Ready project Tanning Rabbit Skin with capacity to Produce 500 Skins/day.

CODE - CTM-052

Ready project Tanning Rabbit Skin with capacity to Produce 500 Skins/day.

CODE - CTM-052


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Rabbit Skin

How to start Tanning Rabbit Skin with capacity to Produce 500 Skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Rabbit Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Profitability of the Tannery Project | Cosmetic Store Floor Plan | How to Set Up a Battery Store | Stationery Business Plan | Momtar Supplement Store | Set Up Mattress Store | Clothing Store Flowcharts | Gummy Candy Making Machine | Layout of a compounding pharmacy | Floor Plan of a Recycling Industry | What It Takes to Set Up a School Tutoring Program | Municipal Project Model | Skewers Factory Equipment | Synthetic Football Court Planning | Acupuncture Clinic Model | Pop Model For Physiotherapy | Flowchart of an Event Center | Build a Hostel | How to Set Up a Holiday Camp | Snack Budget Template | Assemble House Silver | What would a car wash flowchart look like? | Packaged Coal Distributor | Cigarette Making Machines | How to Set Up a Beachwear Factory | Silicone Parts Manufacturers | Pallet Production Machine Manufacturer | Precast Industry Floor Plan | Assembling a Reactor with a Simple Lamp | Paper Bag Projects | Machine Manufacturers for Making Marmitex Packaging | How to Make Sif Cheeses | Factory for the Production of Soy Cheese | Motorhome Financing | Model Supply Center | Pharmacy Standard Operating Procedure Manual | Standard Operating Procedure for Pest Control | Keychain Design Template | Templates for Setting Up a Company | Construction Business Plan Example | Products for Setting Up a Screen Printing | Schedule for Microfilming | Frog Farm in Pará | Pop For Ice Cream Making | How to Make Industrial French Bread | Soybean Meal Factory Flow Chart | Layout of a Spice Factory | Pamonha Production Flowchart | Companies That Sell Annatto Processing Machines | Floor plan of a beauty clinic |

 

Other projects ready:

How to start Factory to Produce Sparkling Wine, with capacity for 500.000 liters/year.
Project Factory to Produce Manioc (Cassava) Starch with capacity for 400 ton/day.
PDF Factory to Produce Sweet Milk produced with Milk Powder with capacity for 5.000 Kg/day.
Plant and layout Factory to Produce Mushroom Shiitake with capacity for 5.000 Kg per day.
Project Sterilization Unit (by Ethylene Oxide) with capacity for 200.000 Units per day.
Project Pastry Shop with an area of 300 m2.
FeasibilityMilk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 100.000 liters/day.
Business plant Clothing Industry to Produce Shorts with capacity for 100 garments/day.
Project Slaughterhouse Ostrich Slaughter with capacity for 50 animals/day.
How to start Factory to Produce Brooms with capacity for 10.000 units per day.

Project - how to start Tanning Rabbit Skin with capacity to Produce 500 Skins/day.