Ready project Wood Chips and Sawdust with capacity for 15 tons/day.

CODE - IND-M-071

Ready project Wood Chips and Sawdust with capacity for 15 tons/day.

CODE - IND-M-071


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Production Room
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Wood Chips and Sawdust

How to start Wood Chips and Sawdust with capacity for 15 tons/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Wood Chips and Sawdust

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Formalize a Sawmill Company | How to Set Up a Small Sawmill | How to Open a Sawmill | How to Set Up Your Sawmill | Sawmill Project | Sawmill Project | How to Open Sawmills | How to Set Up a Sawmill | Sawmill | How to Open a Sawmill Business | Sawmill Design Template | How to Build a Sawmill | Sawmill for 15 tons per day | Sawmill Model | Plan to Set Up a Sawmill | How to Set Up a Sawmill | Land in Sawmill Financed | Sawmill Opening a Business | Work Plan for Sawmill | How to Organize a Sawmill | DWG Sawmill Project | Sawmill Floor Plan Template | What Do I Need to Open a Locksmith? | How to Set Up a Good Sawmill | Micro Sawmill | Build a Sawmill | How to Set Up a Sawmill | Sample of a Sawmill Project | How to Design a Sawmill | Sawmill Project | How to Open a Mermaid Shop | Sawmill Construction Project | Setting Up a Sawmill | How to Set Up a Granite Sawmill | How to Develop a Sawmill Project | Open a Mermaid Shop | Buy Cerarria | Sawmill Projects | How to Build a Sawmill | How to Set Up a Sawmill | How to Set Up a Small Sawmill | Assemble Sawmill | Financing to Open a Sawmill | DWG Sawmill Plant | Assemble Sawmill | Project for a Sawmill | Organize Sawmill | How to Organize a Sawmill | How to Open a Sawmill | How to Set Up a Sawmill Project | Free-range poultry house plan for 1000 birds | Cleaning Material Industry Project | How Much Will It Cost Me to Set Up a Screw Shop? | Oil Change Shop Template | How to Set Up a Roast Chicken Shop | How to Open a Fish Shop | Tempered Glass Projects | Clothing Store Floor Plan | Beverage Distributor Layout | Nursery Business Plan | 2cproject model for BNDES | Artisanal Sausage Making-project | P2f Shrimp Processing Plants | Hospital Waste Incinerator Manufacturer | Pop In Vaccine Room | Motel Suite Projects | Fishing Business Plan | What Is A Commercial Kitchen Business Plan? | Arrange Bar Tables | Small Snack Bar Projects | How to Design a Residential Building | Floor Plan of an Immunology Section | Paint Industry Assemble | Sales Budget for a Clothing Factory | How to Set Up a Capotão Ball Factory | What Equipment Do I Need to Set Up a PVC Ceiling Factory? | Styrofoam Block Factory | Loyalty of Sawmills | Phosphate Stick Factory | How to Set Up a Mortar Industry | How to Make an Egg Carton | Raw Materials for Zinc Plating | Soil Analysis Form | Suppliers of Type B Coalho Cheese | Good Handling Practices Manual Template | Body Shop Layout | Construction Legislation for Quail Eggs | Pop Sanitization for Mineral Water | Gas Resale Model | How to Create a Price List for a Barber Shop | Commercial Office Floor Plan Template | Setting Up Office Layout | Organizational Chart of a Home Appliances Company | How to Set Up an Agricultural Services Company | Pig Shed Project | Pizza Equipment Factories | Equipment Lists for Making Pamonhas | Microwave Popcorn Flowchart | Grinding Flowchart | Raw Material Juice Powder | View Hotel Projects |

 

Other projects ready:

How to start Milk and Dairy Industry to Produce Autoclaving UHT Milk with capacity for 3.000 liters/day.
Project Slaughterhouse Bovines, Swines and Ostrich with capacity for 100 animals per day.
PDF Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Carcass Reception) with capacity for 10.000 Kg/day.
Plant and layout Factory to Produce Ice Cream Syrup with capacity for 20.000 Kg/day.
Project Factory to Produce Vinegar made from Apple with capacity for 3.000 liters/day.
Project Milk and Dairy Industry to be built in 2 phases: 1st Phase: Organic Cheese Factory to Produce Fresh Cheese (Ricota, Muzzarela, Minas Frescal), Matured Cheese (Prato, Minas Standard, Cobocó) and Parmesan Cheese, with an area of 178 m2 and capacity for 4.000 liters/day. 2nd Phase: Amplification to Produce Yoghurt and Milky Beverages, with total area of 216 m2 and capacity for 6.000 liters/day.
FeasibilityFactory to Produce Milk Powder with capacity for 3.000 liters/day.
Business plant Clothing Industry to Produce Knitting (Rectilinear Knitting Machines) with capacity for 100 garments/day.
Project Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Carcass Reception) with capacity for 3.000 Kg/day.
How to start Ice Cream Parlor with an area of 300 m2.

Project - how to start Wood Chips and Sawdust with capacity for 15 tons/day.