Ready project Tanning Rabbit Skin with capacity to Produce 500 Skins/day.
CODE - CTM-052
Ready project Tanning Rabbit Skin with capacity to Produce 500 Skins/day.
CODE - CTM-052Project ready with:
Industry with the following sections:Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Rabbit Skin
OPTIONAL SERVICES:
- Financial Feasibility Study of Tanning Rabbit Skin with capacity to Produce 500 Skins/day.
- Business plan for Tanning Rabbit Skin with capacity to Produce 500 Skins/day.
- 3D project of Tanning Rabbit Skin with capacity to Produce 500 Skins/day.
Projects with other capacities
Tanning Rabbit Skin
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Profitability of the Tannery Project | Cosmetic Store Floor Plan | How to Set Up a Battery Store | Stationery Business Plan | Momtar Supplement Store | Set Up Mattress Store | Clothing Store Flowcharts | Gummy Candy Making Machine | Layout of a compounding pharmacy | Floor Plan of a Recycling Industry | What It Takes to Set Up a School Tutoring Program | Municipal Project Model | Skewers Factory Equipment | Synthetic Football Court Planning | Acupuncture Clinic Model | Pop Model For Physiotherapy | Flowchart of an Event Center | Build a Hostel | How to Set Up a Holiday Camp | Snack Budget Template | Assemble House Silver | What would a car wash flowchart look like? | Packaged Coal Distributor | Cigarette Making Machines | How to Set Up a Beachwear Factory | Silicone Parts Manufacturers | Pallet Production Machine Manufacturer | Precast Industry Floor Plan | Assembling a Reactor with a Simple Lamp | Paper Bag Projects | Machine Manufacturers for Making Marmitex Packaging | How to Make Sif Cheeses | Factory for the Production of Soy Cheese | Motorhome Financing | Model Supply Center | Pharmacy Standard Operating Procedure Manual | Standard Operating Procedure for Pest Control | Keychain Design Template | Templates for Setting Up a Company | Construction Business Plan Example | Products for Setting Up a Screen Printing | Schedule for Microfilming | Frog Farm in Pará | Pop For Ice Cream Making | How to Make Industrial French Bread | Soybean Meal Factory Flow Chart | Layout of a Spice Factory | Pamonha Production Flowchart | Companies That Sell Annatto Processing Machines | Floor plan of a beauty clinic |
Other projects ready:
How to start Poultry House with capacity for 10.000 Broiler Chickens.
Project Factory to Produce Pasteurized Orange Juice with capacity for 3.000 liters per day.
PDF Factory to Produce Banana Raisin with capacity for 50.000 Kg/day.
Plant and layout Cold Storage Room to Produce Salted and Smoked Fishes and Fish Products with capacity for 40.000 Kg/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Whey Cheese, Packed Milk types B and C, with capacity of 3000 liters/day.
Project Ice Cream Parlor with an area of 500 m2.
FeasibilityFarm to Produce Quail Eggs with capacity for 500 Eggs per day.
Business plant Clothing Industry to Produce Jeans Pants with Laundry Sector (Stone Wash) with capacity for 200 garments/day.
Project Factory to Produce Tomato Extract, Tomato Pulp, Dry Tomato and Ketchup with capacity for 30.000 Kg per day.
How to start Factory to Produce Caffeine (Transform Coffee in Caffeine) with capacity for 50 liters/day.



