Ready project Tanning Rabbit Skin with capacity to Produce 5.000 Skins/day.

CODE - CTM-056

Ready project Tanning Rabbit Skin with capacity to Produce 5.000 Skins/day.

CODE - CTM-056


Project ready with:

Industry with the following sections:
Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Tanning Rabbit Skin

How to start Tanning Rabbit Skin with capacity to Produce 5.000 Skins/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Tanning Rabbit Skin

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Drying Rabbit Skins | Classification of Rabbit Skins | Tannery Model | Tanneries Bndes | How to Make a Mockup on the Computer#sclient=psy | What is the investment for rabbit fur production? | How Shampoo Industry Is Produced | Sporting Goods Store Assembly Projects | Car Rental Organization Chart | Set Up Vehicle Store | What You Need to Open a Chocolate Shop | Jewelry Factory Floor Plan | Like Snake Skin | Plant2fdrugstore | Documents Required to Open a Music School | Duck Liver Production Brazil | Machines for assembling burger joints | Stadium Grandstand Floor Plan | How to Draw a Surgical Center Floor Plan | Physiotherapy Clinic How to Set Up | Cti Drawing | How to Set Up a Children's Party Decoration Project | A Model Supermarket Floor Plan | Bndes Dance | Four-lane Bowling Alley | Study of How to Set Up a Car Wash | Work Done About Alacarte Restaurant | How to Start a Pen Business | Production of vegetable sponges | Forms for Sewing Production Control in Factories | How to Set Up an Intimate Fashion Factory | Disposable Cup Production Process Flowchart Model | Plastic Wood Flowchart | How to Make MDF Carts | Concrete Block Manufacturing Flowchart | Production Flowchart of a Concrete Plant | Cardboard Company | How to Set Up a Vehicle License Plate Company | Production Layout in Aluminum Products Companies | How to Set Up a Photography Lab at Home | Milk Powder Production Machine | How to Set Up a Mineral Water Distributor | Battery Factory Treatment Project | Pop 6 Model | Pop Laboratori Clinical Analysis | Word Template of a Cargo Transportation Company Organization Chart | Drawing of a Forest Nursery | How to Assemble a Carport | Rapid Graphics Business Plan | How to Set Up a Small Barbecue Business at Home | Project to Set Up an Ice Cream Factory | Fresh and Frozen Pasta Factory | Where to Buy Wine Making Equipment | How to Set Up a Japanese-Style Peanut Factory | Feasibility Study to Implement a Yogurt Company | What Procedures to Build a Cemetery |

 

Other projects ready:

How to start Factory to Produce Leather Scrap Bones (for Dogs) with capacity for 500 Kg/day.
Project Factory Extration and Drying of Brazil Nut (Castanha-do-Pará) with capacity to produce 500 Kg per day.
PDF Living Center for Elderlies with capacity for 100 beds.
Plant and layout Pathology and Cytopathology Laboratory.
Project Rendering with capacity for 300 tons/day.
Project Factory to Produce T-Shirts with capacity for 300 units por day.
FeasibilityIndustry to Produce Body Soap with an area of 350 m² and capacity for 5.000 kg/day.
Business plant Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 10 and 20 liters and plastic cups.
Project Maternity Hospital for 10 beds.
How to start Factory to Produce Crystallized Cashew with capacity for 1.000 Kg per day.

Project - how to start Tanning Rabbit Skin with capacity to Produce 5.000 Skins/day.