Ready project Tanning Rabbit Skin with capacity to Produce 5.000 Skins/day.
CODE - CTM-056
Ready project Tanning Rabbit Skin with capacity to Produce 5.000 Skins/day.
CODE - CTM-056Project ready with:
Industry with the following sections:Plant of the Ribeira :
Leather Reception
Soaking
De-Hairing
De-Fleshing
Classification
Splitting
De-Liming
Purge
Greasing
Pre-Tanning for wet white (Chrome Free)
Tanning wet blue (for Chrome)
Tanning Plant::
Vegetal Tanning
Classification
Lower
Re-Tanning
Dyeing
Grease
Stretching
Drying
Finishing Plant::
Sanding
Impregnation
Deep Application with airgun or Curtain or Pigmenting
Press
Final Finishing
Measurement
Stocking
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Tanning Rabbit Skin
OPTIONAL SERVICES:
- Financial Feasibility Study of Tanning Rabbit Skin with capacity to Produce 5.000 Skins/day.
- Business plan for Tanning Rabbit Skin with capacity to Produce 5.000 Skins/day.
- 3D project of Tanning Rabbit Skin with capacity to Produce 5.000 Skins/day.
Projects with other capacities
Tanning Rabbit Skin
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Tanneries Bndes | What is the investment for rabbit fur production? | Tannery Model | Classification of Rabbit Skins | How to Make a Mockup on the Computer#sclient=psy | Drying Rabbit Skins | How Shampoo Industry Is Produced | Sporting Goods Store Assembly Projects | Car Rental Organization Chart | Set Up Vehicle Store | What You Need to Open a Chocolate Shop | Jewelry Factory Floor Plan | Like Snake Skin | Plant2fdrugstore | Documents Required to Open a Music School | Duck Liver Production Brazil | Machines for assembling burger joints | Stadium Grandstand Floor Plan | How to Draw a Surgical Center Floor Plan | Physiotherapy Clinic How to Set Up | Cti Drawing | How to Set Up a Children's Party Decoration Project | A Model Supermarket Floor Plan | Bndes Dance | Four-lane Bowling Alley | Study of How to Set Up a Car Wash | Work Done About Alacarte Restaurant | How to Start a Pen Business | Production of vegetable sponges | Forms for Sewing Production Control in Factories | How to Set Up an Intimate Fashion Factory | Disposable Cup Production Process Flowchart Model | Plastic Wood Flowchart | How to Make MDF Carts | Concrete Block Manufacturing Flowchart | Production Flowchart of a Concrete Plant | Cardboard Company | How to Set Up a Vehicle License Plate Company | Production Layout in Aluminum Products Companies | How to Set Up a Photography Lab at Home | Milk Powder Production Machine | How to Set Up a Mineral Water Distributor | Battery Factory Treatment Project | Pop 6 Model | Pop Laboratori Clinical Analysis | Word Template of a Cargo Transportation Company Organization Chart | Drawing of a Forest Nursery | How to Assemble a Carport | Rapid Graphics Business Plan | How to Set Up a Small Barbecue Business at Home | Project to Set Up an Ice Cream Factory | Fresh and Frozen Pasta Factory | Where to Buy Wine Making Equipment | How to Set Up a Japanese-Style Peanut Factory | Feasibility Study to Implement a Yogurt Company | What Procedures to Build a Cemetery |
Other projects ready:
How to start Clothing Industry to Produce Knitwear and Sweatshirts with capacity for 200 garments/day.
Project Footwear Industry to Produce Sneakers with capacity for 100 pairs/day.
PDF Factory to Produce Hydrophilic Cotton with capacity for 500 packages per day.
Plant and layout Slaughterhouse to Sluaghter Swine with capacity about 40 to 100 animals/day and industrialization of Cold Meat (Hams, Sausages, Salami, Meats, Cured Food, etc) with Built area of 700 m² (837,2 sq.yd).
Project Comercial Laundry with capacity for 2.000 kg of Clothes per day.
Project Marble and Granite Factories to Produce Cutted Stones with capacity for 8 Blocks per Week.
FeasibilityFactory to Produce Gauze Compress (without Sterilization) with an area of 250 m².
Business plant Milk and Dairy Industry to Produce Ultrafiltration Brie Cheese with capacity for 70.000 liters of Milk per day.
Project Flower Shop with an area of 500 m2.
How to start Factory to Produce Paper Coffee Strainer with capacity for 300 boxes/day.



