to Produce Lingerie with capacity for 200 garments/day.
Project Tanning Rabbit Skin with capacity to Produce 1.000 Skins/day.
PDF Basic Health Unit with an area of 400 m2.
Plant and layout Factory to Produce Soft Drink with capacity for 30.000 liters/day.
Project Factory to Produce Barbecue Spit with capacity for 100 Kg/day.
Project Factory to Produce Broom Handle with capacity for 13.000 units per day.
FeasibilityMicrobrewery, with capacity for 500 liters/day.
Business plant Medical Clinic with 1 Doctor`s Office.
Project Hotel (Resort) and Convention Center with 100 apartaments.
How to start Milk and Dairy Industry to be built in 2 phases: 1st phase: Milk Packaging, with 95 m2 (113,62 sq.yd.) area and capacity for 4000 liters/day. 2nd phase: Milk Packaging, Fresh Cheeses production, Yogurt and Milky Beverage, with 200 m2 (239,2 sq.yd.) area and capacity for 8000 liters/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US